📍 Illinois River Correctional Center - Aetna — 1300 West Locust St., Canton IL, 61520
Feb 3, 2026 → Feb 16, 2026
✅ Completed
P4
SLA Clock
4 business days from creation · Target: Feb 9, 2026
✗ SLA Missed
Active: 4 biz days
Paused: 1 biz days
Budget: 4 biz days
🕐 Clock stopped: Tech Off Site (Feb 10, 2026)
SLA Target
▶ Clock Running
Status: Created
Feb 3 → Feb 3, 2026
0 business days (counted)
Running total: 0 of 4 biz days used
▶ Clock Running
Status: L2 Screening
Feb 3 → Feb 3, 2026
0 business days (counted)
Running total: 0 of 4 biz days used
⏸1d
⏸ Clock Paused
Status: Awaiting Parts
Feb 3 → Feb 4, 2026
1 business day (not counted)
▶ Clock Running
Status: Ready for Scheduling
Feb 4 → Feb 4, 2026
0 business days (counted)
Running total: 0 of 4 biz days used
▶ Clock Running
Status: Assigned
Feb 4 → Feb 4, 2026
0 business days (counted)
Running total: 0 of 4 biz days used
4d
▶ Clock Running
Status: Scheduled
Feb 4 → Feb 10, 2026
4 business days (counted)
Running total: 4 of 4 biz days used
▶ Clock Running
Status: Tech On Site
Feb 10 → Feb 10, 2026
0 business days (counted)
Running total: 4 of 4 biz days used
Created: Feb 3, 2026Tech Off Site: Feb 10, 2026
Business Days Used4 / 4
04d budget
Show SLA Clock Detail (7 periods)
Period
Status
Clock
Biz Days
Running Total
Feb 3 → Feb 3
Created
▶ Running
0
0 / 4
Feb 3 → Feb 3
L2 Screening
▶ Running
0
0 / 4
Feb 3 → Feb 4
Awaiting Parts
⏸ Paused
1
—
Feb 4 → Feb 4
Ready for Scheduling
▶ Running
0
0 / 4
Feb 4 → Feb 4
Assigned
▶ Running
0
0 / 4
Feb 4 → Feb 10
Scheduled
▶ Running
4
4 / 4
Feb 10 → Feb 10
Tech On Site
▶ Running
0
4 / 4
Dispatch0.2d
Material Management1.1d
Coordinators4.7d
Field Work3.9d
Billing3.5d
✗ SLA Missed
Dispatch
0.2 days
Material Management
1.1 days
Coordinators
4.7 days
Over SLA
Field Work
3.9 days
Over SLA
Billing
3.5 days
Created: Feb 3, 2026
Due: Feb 9, 2026
Completed: Feb 16, 2026 (6 days late)
📅
8.3 daysTotal Age
⏱️
7.9d in ClosedLongest Stage
🔄
13 transitionsStatus Changes
⚠️
11.4d overTotal Delay
📦
2 orders, 0 quotesParts & Quotes
📝
9 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 191 days old
🚨
Primary Delay7.9 days stuck in "Closed"
⏱️
Total Delay11.4 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
L2 Screening
0.2d / 1.0d SLA
Awaiting Parts
1.1d / 3.0d SLA
Ready for Scheduling
0.2d / 1.0d SLA
Assigned
0.0d / 0.5d SLA
Scheduled
4.5d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Tech Off Site
0.8d / 2.0d SLA
Completed
3.0d / 1.0d SLA
Closed
8.2d / 1.0d SLA
WO Correction Needed
3.1d
Ready to Bill
0.3d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
2/10/2026 kc no signature due to no one available
2/27/26 CDempsey- Discussing with Kevin on our weekly 1:1 meeting.
2.26.28 hshaw - FSR form missing cust signature
2/11/26 CDempsey- Contacting Kevin about Serviced wo not being Closed.
