Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (23 biz days late)
Active: 34 biz days
🕐 Clock stopped: Completed (Mar 6, 2026)
▶ Clock Running
Status: Created
Jan 15 → Jan 16, 2026
1 business day (counted)
Running total: 1 of ? biz days used
33d
▶ Clock Running
Status: Assigned
Jan 16 → Mar 6, 2026
33 business days (counted)
Running total: 34 of ? biz days used
Created: Jan 15, 2026Completed: Mar 6, 2026
Show SLA Clock Detail (2 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 15 → Jan 16
Created
▶ Running
1
1
Jan 16 → Mar 6
Assigned
▶ Running
33
34
Dispatch2.0d
Coordinators34.0d
Field Work0.0d
Billing15.9d
✗ SLA Missed
Dispatch
2.0 days
Over SLA
Coordinators
34.0 days
Over SLA
Field Work
0.0 days
Billing
15.9 days
Over SLA
Created: Jan 15, 2026
Due: Feb 15, 2026
Completed: Mar 6, 2026 (18 days late)
📅
35.0 daysTotal Age
⏱️
34.0d in AssignedLongest Stage
🔄
7 transitionsStatus Changes
⚠️
48.5d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 213 days old
🚨
Primary Delay34.0 days stuck in "Assigned"
⏱️
Total Delay48.5 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
2.0d / 0.5d SLA
Assigned
34.0d / 0.5d SLA
Completed
0.0d / 1.0d SLA
Closed
1.7d / 1.0d SLA
Billing Review
0.1d / 2.0d SLA
Ready to Bill
1.8d / 1.0d SLA
Invoice Pending
14.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
2/11/2026 Evaluated, cleaned and replaced filaments. Put on test fixture. 9 range background, let run.
3/4/2026 Replaced filaments and recleaned. Put back on test fixture.
3/5/2026 11 range on both filaments, in specs OK. Minh used on 6008369591.
3/5/2026 installed exchange spectrometer test on #2 test bench. Both filaments passed
calibration, 11 range solid, did not see -9 range background. Started up unit,
perform fine test procedure, record parameter, chart record N/A Unit leak check ok shut off
unit, pack it up, ship unit back to customer.
🔍Technician Findings
-9 range background Spectrometer.
⚠️Problem Description
Note
14.01.2026 12:11:17 WF-BATCH
Agent: WIGEORGE Timestamp: 2026-01-14 12:11:09
Once the quotation has been accepted, please create a service order, and assign it to the service employee group 98004017
Trade services; if a "Request for RA" form is returned with the purchase order, please attach it to the notification e-mail.
bench warranty; background creeping into 6 E-10
📄Description
Helium Leak Detector, MD15, Dry Scroll IPD-15
📞Call Description
VPD Bench Repair Warranty
Mar 9, 2026 9:22am
@MICHAEL MCNAMARA @Kim Pearson I changed the Labor Activity Type from Overhaul to Repair/PM. Thank you
Timeline
📋
Work Order Created Jan 15, 9:00 AM
Work Order:WO-01337987
Type:Overhaul
Priority:PSM
⏳2.0 business days
👷
▶
2
Technician Assigned Jan 16, 9:18 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kim Pearson
From:Entered
To:Assigned
Duration in Previous:1d 0h
🚨34.0 business days
🔩
▶
3
2x Parts Added Mar 6, 1:10 PM
2x Parts Added → Labor Added → Status: Completed
⏱️
Labor Added
Type:Labor
Status:Open
Qty:8
✔️
Status: Completed by Minh Huynh
From:Assigned
To:Completed
Duration in Previous:49d 3h
🏁
Status: Closed by Minh HuynhMar 6, 1:19 PM
From:Completed
To:Closed
Duration in Previous:5m
⏳2.0 business days
💵
Status: Billing Review by Hannah ShawMar 9, 9:20 AM
From:Closed
To:Billing Review
Duration in Previous:2d 19h
📄
Status: Ready to Bill by MICHAEL MCNAMARAMar 9, 10:17 AM
From:Billing Review
To:Ready to Bill
Duration in Previous:57m
📨
Status: Invoice Pending by Hannah ShawMar 10, 2:21 AM
From:Ready to Bill
To:Invoice Pending
Duration in Previous:16h 3m
🚨14.0 business days
🧾
▶
2
Invoice Created Mar 27, 9:07 AM
Invoice Created → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From:Invoice Pending
To:Invoiced
Duration in Previous:17d 6h
Bottlenecks
Entered
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Assigned
Duration: 34.0 business days (threshold: 4.0 business hours)
Exceeded by 33.5 business days
Closed
Duration: 1.7 business days (threshold: 1.0 business days)
Exceeded by 5.7 business hours
Ready to Bill
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.4 business hours
Invoice Pending
Duration: 14.0 business days (threshold: 2.0 business days)