📍 Southampton Memorial Hospital — 100 Fairview Dr, Franklin VA, 23851
Feb 11, 2026 → Feb 11, 2026
✅ Completed
PSMLast business day of February 2026
Target:Feb 27, 2026
🕐 Clock stopped: Completed (Feb 12)
✓ SLA Met (15d early)
Dispatch0.0d
Coordinators0.9d
Billing6.6d
✓ SLA Met
Dispatch
0.0 days
Coordinators
0.9 days
Billing
6.6 days
Over SLA
Created: Feb 11, 2026
Due: Feb 27, 2026
Completed: Feb 12, 2026 (15 days early)
📅
0.9 daysTotal Age
⏱️
10.0d in ClosedLongest Stage
🔄
7 transitionsStatus Changes
⚠️
13.0d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 92 days old
🚨
Primary Delay10.0 days stuck in "Closed"
⏱️
Total Delay13.0 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.6d / 1.0d SLA
Assigned
0.3d / 0.5d SLA
Closed
10.0d / 1.0d SLA
Billing Review
6.0d / 2.0d SLA
Ready to Bill
0.6d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
2.25.26 hshaw - moved WO to BR, TA not populated.
🔧Work Performed
checked all functions of bed to ensure all were functioning properly. I checked electrical with safety analyzer. I placed bed back into service and is ready for use.