Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01333971 ↗ ServiceMax

TEXAS MEDICAL SCREENING • Preventive Maintenance • PSM

📍 Rayethon — 2000 E. El Segundo Blvd BLDG E1, El Segundo CA, 90245

Jan 7, 2026 → Apr 30, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 5 biz days
Paused: 74 biz days
🕐 Clock stopped: Completed (Apr 30, 2026)
▶ Clock Running
Status: Created
Jan 7 → Jan 7, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 7 → Jan 7, 2026
0 business days (counted)
Running total: 0 of ? biz days used
⏸74d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 23, 2026
74 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Apr 23 → Apr 23, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Apr 23 → Apr 23, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 23 → Apr 28, 2026
3 business days (counted)
Running total: 3 of ? biz days used
▶ Clock Running
Status: Entered
Apr 28 → Apr 28, 2026
0 business days (counted)
Running total: 3 of ? biz days used
▶ Clock Running
Status: Assigned
Apr 28 → Apr 28, 2026
0 business days (counted)
Running total: 3 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 28 → Apr 30, 2026
2 business days (counted)
Running total: 5 of ? biz days used
▶ Clock Running
Status: Tech On Site
Apr 30 → Apr 30, 2026
0 business days (counted)
Running total: 5 of ? biz days used
Created: Jan 7, 2026 Completed: Apr 30, 2026
Show SLA Clock Detail (10 periods)
Period Status Clock Biz Days Running Total
Jan 7 → Jan 7 Created ▶ Running 0 0
Jan 7 → Jan 7 Ready for Scheduling ▶ Running 0 0
Jan 7 → Apr 23 Ready for Release ⏸ Paused 74
Apr 23 → Apr 23 Ready for Scheduling ▶ Running 0 0
Apr 23 → Apr 23 Assigned ▶ Running 0 0
Apr 23 → Apr 28 Scheduled ▶ Running 3 3
Apr 28 → Apr 28 Entered ▶ Running 0 3
Apr 28 → Apr 28 Assigned ▶ Running 0 3
Apr 28 → Apr 30 Scheduled ▶ Running 2 5
Apr 30 → Apr 30 Tech On Site ▶ Running 0 5
Dispatch 0.3d
Holding 74.3d (excluded)
Coordinators 6.0d
Field Work 0.2d
Billing 2.4d
✗ SLA Missed
Dispatch
0.3 days
Holding (excluded from total)
74.3 days
Coordinators
6.0 days
Over SLA
Field Work
0.2 days
Billing
2.4 days
Over SLA
Created: Jan 7, 2026 Due: Apr 30, 2026 Completed: Apr 30, 2026 (on time)
📅
79.5 days Total Age
⏱️
74.3d in Ready for Release Longest Stage
🔄
17 transitions Status Changes
⚠️
2.5d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
6 lines Work Details
🏠
2 visits On-Site Trips
👤
Self-Scheduled Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Omar Serrano — scheduling delays attributed to technician, not coordinators
Visit 1 Apr 28, 2026
Visit 2 Apr 29, 2026

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 221 days old
🚨
Primary Delay 74.3 days stuck in "Ready for Release"
⏱️
Total Delay 2.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.3d / 0.5d SLA
Ready for Scheduling
0.5d / 1.0d SLA
Ready for Release
74.3d
Assigned
0.0d / 0.5d SLA
Scheduled
5.4d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
2.2d / 1.0d SLA
WO Correction Needed
0.2d
Ready to Bill
1.7d / 1.0d SLA
Billing Review
0.5d / 2.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

5.1.26 hshaw - chat JPastore to confirm the entries were valid.

4.30.2026 OS mileage already on WO for myself (4/29)


4.30.26 hshaw - missing mileage on 4/28, please confirm what the FU is required.

4-23 Mburris called and set appt with POC Precious Achuff set for 4-28 10am 

🔧 Work Performed
- Called POC to locate unit in need of PM - Met with escort to be taken to unit and perform PM on unit - Arrived at unit, everything appeared to be in good condition - wiped unit down and performed a BP test with unit - unit appeared to be working properly - opened back of unit and dusted - connected manometer and put unit in service mode - began bp test at every 50mmHg up to 300mmHg - checked counter meter - closed unit back up and completed checklist - at checklist discovered manometer calibration was expired - Ordered calibrated manometer Omar serrano Arrived on site and checked in with security who then got ahold of POC to meet me at lobby. Once escorted to unit verified correct unit and conducted Full PM on unit. Ensuring to follow all steps listed in work instructions, completed all required test with no issues. Completed Pm checklist and informed customer unit having no further issues
🔍 Technician Findings
Counter# 4,563. Arrived on site and found unit with PM required
⚠️ Problem Description
Please Perform the PM for this Kiosk based on the product listed in the work order: 90550, LC300, LC500. ***IMPORTANT CHANGE**** Please Log/notate in the technician findings the number of times the kiosk was used and double check the SN. If the SN is different than in the work order please also notate the correct SN. Regardless if the SN matches continue to perform the PM service. If location is a non-retail location a call ahead to schedule is required PM Checklist Tips: If Checklist is not populating, make sure the order type contains 'PM' and the product must contain an 90550, LC300 or LC500. Update the order status to 'tech onsite' and the workflow will look for the parameters in which a PM checklist is required and will auto attach. Common missed step: After you Finalize the checklist you must select 'Print checklist' for the checklist to attach to the work order for the billing reviewer to review. **IMPORTANT** This is a Non Retail location and a scheduled appointment must be made in advance to ensure the machine will be made available prior to tech arrival on site. If a work market technician has to be used SDL must obtain approval from Higi prior to scheduling work. If the technician is unable to make contact on the first attempt, email EMSAR at higisupport@emsar.com so HIGI can be notified to provide us with an alternate contact name and number. Any calls made MUST be logged on the work order under Activity History with who you spoke to and date/time of call
📄 Description
Model 300 with Backboard

