Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (3 biz days late)
Active: 20 biz days
Paused: 75 biz days
🕐 Clock stopped: Tech Off Site (May 22, 2026)
▶ Clock Running
Status: Created
Jan 7 → Jan 7, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 7 → Jan 7, 2026
0 business days (counted)
Running total: 0 of ? biz days used
⏸75d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Apr 24, 2026
75 business days (not counted)
13d
▶ Clock Running
Status: Ready for Scheduling
Apr 24 → May 13, 2026
13 business days (counted)
Running total: 13 of ? biz days used
▶ Clock Running
Status: Assigned
May 13 → May 22, 2026
7 business days (counted)
Running total: 20 of ? biz days used
▶ Clock Running
Status: Scheduled
May 22 → May 22, 2026
0 business days (counted)
Running total: 20 of ? biz days used
▶ Clock Running
Status: Tech On Site
May 22 → May 22, 2026
0 business days (counted)
Running total: 20 of ? biz days used
Created: Jan 7, 2026Tech Off Site: May 22, 2026
Show SLA Clock Detail (7 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 7 → Jan 7
Created
▶ Running
0
0
Jan 7 → Jan 7
Ready for Scheduling
▶ Running
0
0
Jan 7 → Apr 24
Ready for Release
⏸ Paused
75
—
Apr 24 → May 13
Ready for Scheduling
▶ Running
13
13
May 13 → May 22
Assigned
▶ Running
7
20
May 22 → May 22
Scheduled
▶ Running
0
20
May 22 → May 22
Tech On Site
▶ Running
0
20
Dispatch0.3d
Holding75.3d (excluded)
Coordinators21.5d
Field Work0.7d
Billing2.0d
✗ SLA Missed
Dispatch
0.3 days
Holding(excluded from total)
75.3 days
Coordinators
21.5 days
Over SLA
Field Work
0.7 days
Billing
2.0 days
Over SLA
Created: Jan 7, 2026
Due: May 31, 2026
Completed: May 22, 2026 (9 days early)
📅
96.0 daysTotal Age
⏱️
75.3d in Ready for ReleaseLongest Stage
🔄
11 transitionsStatus Changes
⚠️
20.8d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 221 days old
🚨
Primary Delay75.3 days stuck in "Ready for Release"
⏱️
Total Delay20.8 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.3d / 0.5d SLA
Ready for Scheduling
13.9d / 1.0d SLA
Ready for Release
75.3d
Assigned
7.3d / 0.5d SLA
Scheduled
0.3d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Tech Off Site
0.6d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.4d / 1.0d SLA
Ready to Bill
2.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
4/24/2026 CRamen left a vm (248) 835-6751 for a returned call to schedule for Monday 4/27/2026 with tech arrival between 8-10am.
CONFIRMED
04/24/2026 LHill-Called (248) 835-6751 for Jacob.
Unit is onsite: Yes
Address confirmed: Yes
Scheduling ahead needed: No. Tech must call when they arrive so he can let them in.
Certain day or time: M-F 8:00AM-4PM
Confirmed contact information is correct: Yes
Unit is located in cafeteria
🔧Work Performed
Performed PM on unit per service bulletin successfully.
🔍Technician Findings
Counter# 101,198.
Unit working upon arrival.
⚠️Problem Description
Please Perform the PM for this Kiosk based on the product listed in the work order: 90550, LC300, LC500.
***IMPORTANT CHANGE****
Please Log/notate in the technician findings the number of times the kiosk was used and double check the SN. If the SN is different than in the work order please also notate the correct SN. Regardless if the SN matches continue to perform the PM service.
If location is a non-retail location a call ahead to schedule is required
PM Checklist Tips:
If Checklist is not populating, make sure the order type contains 'PM' and the product must contain an 90550, LC300 or LC500. Update the order status to 'tech onsite' and the workflow will look for the parameters in which a PM checklist is required and will auto attach.
Common missed step: After you Finalize the checklist you must select 'Print checklist' for the checklist to attach to the work order for the billing reviewer to review.
**IMPORTANT** This is a Non Retail location and a scheduled appointment must be made in advance to ensure the machine will be made available prior to tech arrival on site. If a work market technician has to be used SDL must obtain approval from Higi prior to scheduling work. If the technician is unable to make contact on the first attempt, email EMSAR at higisupport@emsar.com so HIGI can be notified to provide us with an alternate contact name and number. Any calls made MUST be logged on the work order under Activity History with who you spoke to and date/time of call
📄Description
Model 300 with Backboard
📋
Outbound to +12488356751
Completed Apr 24, 2026
4/24/2026 CRamen left a vm (248) 835-6751 for a returned call to schedule for Monday 4/27/2026 with tech arrival between 8-10am.
📋
Outbound to +12488356751
Completed Apr 24, 2026
📋
Outbound to +12488356751
Completed Apr 24, 2026
📋
Outbound to +12488356751
Completed Apr 24, 2026
04/24/2026 LHill-Called (248) 835-6751 for Jacob.
Unit is onsite: Yes
Address confirmed: Yes
Scheduling ahead needed: No. Tech must call when they arrive so he can let them in.
Certain day or time: M-F 8:00AM-4PM
Confirmed contact information is correct: Yes
Unit is located in cafeteria
Work Order: WO-01333982
Account: TEXAS MEDICAL SCREENING
Customer Case Number:
Location: Joyson Safety Systems
Address: 2500 Innovation Dr, Auburn Hills, MI 48326
Manufacturer:
Model #: LC300-15
Serial #: 300-005735
Contact Name: Jacob Johansson
Contact Phone: (248) 835-6751
Contact Email:
Due Da