Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01313726 ↗ ServiceMax

Modern Animal Hospital • Preventive Maintenance • PSM

📍 MODERN ANIMAL WCRK — 1360 MT DIABLO BLVD, WALNUT CREEK CA, 94596-5101

Nov 7, 2025 → Aug 3, 2026

🔴 Behind
PSM
SLA Clock
Last business day of November 2025 · Target: Nov 28, 2025
✗ SLA Missed (30 biz days late)
Active: 43 biz days
Paused: 139 biz days
🕐 Clock stopped: Completed (Aug 4, 2026)
▶ Clock Running
Status: Created
Nov 7 → Nov 7, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: L2 Screening
Nov 7 → Nov 14, 2025
4 business days (counted)
Running total: 4 of ? biz days used
⏸18d
⏸ Clock Paused
Status: Awaiting Parts
Nov 14 → Dec 12, 2025
18 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Dec 12 → Dec 12, 2025
0 business days (counted)
Running total: 4 of ? biz days used
▶ Clock Running
Status: Assigned
Dec 12 → Dec 31, 2025
12 business days (counted)
Running total: 16 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 31 → Jan 2, 2026
1 business day (counted)
Running total: 17 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Jan 2 → Jan 5, 2026
1 business day (not counted)
⏸ Clock Paused
Status: Awaiting Parts
Jan 5 → Jan 6, 2026
1 business day (not counted)
▶ Clock Running
Status: Reschedule
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 18 of ? biz days used
⏸118d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Jun 26, 2026
118 business days (not counted)
▶ Clock Running
Status: L2 Screening
Jun 26 → Jun 29, 2026
1 business day (counted)
Running total: 19 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jun 29 → Jun 29, 2026
0 business days (counted)
Running total: 19 of ? biz days used
▶ Clock Running
Status: L2 Screening
Jun 29 → Jun 29, 2026
0 business days (counted)
Running total: 19 of ? biz days used
⏸ Clock Paused
Status: Awaiting Parts
Jun 29 → Jun 30, 2026
1 business day (not counted)
▶ Clock Running
Status: Ready for Scheduling
Jun 30 → Jul 2, 2026
2 business days (counted)
Running total: 21 of ? biz days used
▶ Clock Running
Status: Scheduled
Jul 2 → Jul 9, 2026
4 business days (counted)
Running total: 25 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jul 9 → Jul 10, 2026
1 business day (counted)
Running total: 26 of ? biz days used
⏸ Clock Paused
Status: Awaiting Parts
Jul 10 → Jul 10, 2026
0 business days (not counted)
▶ Clock Running
Status: Reschedule
Jul 10 → Jul 29, 2026
13 business days (counted)
Running total: 39 of ? biz days used
▶ Clock Running
Status: Scheduled
Jul 29 → Aug 3, 2026
3 business days (counted)
Running total: 42 of ? biz days used
▶ Clock Running
Status: Tech On Site
Aug 3 → Aug 4, 2026
1 business day (counted)
Running total: 43 of ? biz days used
Created: Nov 7, 2025 Completed: Aug 4, 2026
Show SLA Clock Detail (21 periods)
Period Status Clock Biz Days Running Total
Nov 7 → Nov 7 Created ▶ Running 0 0
Nov 7 → Nov 14 L2 Screening ▶ Running 4 4
Nov 14 → Dec 12 Awaiting Parts ⏸ Paused 18
Dec 12 → Dec 12 Ready for Scheduling ▶ Running 0 4
Dec 12 → Dec 31 Assigned ▶ Running 12 16
Dec 31 → Jan 2 Ready for Scheduling ▶ Running 1 17
Jan 2 → Jan 5 Ready for Release ⏸ Paused 1
Jan 5 → Jan 6 Awaiting Parts ⏸ Paused 1
Jan 6 → Jan 7 Reschedule ▶ Running 1 18
Jan 7 → Jun 26 Ready for Release ⏸ Paused 118
Jun 26 → Jun 29 L2 Screening ▶ Running 1 19
Jun 29 → Jun 29 Ready for Scheduling ▶ Running 0 19
Jun 29 → Jun 29 L2 Screening ▶ Running 0 19
Jun 29 → Jun 30 Awaiting Parts ⏸ Paused 1
Jun 30 → Jul 2 Ready for Scheduling ▶ Running 2 21
Jul 2 → Jul 9 Scheduled ▶ Running 4 25
Jul 9 → Jul 10 Tech On Site ▶ Running 1 26
Jul 10 → Jul 10 Awaiting Parts ⏸ Paused 0
Jul 10 → Jul 29 Reschedule ▶ Running 13 39
Jul 29 → Aug 3 Scheduled ▶ Running 3 42
Aug 3 → Aug 4 Tech On Site ▶ Running 1 43
Dispatch 6.1d
Material Management 22.3d
Holding 121.0d (excluded)
Coordinators 42.3d
Field Work 1.9d
✗ SLA Missed
Dispatch
6.1 days
Over SLA
Material Management
22.3 days
Over SLA
Holding (excluded from total)
121.0 days
Coordinators
42.3 days
Over SLA
Field Work
1.9 days
Created: Nov 7, 2025 Due: Jul 31, 2026 (16 days overdue)
📅
182.0 days Total Age
⏱️
119.0d in Ready for Release Longest Stage
🔄
23 transitions Status Changes
⚠️
56.2d over Total Delay
📦
5 orders, 0 quotes Parts & Quotes
📝
27 lines Work Details
🚩
3 visits On-Site Trips
👤
Self-Scheduled Scheduling
🚩
3 On-Site Visits (2 reschedules)
3 on-site visits — why were multiple trips needed?
👤 Self-scheduled by Angel Rios — scheduling delays attributed to technician, not coordinators
Visit 1 Jul 9, 2026
Visit 2 Jul 20, 2026
Visit 3 Aug 3, 2026

