📍 Southampton Memorial Hospital — 100 Fairview Dr, Franklin VA, 23851
Jan 9, 2026 → Feb 11, 2026
✅ Completed
PSMLast business day of January 2026
Target:Jan 30, 2026
🕐 Clock stopped: Completed (Feb 12)
✗ SLA Missed (12d late)
Coordinators25.2d
Billing6.7d
✗ SLA Missed
Coordinators
25.2 days
Over SLA
Billing
6.7 days
Over SLA
Created: Jan 9, 2026
Due: Mar 31, 2026
Completed: Feb 12, 2026 (47 days early)
📅
24.2 daysTotal Age
⏱️
23.2d in AssignedLongest Stage
🔄
6 transitionsStatus Changes
⚠️
36.7d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
1 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 125 days old
🚨
Primary Delay23.2 days stuck in "Assigned"
⏱️
Total Delay36.7 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Ready for Scheduling
2.0d / 1.0d SLA
Assigned
23.2d / 0.5d SLA
Closed
10.0d / 1.0d SLA
Billing Review
6.0d / 2.0d SLA
Ready to Bill
0.6d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
2.25.26 hshaw - moved WO to BR, TA not populated
🔧Work Performed
checked all functions of bed to ensure all were functioning properly. I checked electrical with safety analyzer. I placed bed back into service and is ready for use.