📍 Ottumwa Regional Health Center INC — 1001 E Pennsylvania Ave, Ottumwa IA, 52501
Feb 18, 2026 → Apr 3, 2026
✅ Completed
P55 business days from creation
Target:Feb 25, 2026
🕐 Clock stopped: Completed (Apr 3)
⏸ 41d excluded (parts wait + holding)
✗ SLA Missed
Dispatch0.0d
Material Management30.1d
Coordinators3.0d
Field Work0.1d
Billing1.6d
✗ SLA Missed
Dispatch
0.0 days
Material Management
30.1 days
Over SLA
Coordinators
3.0 days
Over SLA
Field Work
0.1 days
Billing
1.6 days
Over SLA
Created: Feb 18, 2026
Due: Feb 25, 2026
Completed: Apr 3, 2026 (36 days late)
📅
32.5 daysTotal Age
⏱️
30.1d in Awaiting PartsLongest Stage
🔄
10 transitionsStatus Changes
⚠️
31.9d overTotal Delay
📦
2 orders, 0 quotesParts & Quotes
📝
10 linesWork Details
🏠
2 visitsOn-Site Trips
👤
Self-ScheduledScheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Mark Stelter — scheduling delays attributed to technician, not coordinators
Visit 1Feb 18, 2026
Visit 2Apr 3, 2026
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 85 days old
🚨
Primary Delay30.1 days stuck in "Awaiting Parts"
⏱️
Total Delay31.9 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.1d / 1.0d SLA
Assigned
2.9d / 0.5d SLA
Awaiting Parts
30.1d / 3.0d SLA
Tech On Site
0.1d / 1.0d SLA
Closed
3.0d / 1.0d SLA
Ready to Bill
1.6d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
'260403_MStelter
1) rec'd in 2 shipments of parts
2) installed strain reliefs for both power cords and reinforced cords with zip ties
3) installed wall roller bumpers
4) installed lock nut on wheel Left Foot wheel axle.
5) installed cam card
6) verified proper function of auto-contour and other related functions
7) cleaned asset (grease, dust, other)
8) filed reliefs in belly pan where it interfered with nuts to improve performance
9) reinstalled shields and belly pan. Verify proper function of belly pan safety entrapment switches at all 4 corners.
10) returned to service
'260218_MStelter:
1) diagnosed auto contouring problem. Turns out the microswitch was wired wrong. The wires should be to 1 and 3, not adjacent.
2) ordered parts
🔍Technician Findings
'260218_MStelter:
Multiple issues with this bed. See Prob Desc.
⚠️Problem Description
Request REPAIR WO. Bed power cord was unplugged. Needs strain reliefs replaced on both power cords. Auto-contour doesn't work. Is missing 2 wall rollers due to axles failing. Also needs caster covers. One wheel is missing a nut.
Stelter, Mark
📄Description
Bed, Electric
Timeline
📋
▶
4
Work Order Created Feb 18, 3:21 PM
Work Order Created → Status: Ready for Scheduling → Status: Assigned → Technician Assigned
📅
Status: Ready for Scheduling by Sherry Reich
From:Entered
To:Ready for Scheduling
Duration in Previous:0m
👷
Status: Assigned by Charles Ramen
From:Ready for Scheduling
To:Assigned
Duration in Previous:3m
👷
Technician Assigned by Charles Ramen
Technician:Mark Stelter
⏱️
Labor Added Feb 18, 5:27 PM
Type:Labor
Status:Open
Qty:3
📦
▶
2
Parts Requested Feb 18, 5:48 PM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Mark Stelter
From:Assigned
To:Awaiting Parts
Duration in Previous:2h 22m
🚨20.8 business days
📦
Parts Requested Mar 18, 9:41 AM
Order:00092716
Status:Closed
⚠️8.0 business days
🔩
2x Parts Added Mar 27, 1:26 PM
Type:Parts, Expenses
Status:Open
Qty:4, 1
⏳4.0 business days
📅
Status: Ready for Scheduling by Audrey TharpApr 1, 2:40 PM
From:Awaiting Parts
To:Ready for Scheduling
Duration in Previous:41d 19h
🆕
▶
2
Status: Entered Apr 1, 3:07 PM
Status: Entered → Technician Assigned
👷
Technician Assigned by Charles Ramen
Technician:Mark Stelter
🔩
4x Parts Added Apr 1, 3:33 PM
Type:Parts, Expenses
Status:Open
Qty:2, 1
⏳3.0 business days
⏱️
2x Labor Added Apr 3, 10:45 AM
Type:Labor, Travel
Status:Open
Qty:1, 92
🔧
Status: Tech On Site by Mark StelterApr 3, 10:51 AM
From:Assigned
To:Tech On Site
Duration in Previous:1d 19h
⏱️
▶
2
Labor Added Apr 3, 11:39 AM
Labor Added → Status: Completed
✔️
Status: Completed by Mark Stelter
From:Tech On Site, Completed
To:Completed, Closed
Duration in Previous:49m, 0m
⏳3.0 business days
📄
Status: Ready to Bill by Hannah ShawApr 7, 3:10 PM
From:Closed
To:Ready to Bill
Duration in Previous:4d 3h
📨
▶
3
Status: Invoice Pending Apr 8, 2:58 PM
Status: Invoice Pending → Invoice Created → Status: Invoiced
🧾
Invoice Created
Invoice Number:SM-258736
💰
Status: Invoiced by Hannah Shaw
From:Invoice Pending
To:Invoiced
Duration in Previous:3m
Bottlenecks
Awaiting Parts
Duration: 30.1 business days (threshold: 3.0 business days)
Exceeded by 27.1 business days
Assigned
Duration: 2.6 business days (threshold: 4.0 business hours)
Exceeded by 2.1 business days
Closed
Duration: 3.0 business days (threshold: 1.0 business days)
Exceeded by 2.0 business days
Ready to Bill
Duration: 1.6 business days (threshold: 1.0 business days)