📍 Southside Regional Medical Center — 200 Medical Park Blvd, Petersburg VA, 23805
Feb 12, 2026 → Feb 12, 2026
✅ Completed
PSMLast business day of February 2026
Target:Feb 27, 2026
🕐 Clock stopped: Completed (Feb 12)
✓ SLA Met (14d early)
Dispatch0.0d
Coordinators0.4d
Field Work0.0d
Billing1.2d
✓ SLA Met
Dispatch
0.0 days
Coordinators
0.4 days
Field Work
0.0 days
Billing
1.2 days
Created: Feb 12, 2026
Due: Feb 27, 2026
Completed: Feb 12, 2026 (15 days early)
📅
0.4 daysTotal Age
⏱️
9.7d in ClosedLongest Stage
🔄
11 transitionsStatus Changes
⚠️
8.7d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
2 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 91 days old
🚨
Primary Delay9.7 days stuck in "Closed"
⏱️
Total Delay8.7 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.4d / 1.0d SLA
Assigned
0.0d / 0.5d SLA
Completed
0.0d / 1.0d SLA
Closed
9.8d / 1.0d SLA
WO Correction Needed
1.0d
Ready to Bill
0.2d / 1.0d SLA
Billing Review
0.0d / 2.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
2/26/26 MFranks - Work order was created incorrectly. This is a repair not a PM
2.26.26 hshaw - missing PM checklist
🔧Work Performed
track bed on floor /wiped bed down
moved to bed shop
gatch motor replaced
returned bed back to service
🔍Technician Findings
track bed on floor /wiped bed down
moved to bed shop
gatch motor replaced
returned bed back to service
⚠️Problem Description
gatch motor inop
📄Description
Bed, Electric
Feb 25, 2026 9:21pm
@Yves Dessin please note that PM & Repair should be in separate WO for GE Bed service moving forward. WO is missing PM checklist, please attach
Feb 26, 2026 9:19am
@Hannah Shaw WO should not have gone into WO Correction. WO is for a repair and not a PM, so no checklist is needed. Sup fixed WO to reflect Repair WO. cc:@Yves Dessin