2-25 Mburris email from POC Amanda to set 3-3 with an arrival window between 11am and 1pm
2-25 Mburris email sent to POC
2-25 Mburris LM on Vmail for POC
1-30 Mburris called site LM on Vmail
11/17/25 RCook- Emailed Dylan Nakoff to confirm what due date should be. Due date in EBT is 12/4/25 but the initial inspection was 2/20/25
🔧Work Performed
INSPECTED OR CALIBRATED OR BOTH 50 PIECES OF EQUIPMENT PER MANUFACTURES SPECIFICATIONS
🔍Technician Findings
Annual Equipment Electrical Safety Test And Calibration Service
Equipment: 46
https://www.ebiotrack.com/inspection.php?iid=30522
This customer requires a quote on all repairs.
⚠️Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
Equipment: 46
https://www.ebiotrack.com/inspection.php?iid=30522
This customer requires a quote on all repairs.
📧
Email:Re: EMSAR Request for service at Idaho Correctional Institution-Orofino
Completed Feb 25, 2026
From: ashriver@TeamCenturion.com
To: michael.burris@emsar.com
Michael,
March 3rd will work for us.
See you then
Thank you
Amanda Shriver, RN BSN
Health Services Administrator
Idaho Correctional Institution Orofino
Healthcare beyond patient care,
healthcare for humanity.
381 West Hospital Drive
Orofino, ID 83530
Direct: 208-476-3655 EXT 2340
Mobile: 208-540-0381
Fax: 208-567-2507
ashriver@teamcenturion.com | CenturionManagedCare.com
________________________________
📧
Email: EMSAR Request for service at Idaho Correctional Institution-Orofino
Completed Feb 25, 2026
To: ashriver@teamcenturion.com
CC:
BCC: michael.burris@emsar.com
Attachment: --none--
Subject: EMSAR Request for service at Idaho Correctional Institution-Orofino
Body:
Hi Amanda Shriver,
I hope you’re doing well. It’s time for your annual inspection of the biomed equipment at Idaho Correctional Institution-Orofino. We’d like to schedule the inspection to ensure everything is in compliance and functioning properly.
We currently have availability on 3-3 with an arrival window between 1