2/10/2026 kc no signature due to no one available
2/5 KKelch Krista called me back to schedule for 2/9 between 1 and 3 pm, she let me know that they leave at 3, I offered 2/10 between 12 and 2 pm. Customer confirmed.
2/4 KKelch called Krista to schedule for 2/9 between 1 and 3 pm. Left info. Pre scheduled to ensure shipment of parts by SLA
🔧Work Performed
Calibrated Touchscreen and performed pm unit is working properly
🔍Technician Findings
found that the touchscreen needs to be calibrated
⚠️Problem Description
Please have WO Number ready when checking in. Higi is a Blood Pressure Kiosk located in Pharmacy. Do not start work on kiosk until you have parts in your possession. (Technician’s responsibility to check if parts are shipped, correct parts received, no damage.)
Tech must investigate issue before replacing Parts. Parts will be replaced at the discretion of L2.
If unable to resolve with original parts installed, please follow below steps.
Tech will be sent a PC for replacement.
Tech must replace PC kit but do not transfer graphics card from old to new PC. Regardless if PC is installed or not you must contact Level 2 support while onsite to verify errors as well as update portal and ServiceMax for used or unused PC parts
Tech will be shipped replacement Touchscreen nose assembly. Tech will replace all parts shipped, adjust resolution in resolution settings, calibrate, and restore functionality. Touchscreen should be set as main display.
Touchscreen unresponsive
Resolution settings
1440×900 / 60HZ top
800×600 / 60HZ bottom
Tech will be sent Key to Kiosk
Use this password to access the kiosk: LYHXC4W2
If swapping out a PC, you would use: miker0me0g0lfech0
There is a mandatory 4 business day timeline in which to complete this work. If you have questions or require technical support during the service, call 931-284-4999 and follow the prompts to reach the EMSAR Level II Support team for assistance (Support Hours are Monday-Friday from 8:00 AM EST until 8:00 PM EST). Provide the team member with the Work Order number, location, and problem description. At the completion of the service contact the EMSAR Level II Support team so that they can remotely verify that the kiosk is online and operational.
**ALL NON-EMSAR TECHNICIANS: You must check in from the location as soon as you arrive onsite and before you begin working on the kiosk. Call 931-284-4999 and follow the prompts. If there are any questions about the service expectations, use this opportunity to ask the Level II Support team.**
This is a Non Retail location and a scheduled appointment must be made in advance to ensure the machine will be made available prior to tech arrival on site. If a work market technician has to be used SDL must obtain approval from Higi prior to scheduling work. If the technician is unable to make contact on the first attempt, email EMSAR at higisupport@emsar.com so HIGI can be notified to provide us with an alternate contact name and number. Any calls made MUST be logged on the work order under Activity History with who you spoke to and date/time of call.
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist
Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄Description
Higi Green Kiosk Hard wired
📞
Call
Completed Feb 11, 2026
Tech replaced touchscreen successfully. Kiosk working as expected
📋
Inbound from +13096477030
Completed Feb 5, 2026
2/5 KKelch Krista called me back to schedule for 2/9 between 1 and 3 pm, she let me know that they leave at 3, I offered 2/10 between 12 and 2 pm. Customer confirmed.
📋
Outbound to +13096477030
Completed Feb 4, 2026
2/4 KKelch called Krista to schedule for 2/9 between 1 and 3 pm. Left info.
📅
WO-01349454 - Repair - ZT2776-HW - Canton - Illinois River Correctional Center - Aetna
Feb 10, 2026 1:00pm – 2:00pm
Work Order: WO-01349454
Account: HIGI LLC
Customer Case Number:
Location: Illinois River Correctional Center - Aetna
Address: 1300 West Locust St., Canton, IL 61520
Manufacturer: Higi
Model #: ZT2776-HW
Serial #: CSA-2018106212
Contact Name: Krista Hammond
Contact Phone: 309-647-7030 ext 249
Contac