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00541962
eBiotrack - Automated New Inspection Created
Closed
Semi-Annual Preventative Maintenance Service - Anesthesia,Anesthesia Machine,Autoclave,Dental Delivery Unit,Dental Unit,Microscope Equipment: 8 https://www.ebiotrack.com/inspection.php?iid=31096 This customer is VT/Full-Service. All parts orders and warranty inquires need to be handled by EMSAR.
Priority
Standard
Origin
Email
Reason
New Case
Contact
Raina Jung
Owner
Shelby Robinson
Created
Nov 7, 2025
Work Orders from this Case (1)
WO-01313726 (current) Ready to Bill
Preventive Maintenance • Angel Rios
Created: Nov 7, 2025 • Closed: Aug 3, 2026
Behind Schedule - Needs Attention
Ready to Bill • 281 days old
🚨
Primary Delay 119.0 days stuck in "Ready for Release"
⏱️
Total Delay 56.2 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
L2 Screening
6.1d / 1.0d SLA
Awaiting Parts
22.3d / 3.0d SLA
Ready for Scheduling
6.3d / 1.0d SLA
Assigned
12.6d / 0.5d SLA
Ready for Release
121.0d
Reschedule
15.4d / 2.0d SLA
Scheduled
8.1d / 2.0d SLA
Tech On Site
1.7d / 1.0d SLA
Completed
0.2d / 1.0d SLA
Closed
8.0d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

7-29 Mburris spoke with Raina Jung and set for 8-3 10am

7-29 Mburris sent chatter to Account manager if any update on these 2 WO'S WO-01316681

7/20 ARios - Travel time for PM service completed on today (7/20) is on WO-01391569.

7-2 Mburris email sent to POC Raina to set appt looking for 7-9 with an arrival window between 10am and 11:30am for both WO-01313726 and WO-01316681


7-2 Mburris called Lm on Vmail for Raina to set appt 7-9 10am


6/29/26 RBerry- Per chatter: @Joseph Whalen​ I put this into L2 screening because a new Landmark PM kit needs to be ordered. Is this the correct way to send it back to L2 to get reordered? cc: @Rhea Berry@Megan Allen​ 


6/26/26 RBerry- Called site to confirm if they have the LANDMARK PM KIT. No answer. 


6/19/26 RBerry- Per technician he does not have the LANDMARK PM KIT. He has other PMs kits. Will need to reach out to site to determine if kit possibly shipped to site. If not, new parts will need to be ordered.


6/16/26 RBerry- Spoke with tech, states he needs to confirm he still has the PM parts. Will send me a text this evening to confirm so I can reach out to schedule.


