38R
SYS-LC-1290-E
Contract ends 03/31/2026 includes Repair
PMPLUS
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G4226A
DEBAP02189 1290 Infinity Autosampler
G4227A
DEBAJ00203 1290 Infinity Flexible Cube
G1330B
DEBAK06810 1290 Thermostat
G4220A
DEBAA01817 1290 Infinity Binary Pump
G1316C
DEBAC03023 1290 Thermostatted Column Compartment
G4212A
DEBAF01422 1290 Infinity Diode-Array Detector
G1362A
DEAA603172 1260 Refractive Index Detector
Total Delay159.8 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
34.5d / 0.5d SLA
Scheduled
15.0d / 2.0d SLA
Reschedule
114.8d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
5/11/26 lcoonrod
Found notes from Maria that she overlooked returning it.
04/15 Called few times and never got a response, Overlooked to return it. MD
11/25/25 RBerry- Sent teams message to DCarvalho advising this WO is not scheduled yet and due in Nov.
Please assign to Maria Davis ARP to site is 42 miles. Zone 1
⚠️Problem Description
38R
SYS-LC-1290-E
Contract ends 03/31/2026 includes Repair
PMPLUS
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G4226A
DEBAP02189 1290 Infinity Autosampler
G4227A
DEBAJ00203 1290 Infinity Flexible Cube
G1330B
DEBAK06810 1290 Thermostat
G4220A
DEBAA01817 1290 Infinity Binary Pump
G1316C
DEBAC03023 1290 Thermostatted Column Compartment
G4212A
DEBAF01422 1290 Infinity Diode-Array Detector
G1362A
DEAA603172 1260 Refractive Index Detector
📄Description
Agilent 1290 Infinity II - LC (Liquid chromatography)
📞Call Description
NOV 2025 LC PMPLUS
Apr 15, 2026 3:04pm
@David Carvalho @Maria Davis Jeanette just sent a list of past due SOs. This one is on the list. Please advise if there is something holding this one up. I do not see notes in the WO. Thank you!! @Rhea Berry
Timeline
📞
▶
4
Case Linked Sep 12, 3:55 PM
Case Linked → Work Order Created → Status: Ready for Scheduling → Technician Assigned
📋
Work Order Created
Work Order:WO-01304213
Type:Preventive Maintenance
Priority:PC
📅
Status: Ready for Scheduling by Leona Coonrod
From:Entered, Ready for Scheduling
To:Ready for Scheduling, Assigned
Duration in Previous:0m
👷
Technician Assigned by Leona Coonrod
Technician:Maria Davis
🚨35.0 business days
🗓️
▶
2
Status: Scheduled Nov 2, 2:02 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Maria Davis
Scheduled For:2025-11-24T16:00:00.000+0000
🚨15.0 business days
🔄
Status: Reschedule by Maria DavisNov 24, 12:53 PM
From:Scheduled
To:Reschedule
Duration in Previous:21d 22h
🚨115.0 business days
🆕
Status: Entered by Leona CoonrodMay 11, 4:39 PM
From:Reschedule, Entered
To:Entered, Canceled
Duration in Previous:168d 2h, 0m
Bottlenecks
Assigned
Duration: 34.5 business days (threshold: 4.0 business hours)
Exceeded by 34.0 business days
Scheduled
Duration: 15.0 business days (threshold: 2.0 business days)
Exceeded by 13.0 business days
Reschedule
Duration: 114.8 business days (threshold: 2.0 business days)