📍 Rutherford Regional Health System — 288 South Ridgecrest Avenue, Rutherfordton NC, 28139
Jan 8, 2026 → Jan 12, 2026
✅ Completed
PSMLast business day of January 2026
Target:Jan 30, 2026
🕐 Clock stopped: Completed (Jan 13)
✓ SLA Met (17d early)
Coordinators2.9d
Field Work0.0d
Billing0.1d
✓ SLA Met
Coordinators
2.9 days
Over SLA
Field Work
0.0 days
Billing
0.1 days
Created: Jan 8, 2026
Due: Jan 31, 2026
Completed: Jan 13, 2026 (18 days early)
📅
2.9 daysTotal Age
⏱️
2.7d in AssignedLongest Stage
🔄
9 transitionsStatus Changes
⚠️
2.2d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
1 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 126 days old
🚨
Primary Delay2.7 days stuck in "Assigned"
⏱️
Total Delay2.2 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.2d / 1.0d SLA
Assigned
2.7d / 0.5d SLA
Tech On Site
0.0d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
1/8/26 AJinerson - WO appeared on maps layer as SC GE site, this got scheduled during mass scheduling SC GE PMs by accident. Placing back into RFS.
🔧Work Performed
checked all functions of bed to ensure all were functioning properly. I checked electrical with analyzer, and checked side communications with side rail tester. all functions were within spec and working fine.