01/07/2026 SRobinson-

Order No: 746743


Customer PO No: PO015722


Customer: EMSAR Inc


Ship To Name: EMSAR Inc


Ship To Address: 270 Davids Dr    


Ship To City/State: Wilmington, OH 45177-2491


Waybill (Tracking #): 1ZE444250370295880


Carrier: UPS-Parcel-Ground


The following items have shipped from Midmark Corporation on: 07-JAN-2026


LINE NO: 1.1 QTY: 60 ITEM: 002-10070-00 SERIAL #: DESCRIPTION: PM KIT FOR M11


Part of Modern Animal Project. ASC does not need to work this WO. Rhea Berry is working project WOs.


1/5/26 RBerry- Placing WO back into awaiting parts manually. PO00085359 is still in submitted status.


12/18/2025jsells

Ship To Name: EMSAR Inc Ship To Address: 270 Davids Dr Ship To City/State: Wilmington, OH 45177-2491 Waybill (Tracking #): 00032677329 Carrier: Dayton Freight-Truck-Standard The following items have shipped from Midmark Corporation on: 18-DEC-2025 LINE NO: 3.1 QTY: 75 ITEM: 91303015 SERIAL #: DESCRIPTION: MAINTENANCE KIT- VMS, VMS PLUS, VMC


