Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01351519 ↗ ServiceMax

GE HEALTHCARE • Repair • P5

📍 Ottumwa Regional Health Center INC — 1001 E Pennsylvania Ave, Ottumwa IA, 52501

Feb 13, 2026 → May 18, 2026

✅ Completed
P5
SLA Clock
5 business days from creation · Target: Feb 23, 2026
✗ SLA Missed (4 biz days late)
Active: 9 biz days
Paused: 56 biz days
Budget: 5 biz days
🕐 Clock stopped: Completed (May 18, 2026)
SLA Target
▶ Clock Running
Status: Created
Feb 13 → Feb 13, 2026
0 business days (counted)
Running total: 0 of 5 biz days used
▶ Clock Running
Status: Ready for Scheduling
Feb 13 → Feb 13, 2026
0 business days (counted)
Running total: 0 of 5 biz days used
▶ Clock Running
Status: Assigned
Feb 13 → Feb 16, 2026
0 business days (counted)
Running total: 0 of 5 biz days used
⏸56d
⏸ Clock Paused
Status: Awaiting Parts
Feb 16 → May 5, 2026
56 business days (not counted)
9d
▶ Clock Running
Status: Reschedule
May 5 → May 18, 2026
9 business days (counted)
Running total: 9 of 5 biz days used
▶ Clock Running
Status: Tech On Site
May 18 → May 18, 2026
0 business days (counted)
Running total: 9 of 5 biz days used
Created: Feb 13, 2026 Completed: May 18, 2026
Business Days Used 9 / 5
0 5d budget +4d over
Show SLA Clock Detail (6 periods)
Period Status Clock Biz Days Running Total
Feb 13 → Feb 13 Created ▶ Running 0 0 / 5
Feb 13 → Feb 13 Ready for Scheduling ▶ Running 0 0 / 5
Feb 13 → Feb 16 Assigned ▶ Running 0 0 / 5
Feb 16 → May 5 Awaiting Parts ⏸ Paused 56
May 5 → May 18 Reschedule ▶ Running 9 9 / 5
May 18 → May 18 Tech On Site ▶ Running 0 9 / 5
Dispatch 0.0d
Material Management 56.0d
Coordinators 11.0d
Field Work 0.3d
Billing 0.1d
✗ SLA Missed
Dispatch
0.0 days
Material Management
56.0 days
Over SLA
Coordinators
11.0 days
Over SLA
Field Work
0.3 days
Billing
0.1 days
Created: Feb 13, 2026 Due: Feb 20, 2026 Completed: May 19, 2026 (87 days late)
📅
66.1 days Total Age
⏱️
56.0d in Awaiting Parts Longest Stage
🔄
8 transitions Status Changes
⚠️
62.5d over Total Delay
📦
1 orders, 0 quotes Parts & Quotes
📝
8 lines Work Details
🚩
4 visits On-Site Trips
👤
Self-Scheduled Scheduling
🚩
4 On-Site Visits (1 reschedule)
4 on-site visits — why were multiple trips needed?
👤 Self-scheduled by Mark Stelter — scheduling delays attributed to technician, not coordinators
Visit 1 Feb 12, 2026
Visit 2 Feb 16, 2026
Visit 3 Mar 2, 2026
Visit 4 May 18, 2026

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 181 days old
🚨
Primary Delay 56.0 days stuck in "Awaiting Parts"
⏱️
Total Delay 62.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.0d / 1.0d SLA
Assigned
1.0d / 0.5d SLA
Awaiting Parts
56.0d / 3.0d SLA
Reschedule
10.0d / 2.0d SLA
Tech On Site
0.3d / 1.0d SLA
Closed
2.1d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
'2605182_MStelter: 1) Replaced Foot Jack, tested, adjusted, returned to service. '26.03.02_MStelter: 1) Inquired about the lead time of the jacks (6-8 wks) 2) Went to move the cot out of my active work zone and noticed puddle of oil under foot jack. '26.02.16_MStelter: 1) the foot only dropped by 1/2" over the weekend with 75 lbs of weight on it. 2) completely disconnected the rod that controls the descent to make sure that it wasn't allowing leakage. Lowered H & F and pumped again. Head still rises faster than foot. 3) Ordered a jack for the foot end. '26.02.12_MStelter: 1) Measured head and foot fully raised (2" differenece). Referenced other cots to verify that this variation is not normal. (It isn't ... head and foot are usually within 1/2" of each other when fully raised.) 2) Put 75 lbs of weight above head cylinder and 75 lbs of weight above foot cylinder. Will see if foot end drifts over time.
🔍 Technician Findings
'26.02.12_MStelter: Cot does not raise evenly and foot end does not go up as high as the head end.
⚠️ Problem Description
Mark Stelter: Request REPAIR WO. Foot does not rise as fast as head. When both head and foot are fully raised, foot is 2" lower than head.
📄 Description
Stryker 1115 Big Wheel Prime Series Stretcher

