Created: Feb 18, 2026
Due: Apr 30, 2026
Completed: Feb 23, 2026 (66 days early)
📅
3.3 daysTotal Age
⏱️
38.6d in Billing ReviewLongest Stage
🔄
9 transitionsStatus Changes
⚠️
48.4d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
8 linesWork Details
🏠
2 visitsOn-Site Trips
📋
CoordinatorScheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
Visit 1Feb 18, 2026
Visit 2Feb 19, 2026
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 85 days old
🚨
Primary Delay38.6 days stuck in "Billing Review"
⏱️
Total Delay48.4 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
2.3d / 0.5d SLA
Completed
1.0d / 1.0d SLA
Closed
11.7d / 1.0d SLA
WO Correction Needed
0.1d
Billing Review
38.6d / 2.0d SLA
Ready to Bill
1.3d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
3/9/26 Ycampos - Fady and Chris - Tech has 2 site visits, can we bill for both days? Or just 1 flat rate? no notes from tech in Work performed or internal CSA explaining why there are two site visits.
2/26/26 DPatton -2 labor lines (Upgrade) - please update or remove the additional upgrade labor. (is it Down Time?) Please correct when you get a chance.. thank you!
🔧Work Performed
Installed/upgraded nosecone.
🔍Technician Findings
Nosecone upgrade needed.
⚠️Problem Description
GCX Advent 5G Nosecone Upgrade
📄Description
Jaco EVO Series Medical Carts
Mar 9, 2026 2:58pm
@Fady Messak @Chris Bakkemo Fady and Chris - Tech has 2 site visits, can we bill for both days? Or just 1 flat rate? no notes from tech in Work performed or internal CSA explaining why there are two site visits.