12/09/2025 SRobinson- Order No: 740487


Customer PO No: PO015250


Customer: EMSAR Inc


Ship To Name: EMSAR Inc


Ship To Address: 270 Davids Dr   


Ship To City/State: Wilmington, OH 45177-2491


Waybill (Tracking #): 00032676971


Carrier: Dayton Freight-Truck-Standard


The following items have shipped from Midmark Corporation on: 08-DEC-2025


LINE NO: 1.1 QTY: 1 ITEM: 002-0784-00 SERIAL #: DESCRIPTION: M11/M11D RETURN SHIPPING PACK


LINE NO: 2.1 QTY: 50 ITEM: 002-10070-00 SERIAL #: DESCRIPTION: PM KIT FOR M11

🔧 Work Performed
7/09 Midmark Anesthesia Machine 91800081 SN: V2586207 Asset ID:12977747 Performed preventive maintenance on the anesthesia unit by replacing all components included in the maintenance kit, including O-rings, hoses, diaphragm, absorbent cartridge, and other applicable parts. Performed a pressure leak test, which passed. Turned off the flowmeter after the pressure reached 30 cm H₂O, and the pressure held without any noticeable drop. Preventive maintenance was completed on this anesthesia unit. Midmark M11-043 Autoclave SN: V2570852 Asset ID: 12977741 Performed preventive maintenance on the autoclave per the manufacturer's instructions. Cleaned the chamber, distilled water reservoir, and accessories using Speed-Clean. Replaced the door gasket, door springs, and chamber mesh filters included in the preventive maintenance kit. Ran a sterilization cycle, and the unit completed the cycle without any errors or water leaks. Preventive maintenance was completed on the autoclave. Vetland Landmark Anesthesia Machine SN: 86310 Asset ID: 13215360 Performed preventive maintenance on the anesthesia machine, which included replacing the gaskets and tubing. Performed a pressure leak test, which passed. The unit maintained pressure at 30 cm H₂O after the flowmeter was turned off. Preventive maintenance was completed on the anesthesia machine. Vetland Landmark Anesthesia Machine SN: 85901 Asset ID: 13215358 Performed preventive maintenance on the anesthesia machine, which included replacing the gaskets and tubing. Performed a pressure leak test, which passed. The unit maintained pressure at 30 cm H₂O after the flowmeter was turned off. Preventive maintenance was completed on the anesthesia machine. Note: Head Nurse Julissa requested that I hold off on performing preventive maintenance on their second Midmark anesthesia machine until it is repaired. She advised that they recently submitted a service request for the required parts and repair. 7/20 Midmark Anesthesia Machine 91800081 SN: V2527150 Asset ID:12977769 Performed preventive maintenance on the anesthesia unit by replacing all components included in the maintenance kit, including O-rings, hoses, diaphragm, absorbent cartridge, and other applicable parts. Performed a pressure leak test, which passed. Turned off the flowmeter after the pressure reached 30 cm H₂O, and the pressure held without any noticeable drop. Preventive maintenance was completed on this anesthesia unit. 8/03 Dentalaire Dental unit SN: A14548 Asset ID: 13028075 Performed preventive maintenance on the dental unit compressor in accordance with the manufacturer's PM service instructions (C00PM). Adjusted the compressor, high-speed handpiece, and polisher air pressures to the manufacturer's recommended PSI specifications. Tested all handpieces and verified they were operating properly. No air or water leaks were found. Unit is operating properly. Dentalaire Dental unit SN: A14549 Asset ID: 13128458 Performed preventive maintenance on the dental unit compressor in accordance with the manufacturer's PM service instructions (C00PM). Adjusted the compressor, high-speed handpiece, and polisher air pressures to the manufacturer's recommended PSI specifications. Tested all handpieces and verified they were operating properly. No air or water leaks were found. Unit is operating properly. UNICO Microscope SN: G38L 20221597 Asset ID: 12977691 Performed preventive maintenance on the microscope. No issues were observed during the evaluation. Microscope is operating properly.
🔍 Technician Findings
7/09 Arrived on site to perform preventive maintenance on four anesthesia machines, one autoclave, two dental delivery units, and one microscope. The preventive maintenance kits for the autoclave and anesthesia machines were brought by me, as they had been shipped to my trunk stock. 7/20 Arrived on site to perform the repair associated with WO-01391569 and complete the preventive maintenance service on the anesthesia unit under this work order. 8/03 Arrived on site to perform preventive maintenance on two Dentalaire units and one microscope.
⚠️ Problem Description
Semi-Annual Preventative Maintenance Service - Anesthesia,Anesthesia Machine,Autoclave,Dental Delivery Unit,Dental Unit,Microscope Preventative Maintenance on all Anesthesia Machines, Autoclaves, Dental Units, and Microscopes to be completed. - Cleaning and Disinfection - Ensuring safe physical working condition - Functional Testing - Calibration and Performance Checks - Lubrication and Adjustments - Documentation in alignment with ISO13485 standards Equipment: 8 https://www.ebiotrack.com/inspection.php?iid=31096 This customer is VT/Full-Service. All parts orders and warranty inquires need to be handled by EMSAR.