Timeline

📋
2 Work Order Created Feb 13, 8:14 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Kimberly Hardison
From: Entered
To: Ready for Scheduling
Duration in Previous: 1m
👷
2 Technician Assigned Feb 13, 8:27 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Laura Hill
From: Ready for Scheduling
To: Assigned
Duration in Previous: 11m
⏱️
Labor Added Feb 13, 11:40 AM
Type: Labor
Status: Open
Qty: 0.5
1.0 business days
⏱️
3 3x Labor Added Feb 16, 10:47 AM
3x Labor Added → Parts Requested → Status: Awaiting Parts
📦
Parts Requested
Order: 00090426
Status: Closed
📦
Status: Awaiting Parts by Mark Stelter
From: Assigned
To: Awaiting Parts
Duration in Previous: 3d 2h
🚨 10.0 business days
⏱️
Labor Added Mar 2, 11:22 AM
Type: Labor
Status: Open
Qty: 0.5
🚨 47.0 business days
🔩
2 2x Parts Added May 5, 12:20 PM
2x Parts Added → Status: Reschedule
🔄
Status: Reschedule by Audrey Tharp
From: Awaiting Parts
To: Reschedule
Duration in Previous: 78d 0h
🚨 10.0 business days
🔧
Status: Tech On Site by Mark Stelter May 18, 5:05 PM
From: Reschedule
To: Tech On Site
Duration in Previous: 13d 4h
⏱️
2 Labor Added May 18, 7:25 PM
Labor Added → Status: Completed
✔️
Status: Completed by Mark Stelter
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 2h 21m, 0m
2.6 business days
📄
Status: Ready to Bill by Hannah Shaw May 20, 5:30 PM
From: Closed
To: Ready to Bill
Duration in Previous: 1d 22h
📨
Status: Invoice Pending by Hannah Shaw May 20, 6:03 PM
From: Ready to Bill, Invoice Pending
To: Invoice Pending, Invoiced
Duration in Previous: 32m, 0m
2.7 business days
🧾
Invoice Created May 22, 12:11 PM
Invoice Number: SM-262515

Bottlenecks

Assigned
Duration: 1.0 business days (threshold: 4.0 business hours)
Exceeded by 4.0 business hours
Awaiting Parts
Duration: 56.0 business days (threshold: 3.0 business days)
Exceeded by 53.0 business days
Reschedule
Duration: 10.0 business days (threshold: 2.0 business days)
Exceeded by 8.0 business days
Closed
Duration: 2.1 business days (threshold: 1.0 business days)
Exceeded by 1.1 business days

🔗 Related Artifacts

📦
Parts Order 00090426
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
P5
Type
Repair
Branch
N/A
Technician
Mark Stelter
Scheduled
N/A
Created
Feb 13, 8:14 AM
Invoice #
SM-262515

Work Details (8)

Name Type Status Qty Amount Date
WL-03104862 Labor Open 0.5 $0.00 Feb 13, 11:40 AM
WL-03106956 Labor Open 1 $0.00 Feb 16, 10:47 AM
WL-03106957 Labor Open 0.5 $0.00 Feb 16, 10:47 AM
WL-03106958 Travel Open 92 $0.00 Feb 16, 10:47 AM
WL-03125997 Labor Open 0.5 $0.00 Mar 2, 11:22 AM
WL-03214720 Parts Open 1 $0.00 May 5, 12:20 PM
WL-03214721 Expenses Open 1 $0.00 May 5, 12:20 PM
WL-03230709 Labor Open 3 $0.00 May 18, 7:25 PM

Details