EHS Installation
EHS Installation EHS Installation Inventory Inspection Service DeNovo White Glove Service Includes • Inventory • Asset tagging • Entry of equipment into EHS/EBT • Have clinic staff scan some of the tags so that they are familiar with the process • Have clinic staff agree that all equipment has been tagged prior to tech leaving the site • Equipment unpacking, uncrating and disposal of packaging equipment • Equipment assembly • Equipment staging with assistance from site • Operational Testing (verification that the equipment operates as intended) • Leave 10 to 12 Asset Tags at the site. This is for any future new equipment. The site will add the tag and scan it to initiate a call with our Virtual Tech team so that they can load the new equipment into EBT.
Build request- 1/5/26 Tag request- 1/6/26
https://www.ebiotrack.com/inspection.php?iid=31016
1/12/26 ADiaz - all information requested in work order correction was already in https://www.ebiotrack.com/inspection.php?iid=31016
. I do not know why there were 2 EBT WOs issued for this work order.
1/12/26 CDempsey- notified tech of correction needed.
12/2 - Customer requesting reschedule - MJA
IAHD- 8845 W. Loop South, Suite A, Houston, TX 77096
Build- Monday 1/5/26 requesting change to Wednesday 1/7
Tag – Tuesday 1/6/26 requesting change to Thursday 1/8
🔧Work Performed
- Unboxed and assembled all equipment (50 pieces) as instructed by onsite project manager Theresa. - Asset tagged specified equipment into inventory as instructed by Theresa. - Performed operational/functionality check and electrical safety on equipment where applicable - Performed final walk through with Theresa to ensure all duties were completed before leaving.
🔍Technician Findings
New site
⚠️Problem Description
EHS Installation
EHS Installation EHS Installation Inventory Inspection Service DeNovo White Glove Service Includes • Inventory • Asset tagging • Entry of equipment into EHS/EBT • Have clinic staff scan some of the tags so that they are familiar with the process • Have clinic staff agree that all equipment has been tagged prior to tech leaving the site • Equipment unpacking, uncrating and disposal of packaging equipment • Equipment assembly • Equipment staging with assistance from site • Operational Testing (verification that the equipment operates as intended) • Leave 10 to 12 Asset Tags at the site. This is for any future new equipment. The site will add the tag and scan it to initiate a call with our Virtual Tech team so that they can load the new equipment into EBT.
Build request- 1/7/26 Tag request- 1/8/26
https://www.ebiotrack.com/inspection.php?iid=31016 https://www.ebiotrack.com/workorder.php?wo=69468
Dec 2, 2025 12:38pm
@Kaitlyn Kelch - Hello - Customer reached out requesting reschedule. See Internal CSA notes - MJA
Work Order: WO-01313016
Account: Chewy
Customer Case Number:
Location: Chewy - CVC Meyerland IAHD
Address: 8845 W. Loop South, Suite A, Houston, TX 77096
Manufacturer:
Model #:
Serial #:
Contact Name: Hassan Ali
Contact Phone: 786-412-8557
Contact Email: hali2@chewy.com
Due Date: 1/8/2026
Schedu