Timeline

📞
Case Linked Nov 7, 12:05 AM
Case Number: 00541962
Subject: eBiotrack - Automated New Inspection Created
Status: Closed
📋
2 Work Order Created Nov 7, 2:20 PM
Work Order Created → Status: L2 Screening
🔍
Status: L2 Screening by Shelby Robinson
From: Entered
To: L2 Screening
Duration in Previous: 0m
⚠️ 5.0 business days
📦
2 Parts Requested Nov 14, 5:04 PM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Joseph Whalen
From: L2 Screening
To: Awaiting Parts
Duration in Previous: 7d 2h
⚠️ 5.9 business days
📦
Parts Requested Nov 22, 12:39 AM
Order: 00085735
Status: Closed
🚨 12.0 business days
📅
Status: Ready for Scheduling by Amy Greene Dec 11, 9:39 PM
From: Awaiting Parts
To: Ready for Scheduling
Duration in Previous: 27d 4h
👷
2 Status: Assigned Dec 12, 2:30 PM
Status: Assigned → Technician Assigned
👷
Technician Assigned by Michael Burris
Technician: Angel Rios
💵
Expenses Added Dec 12, 4:41 PM
Type: Expenses
Status: Open
Qty: 1
🚨 12.9 business days
📅
Status: Ready for Scheduling by Amy Greene Dec 31, 12:55 PM
From: Assigned
To: Ready for Scheduling
Duration in Previous: 18d 22h
2.0 business days
Status: Ready for Release by Rhea Berry Jan 2, 10:31 AM
From: Ready for Scheduling
To: Ready for Release
Duration in Previous: 1d 21h
2.0 business days
📦
Status: Awaiting Parts by Rhea Berry Jan 5, 11:52 AM
From: Ready for Release
To: Awaiting Parts
Duration in Previous: 3d 1h
2.0 business days
🔩
2 4x Parts Added Jan 6, 1:33 PM
4x Parts Added → Status: Reschedule
🔄
Status: Reschedule by John Rolston
From: Awaiting Parts
To: Reschedule
Duration in Previous: 1d 1h
Status: Ready for Release by Rhea Berry Jan 7, 10:02 AM
From: Reschedule
To: Ready for Release
Duration in Previous: 20h 29m
🚨 119.0 business days
🔍
Status: L2 Screening by Lauren Oberg Jun 26, 4:28 PM
From: Ready for Release
To: L2 Screening
Duration in Previous: 170d 5h
1.9 business days
📅
Status: Ready for Scheduling by Joseph Whalen Jun 29, 8:10 AM
From: L2 Screening
To: Ready for Scheduling
Duration in Previous: 2d 15h
🔍
Status: L2 Screening by Rhea Berry Jun 29, 12:38 PM
From: Ready for Scheduling
To: L2 Screening
Duration in Previous: 4h 27m
📦
2 Parts Requested Jun 29, 1:01 PM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Joseph Whalen
From: L2 Screening
To: Awaiting Parts
Duration in Previous: 23m
📅
Status: Ready for Scheduling by Melissa Barrett Jun 30, 11:14 AM
From: Awaiting Parts
To: Ready for Scheduling
Duration in Previous: 22h 12m
💵
2x Expenses Added Jun 30, 1:07 PM
Type: Expenses, Parts
Status: Open
Qty: 1, 2
3.0 business days
📅
2 Dispatch Scheduled Jul 2, 1:26 PM
Dispatch Scheduled → Status: Scheduled
🗓️
Status: Scheduled by Michael Burris
From: Ready for Scheduling
To: Scheduled
Duration in Previous: 2d 2h
⚠️ 5.0 business days
🔧
Status: Tech On Site by Angel Rios Jul 9, 3:21 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 7d 1h
📦
2 Parts Requested Jul 9, 10:26 PM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Angel Rios
From: Tech On Site
To: Awaiting Parts
Duration in Previous: 7h 5m
⏱️
3x Labor Added Jul 9, 10:33 PM
Type: Labor, Travel
Status: Open
Qty: 2, 88
⏱️
2x Labor Added Jul 9, 10:41 PM
Type: Labor
Status: Open
Qty: 2, 2.25
⏱️
Labor Added Jul 9, 10:47 PM
Type: Labor
Status: Open
Qty: 2.75
⏱️
Labor Added Jul 10, 1:10 AM
Type: Labor
Status: Open
Qty: 2
📦
Parts Requested Jul 10, 9:00 AM
Order: 00099101
Status: Closed
🔩
2x Parts Added Jul 10, 11:00 AM
Type: Parts, Expenses
Status: Open
Qty: 2, 1
💵
2 Expenses Added Jul 10, 2:33 PM
Expenses Added → Status: Reschedule
🔄
Status: Reschedule by Melissa Barrett
From: Awaiting Parts
To: Reschedule
Duration in Previous: 16h 6m
⚠️ 7.0 business days
🔩
2x Parts Added Jul 20, 6:19 PM
Type: Parts
Status: Open
Qty: 1
⏱️
Labor Added Jul 20, 6:33 PM
Type: Labor
Status: Open
Qty: 1.75
⚠️ 7.7 business days
📅
2 Dispatch Scheduled Jul 29, 5:55 PM
Dispatch Scheduled → Status: Scheduled
🗓️
Status: Scheduled by Michael Burris
From: Reschedule
To: Scheduled
Duration in Previous: 19d 3h
3.8 business days
🔧
Status: Tech On Site by Angel Rios Aug 3, 2:50 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 4d 20h
🚗
2x Travel Added Aug 3, 8:39 PM
Type: Travel
Status: Open
Qty: 88
⏱️
3x Labor Added Aug 3, 8:46 PM
Type: Labor
Status: Open
Qty: 1, 5, 2
✔️
2 Status: Completed Aug 3, 9:15 PM
Status: Completed → Expenses Added
💵
Expenses Added
Type: Expenses
Status: Open
Qty: 1
⏱️
2 Labor Added Aug 3, 11:11 PM
Labor Added → Status: Closed
🏁
Status: Closed by Angel Rios
From: Completed
To: Closed
Duration in Previous: 1h 56m
⚠️ 8.1 business days
📄
Status: Ready to Bill by Diane Patton Aug 13, 1:12 PM
From: Closed
To: Ready to Bill
Duration in Previous: 9d 14h

