Total Delay112.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
59.9d / 0.5d SLA
Scheduled
29.0d / 2.0d SLA
Reschedule
25.0d / 2.0d SLA
Tech On Site
2.4d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
4.4d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
11/14 Having 2 system no communicate is unpractical and some times is confusing what has been done or dont. Tablet, Laptop, cell phone and deliver service. Cant closebecause need to add parts to match mservice. MD
Please assign to Maria Davis ARP to site is 230 miles. Zone 5
🔧Work Performed
11/14/2025 GCMCS PM was completed per Agilent. MS was tuned and vented. Ion source was cleaned, mechanical pump was found leaking and d a repair SO 6008214667 was created. GC parts and gas filters were replaced. System was pumped down and stabilized for sometime. No air leak, N2 and H2O were above the limit. New pump will be replaced after delivery.
⚠️Problem Description
28R
SYS-GM-5977T
Contract ends 03/28/2026 repair included
PM
G4513AR
CN15200095 Agilent Cert. Pre-owned 7693A Injector
G7081C
US2234RA35 5977C Std Turbo EI Mainframe
G2790A
US2302C003 Agilent 8860 GC System Custom
📄Description
Gas Chromatograph/Mass Spectrometer (for contract purposes only)