Timeline

📋
Work Order Created Jan 7, 11:09 AM
Work Order: WO-01333971
Type: Preventive Maintenance
Priority: PSM
📅
Status: Ready for Scheduling by Jessica Foley Jan 7, 1:43 PM
From: Entered
To: Ready for Scheduling
Duration in Previous: 2h 33m
Status: Ready for Release by Allison Belyea Jan 7, 4:37 PM
From: Ready for Scheduling
To: Ready for Release
Duration in Previous: 2h 53m
🚨 74.9 business days
📅
Status: Ready for Scheduling by Chris Bakkemo Apr 23, 1:41 PM
From: Ready for Release
To: Ready for Scheduling
Duration in Previous: 105d 20h
👷
2 Technician Assigned Apr 23, 2:52 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Michael Burris
From: Ready for Scheduling
To: Assigned
Duration in Previous: 1h 10m
🗓️
2 Status: Scheduled Apr 23, 2:59 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Michael Burris
Scheduled For: 2026-04-28T17:00:00.000+0000
4.0 business days
🆕
3 Status: Entered Apr 28, 4:09 PM
Status: Entered → Technician Assigned → Dispatch Scheduled
👷
Technician Assigned by Michael Burris
Technician: Omar Serrano
📅
Dispatch Scheduled by Michael Burris
Scheduled For: 2026-04-29T16:00:00.000+0000
⏱️
2x Labor Added Apr 28, 4:23 PM
Type: Labor
Status: Open
Qty: 2, 1.25
2.0 business days
🚗
2 3x Travel Added Apr 29, 10:42 PM
3x Travel Added → Status: Tech On Site
🔧
Status: Tech On Site by Omar Serrano
From: Scheduled
To: Tech On Site
Duration in Previous: 1d 6h
✔️
Status: Completed by Omar Serrano Apr 29, 11:53 PM
From: Tech On Site
To: Completed
Duration in Previous: 1h 11m
🏁
Status: Closed by Omar Serrano Apr 30, 12:00 AM
From: Completed
To: Closed
Duration in Previous: 6m
✏️
Status: WO Correction Needed by Hannah Shaw Apr 30, 4:59 PM
From: Closed
To: WO Correction Needed
Duration in Previous: 16h 58m
🏁
Status: Closed by Omar Serrano Apr 30, 6:19 PM
From: WO Correction Needed
To: Closed
Duration in Previous: 1h 20m
📄
Status: Ready to Bill by Hannah Shaw May 1, 10:29 AM
From: Closed
To: Ready to Bill
Duration in Previous: 16h 9m
💵
Status: Billing Review by Hannah Shaw May 1, 11:08 AM
From: Ready to Bill
To: Billing Review
Duration in Previous: 39m
✏️
3 Status: WO Correction Needed May 1, 2:58 PM
Status: WO Correction Needed → Travel Added → Status: Ready to Bill
🚗
Travel Added
Type: Travel
Status: Open
Qty: 25
📄
Status: Ready to Bill by Hannah Shaw
From: WO Correction Needed
To: Ready to Bill
Duration in Previous: 2m
2.0 business days
📨
2 Status: Invoice Pending May 4, 10:27 AM
Status: Invoice Pending → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 2m
🧾
Invoice Created May 4, 3:09 PM
Invoice Number: SM-260879

Bottlenecks

Scheduled
Duration: 3.6 business days (threshold: 2.0 business days)
Exceeded by 1.6 business days
Closed
Duration: 1.2 business days (threshold: 1.0 business days)
Exceeded by 1.7 business hours
Ready to Bill
Duration: 1.6 business days (threshold: 1.0 business days)
Exceeded by 5.0 business hours

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Omar Serrano
Scheduled
Apr 29, 12:00 PM
Created
Jan 7, 11:09 AM
Invoice #
SM-260879

Work Details (6)

Name Type Status Qty Amount Date
WL-03203935 Labor Open 2 $0.00 Apr 28, 4:23 PM
WL-03203936 Labor Open 1.25 $0.00 Apr 28, 4:23 PM
WL-03208373 Travel Open 24 $0.00 Apr 29, 10:42 PM
WL-03208374 Labor Open 1 $0.00 Apr 29, 10:42 PM
WL-03208375 Labor Open 1.5 $0.00 Apr 29, 10:42 PM
WL-03211159 Travel Open 25 $0.00 May 1, 3:00 PM

Details