Bottlenecks

L2 Screening
Duration: 4.6 business days (threshold: 1.0 business days)
Exceeded by 3.6 business days
Awaiting Parts
Duration: 17.6 business days (threshold: 3.0 business days)
Exceeded by 14.6 business days
Assigned
Duration: 12.6 business days (threshold: 4.0 business hours)
Exceeded by 12.1 business days
Ready for Scheduling
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.1 business hours
L2 Screening
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.5 business hours
Ready for Scheduling
Duration: 3.0 business days (threshold: 1.0 business days)
Exceeded by 2.0 business days
Scheduled
Duration: 4.8 business days (threshold: 2.0 business days)
Exceeded by 2.8 business days
Reschedule
Duration: 13.7 business days (threshold: 2.0 business days)
Exceeded by 11.7 business days
Scheduled
Duration: 3.3 business days (threshold: 2.0 business days)
Exceeded by 1.3 business days
Closed
Duration: 8.0 business days (threshold: 1.0 business days)
Exceeded by 7.0 business days

🔗 Related Artifacts

📞
Case 00541962
Closed
📦
Parts Order 00085359
Closed
📦
Parts Order 00085735
Closed
📦
Parts Order 00098579
Closed
📦
Parts Order 00099095
Closed
📦
Parts Order 00099101
Closed

ℹ️ Work Order Details

Status
Ready to Bill
Priority
PSM
Type
Preventive Maintenance
Branch
Edge
Technician
Angel Rios
Scheduled
Aug 3, 1:00 PM
Created
Nov 7, 2:20 PM
Invoice #
N/A

Work Details (27)

Name Type Status Qty Amount Date
WL-03036271 Expenses Open 1 $0.00 Dec 12, 4:41 PM
WL-03054818 Parts Open 1 $324.00 Jan 6, 1:33 PM
WL-03054819 Parts Open 1 $20.25 Jan 6, 1:33 PM
WL-03054820 Parts Open 1 $221.40 Jan 6, 1:33 PM
WL-03054821 Expenses Open 1 $26.72 Jan 6, 1:33 PM
WL-03279029 Expenses Open 1 $18.12 Jun 30, 1:07 PM
WL-03279028 Parts Open 2 $101.26 Jun 30, 1:07 PM
WL-03289513 Labor Open 2 $0.00 Jul 9, 10:33 PM
WL-03289514 Travel Open 88 $275.00 Jul 9, 10:33 PM
WL-03289515 Travel Open 88 $0.00 Jul 9, 10:33 PM
WL-03289534 Labor Open 2 $238.00 Jul 9, 10:41 PM
WL-03289535 Labor Open 2.25 $267.75 Jul 9, 10:41 PM
WL-03289557 Labor Open 2.75 $327.25 Jul 9, 10:47 PM
WL-03289616 Labor Open 2 $0.00 Jul 10, 1:10 AM
WL-03289865 Parts Open 2 $140.08 Jul 10, 11:00 AM
WL-03289866 Expenses Open 1 $0.00 Jul 10, 11:00 AM
WL-03290168 Expenses Open 1 $21.33 Jul 10, 2:33 PM
WL-03300599 Parts Open 1 $221.40 Jul 20, 6:19 PM
WL-03300600 Parts Open 1 $20.25 Jul 20, 6:19 PM
WL-03300615 Labor Open 1.75 $208.25 Jul 20, 6:33 PM
WL-03319142 Travel Open 88 $275.00 Aug 3, 8:39 PM
WL-03319143 Travel Open 88 $0.00 Aug 3, 8:39 PM
WL-03319153 Labor Open 1 $119.00 Aug 3, 8:46 PM
WL-03319152 Labor Open 5 $595.00 Aug 3, 8:46 PM
WL-03319154 Labor Open 2 $0.00 Aug 3, 8:46 PM
WL-03319184 Expenses Open 1 $0.00 Aug 3, 9:18 PM
WL-03319285 Labor Open 2 $0.00 Aug 3, 11:11 PM

Details