📍 Rutherford Regional Health System — 288 South Ridgecrest Avenue, Rutherfordton NC, 28139
Jan 8, 2026 → Jan 12, 2026
✅ Completed
PSMLast business day of January 2026
Target:Jan 30, 2026
🕐 Clock stopped: Completed (Jan 13)
✓ SLA Met (17d early)
Dispatch0.0d
Coordinators2.9d
Field Work0.0d
Billing0.1d
✓ SLA Met
Dispatch
0.0 days
Coordinators
2.9 days
Over SLA
Field Work
0.0 days
Billing
0.1 days
Created: Jan 8, 2026
Due: Jan 31, 2026
Completed: Jan 13, 2026 (18 days early)
📅
2.9 daysTotal Age
⏱️
2.8d in AssignedLongest Stage
🔄
8 transitionsStatus Changes
⚠️
2.3d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
1 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 126 days old
🚨
Primary Delay2.8 days stuck in "Assigned"
⏱️
Total Delay2.3 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.2d / 1.0d SLA
Assigned
2.8d / 0.5d SLA
Tech On Site
0.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
1/8/26 AJinerson - WO appeared on maps layer as SC GE site, this got assigned incorrectly during mass assigning the SC GE PMs by accident due to placement on maps layer. Placing back into RFS.
🔧Work Performed
checked all functions of bed to ensure all were functioning properly. I checked electrical with analyzer, checked scale with 2 50 LB weights and checked side communications with side rail tester. all functions were within spec and working fine.