Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
Per client agreement
Target:
Jan 31, 2026
🕐 Clock stopped: Completed (Feb 12)
✗ SLA Missed (11d late)
Coordinators
64.1 days
Over SLA
Field Work
1.5 days
Over SLA
Billing
13.5 days
Over SLA
Created: Nov 17, 2025
Due: Jan 31, 2026
Completed: Feb 12, 2026 (11 days late)
⏱️
27.0d in Scheduled
Longest Stage
🔄
11 transitions
Status Changes
⚠️
68.5d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
🔄
2 On-Site Visits
(1 reschedule)
2 on-site visits — follow-up trip required
👤 Self-scheduled by Maria Davis — scheduling delays attributed to technician, not coordinators
Visit 1
Feb 10, 2026
Visit 2
Feb 11, 2026
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00544326
6008155788
Closed
20L
SYS-LC-1260II
Contract ends 10/08/2026 repair included
PM
G7114A
DEACX19974 1260 Infinity II VW Detector
G7129A
DEAEQ36660 1260 Infinity II Vialsampler
G7110B
DEAGK01497 1260 Infinity II Isocratic Pump
G7130A
DEBA705590 Integrated Column Compartment
🚨
Primary Delay
27.0 days stuck in "Scheduled"
⏱️
Total Delay
68.5 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
19.5d
/ 0.5d SLA
Scheduled
33.4d
/ 2.0d SLA
Reschedule
11.2d
/ 2.0d SLA
Tech On Site
1.4d
/ 1.0d SLA
Completed
0.1d
/ 1.0d SLA
Billing Review
4.5d
/ 2.0d SLA
Ready to Bill
9.0d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
2.12.26 hshaw - moved WO to BR, waiting for mService to close. TBA $816.00
02/11 Google map was used to calculate zone. MD
02/10 @nd call of today. Travel, mileage and zone are on WO-01317583 . MD
Please assign to Maria Davis ARP to site is 58 miles. Zone 2
🔧
Work Performed
02/11/2026 LC Infinity II PM was completed per Agilent. All parts were replaced. System was flushed with IPA, leak test failed, after few try still failed, pump was check and piston insulators were replaced, likes from damper to outlet valve and pump house were re-sit, likely has been overtight, system was flushed with IPA, leak/pressure Tests passed. ICC test passed. Intensity Test failed, customer provided lamp and it was replaced, system was flushed with H2O and all tests passed.
02/10/2026 LC PM started.
⚠️
Problem Description
20L
SYS-LC-1260II
Contract ends 10/08/2026 repair included
PM
PM only - customer supplies the UV lamp
PM only - customer supplies the UV lamp
G7114A
DEACX19974 1260 Infinity II VW Detector
G7129A
DEAEQ36660 1260 Infinity II Vialsampler
G7110B
DEAGK01497 1260 Infinity II Isocratic Pump
G7130A
DEBA705590 Integrated Column Compartment
📄
Description
1260 Infinity II Isocratic Pump
📞
Call Description
JAN 225 LC PM
📅
WO-01315503 - Preventive Maintenance - G7110B - Dallas - Cain Food Industries Inc
Feb 11, 2026 11:00am – 4:00pm
Work Order: WO-01315503
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008155788
Location: Cain Food Industries Inc
Address: 8401 Sovereign Row, Dallas, TX 75247
Manufacturer:
Model #: G7110B
Serial #: DEAGK01497
Contact Name: Sara Villarreal
Contact Phone: 469 855 0776
Contact Email: s
Timeline
📞
📋
Work Order:
WO-01315503
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
🗓️
📅
Scheduled For:
2026-01-19T16:00:00.000+0000
🔄
From:
Scheduled
To:
Reschedule
Duration in Previous:
38d 15h
🗓️
📅
Scheduled For:
2026-02-10T16:00:00.000+0000
📅
Scheduled For:
2026-02-11T16:00:00.000+0000
🔧
💵
Type:
Expenses
Status:
Open
Qty:
1
🔩
Type:
Parts
Status:
Open
Qty:
1, 2
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
2, 3, 56, 55
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
1d 0h
🏁
From:
Completed
To:
Closed
Duration in Previous:
25m
💵
From:
Closed
To:
Billing Review
Duration in Previous:
10h 21m
📄
From:
Billing Review
To:
Ready to Bill
Duration in Previous:
5d 14h
📨
🧾
Invoice Number:
SM-255302
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
2m
Bottlenecks
Assigned
Duration: 19.5 business days (threshold: 4.0 business hours)
Exceeded by 19.0 business days
Scheduled
Duration: 27.0 business days (threshold: 2.0 business days)
Exceeded by 25.0 business days
Reschedule
Duration: 11.2 business days (threshold: 2.0 business days)
Exceeded by 9.2 business days
Scheduled
Duration: 6.4 business days (threshold: 2.0 business days)
Exceeded by 4.4 business days
Tech On Site
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.2 business hours
Billing Review
Duration: 4.5 business days (threshold: 2.0 business days)
Exceeded by 2.5 business days
Ready to Bill
Duration: 9.0 business days (threshold: 1.0 business days)
Exceeded by 8.0 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Feb 11, 11:00 AM
Work Details (12)
Name
Type
Status
Qty
Amount
Date
WL-03100393
Expenses
Open
1
$0.00
Feb 10, 10:09 PM
WL-03100394
Parts
Open
1
$0.00
Feb 10, 10:15 PM
WL-03100395
Parts
Open
1
$0.00
Feb 10, 10:15 PM
WL-03100396
Parts
Open
2
$0.00
Feb 10, 10:15 PM
WL-03100397
Parts
Open
1
$0.00
Feb 10, 10:15 PM
WL-03100398
Parts
Open
1
$0.00
Feb 10, 10:15 PM
WL-03102217
Labor
Open
2
$0.00
Feb 11, 9:53 PM
WL-03102218
Labor
Open
3
$456.00
Feb 11, 9:53 PM
WL-03102219
Labor
Open
2
$0.00
Feb 11, 9:53 PM
WL-03102220
Labor
Open
2
$0.00
Feb 11, 9:53 PM
WL-03102221
Travel
Open
56
$359.00
Feb 11, 9:53 PM
WL-03102222
Travel
Open
55
$0.00
Feb 11, 9:53 PM