📍 LEWIS FAMILY DRUG #43 — 119 6TH AVE SW, Aberdeen SD, 57401
Jan 7, 2026 → Jun 10, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (9 biz days late)
Active: 26 biz days
Paused: 81 biz days
🕐 Clock stopped: Tech Off Site (Jun 10, 2026)
▶ Clock Running
Status: Created
Jan 7 → Jan 7, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 7 → Jan 7, 2026
0 business days (counted)
Running total: 0 of ? biz days used
⏸74d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 23, 2026
74 business days (not counted)
▶ Clock Running
Status: Assigned
Apr 23 → Apr 23, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 23 → Apr 29, 2026
4 business days (counted)
Running total: 4 of ? biz days used
▶ Clock Running
Status: Entered
Apr 29 → Apr 29, 2026
0 business days (counted)
Running total: 4 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Apr 29 → May 8, 2026
7 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
May 8 → May 20, 2026
8 business days (counted)
Running total: 12 of ? biz days used
▶ Clock Running
Status: Assigned
May 20 → May 20, 2026
0 business days (counted)
Running total: 12 of ? biz days used
14d
▶ Clock Running
Status: Scheduled
May 20 → Jun 10, 2026
14 business days (counted)
Running total: 26 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jun 10 → Jun 10, 2026
0 business days (counted)
Running total: 26 of ? biz days used
Created: Jan 7, 2026Tech Off Site: Jun 10, 2026
Show SLA Clock Detail (11 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 7 → Jan 7
Created
▶ Running
0
0
Jan 7 → Jan 7
Ready for Scheduling
▶ Running
0
0
Jan 7 → Apr 23
Ready for Release
⏸ Paused
74
—
Apr 23 → Apr 23
Assigned
▶ Running
0
0
Apr 23 → Apr 29
Scheduled
▶ Running
4
4
Apr 29 → Apr 29
Entered
▶ Running
0
4
Apr 29 → May 8
Ready for Release
⏸ Paused
7
—
May 8 → May 20
Ready for Scheduling
▶ Running
8
12
May 20 → May 20
Assigned
▶ Running
0
12
May 20 → Jun 10
Scheduled
▶ Running
14
26
Jun 10 → Jun 10
Tech On Site
▶ Running
0
26
Dispatch0.3d
Holding82.3d (excluded)
Coordinators28.6d
Field Work0.6d
Billing2.0d
✗ SLA Missed
Dispatch
0.3 days
Holding(excluded from total)
82.3 days
Coordinators
28.6 days
Over SLA
Field Work
0.6 days
Billing
2.0 days
Over SLA
Created: Jan 7, 2026
Due: May 31, 2026
Completed: Jun 10, 2026 (9 days late)
📅
108.0 daysTotal Age
⏱️
74.3d in Ready for ReleaseLongest Stage
🔄
13 transitionsStatus Changes
⚠️
24.6d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
8 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 221 days old
🚨
Primary Delay74.3 days stuck in "Ready for Release"
⏱️
Total Delay24.6 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.3d / 0.5d SLA
Ready for Scheduling
9.4d / 1.0d SLA
Ready for Release
82.3d
Scheduled
19.2d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Tech Off Site
0.5d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.3d / 1.0d SLA
Ready to Bill
2.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
4/28/26 Rberry- Placed WO back into ready for release. Technician cannot complete this trip.
🔧Work Performed
Traced leak to cuff assembly. Clamped off internal tubing and found leak is coming from cuff assembly. either cuff or the tubing.
🔍Technician Findings
Unit has air leak in cuff.
⚠️Problem Description
Please Perform the PM for this Kiosk based on the product listed in the work order: 90550, LC300, LC500.
***IMPORTANT CHANGE****
Please Log/notate in the technician findings the number of times the kiosk was used and double check the SN. If the SN is different than in the work order please also notate the correct SN. Regardless if the SN matches continue to perform the PM service.
If location is a non-retail location a call ahead to schedule is required
PM Checklist Tips:
If Checklist is not populating, make sure the order type contains 'PM' and the product must contain an 90550, LC300 or LC500. Update the order status to 'tech onsite' and the workflow will look for the parameters in which a PM checklist is required and will auto attach.
Common missed step: After you Finalize the checklist you must select 'Print checklist' for the checklist to attach to the work order for the billing reviewer to review.
📄Description
Model 300 with Backboard
📅
WO-01333979 - Preventive Maintenance - DD: 5/31/2026 - - LC300-15 - Aberdeen - LEWIS FAMILY DRUG #43
Jun 10, 2026 2:00pm – 3:00pm
Work Order: WO-01333979
Account: TEXAS MEDICAL SCREENING
Customer Case Number:
Location: LEWIS FAMILY DRUG #43
Address: 119 6TH AVE SW, Aberdeen, SD 57401
Manufacturer:
Model #: LC300-15
Serial #: 300-005088
Contact Name:
Contact Phone: 605-262-0283
Contact Email:
Due Date: 5/31/2026
Scheduled D