Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01317247 ↗ ServiceMax

Endoscopy Associates of Valley Forge • Inspection • PSM

📍 Endoscopy Associates of Valley Forge - Emsar — 420 W Linfield-Trappe Road, Building 200 Suite 106, Limerick PA, 19468

Nov 25, 2025 → Mar 10, 2026

✅ Completed
PSM
SLA Clock
Last business day of November 2025 · Target: Nov 28, 2025
✗ SLA Missed (67 biz days late)
Active: 69 biz days
🕐 Clock stopped: Completed (Mar 10, 2026)
▶ Clock Running
Status: Created
Nov 25 → Nov 25, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Nov 25 → Dec 2, 2025
3 business days (counted)
Running total: 3 of ? biz days used
29d
▶ Clock Running
Status: Assigned
Dec 2 → Jan 14, 2026
29 business days (counted)
Running total: 32 of ? biz days used
37d
▶ Clock Running
Status: Scheduled
Jan 14 → Mar 10, 2026
37 business days (counted)
Running total: 69 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 10 → Mar 10, 2026
0 business days (counted)
Running total: 69 of ? biz days used
Created: Nov 25, 2025 Completed: Mar 10, 2026
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Nov 25 → Nov 25 Created ▶ Running 0 0
Nov 25 → Dec 2 Ready for Scheduling ▶ Running 3 3
Dec 2 → Jan 14 Assigned ▶ Running 29 32
Jan 14 → Mar 10 Scheduled ▶ Running 37 69
Mar 10 → Mar 10 Tech On Site ▶ Running 0 69
Dispatch 0.0d
Coordinators 71.0d
Field Work 1.0d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
71.0 days
Over SLA
Field Work
1.0 days
Created: Nov 25, 2025 Due: Mar 31, 2026 Completed: Mar 10, 2026 (21 days early)
📅
69.4 days Total Age
⏱️
37.7d in Scheduled Longest Stage
🔄
7 transitions Status Changes
⚠️
67.9d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00546597
EAVF Waiting for response from Scott.
Closed
Annual Equipment Electrical Safety Test And Calibration Service 2860554-17729-31454 https://www.ebiotrack.com/inspection.php?iid=31454
Priority
High
Origin
Email
Reason
New Case
Contact
Karen Becker
Owner
Kimberly Hardison
Created
Nov 25, 2025
Work Orders from this Case (1)
WO-01317247 (current) Invoiced
Inspection • Philip Krogstad
Created: Nov 25, 2025 • Closed: Mar 10, 2026
Completed with significant delays
Invoiced • 263 days old
🚨
Primary Delay 37.7 days stuck in "Scheduled"
⏱️
Total Delay 67.9 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
3.3d / 1.0d SLA
Assigned
30.0d / 0.5d SLA
Scheduled
37.7d / 2.0d SLA
Tech On Site
0.6d / 1.0d SLA
Completed
0.5d / 1.0d SLA
Closed
1.3d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

1/14 MOwens Karen replied back to the email and requested 3/10 for the inspection visit. Sent reply back confirming arrival between 9-10am on 3/10.

1/7 MOwens Karen Becker sent email asking to schedule the inspection visit before 3/28/26. Replied back if she had a date in mind for scheduling the visit.

🔧 Work Performed
Performed annual equipment inspection (72 pcs). Worked with staff to find all equipment.
🔍 Technician Findings
Check in withs staff. PErform annual equipment inspection.
⚠️ Problem Description
Annual Equipment Electrical Safety Test And Calibration Service 2860554-17729-31454 https://www.ebiotrack.com/inspection.php?iid=31454

Timeline

📞
Case Linked Nov 25, 8:37 AM
Case Number: 00546597
Subject: EAVF Waiting for response from Scott.
Status: Closed
📋
Work Order Created Nov 25, 4:01 PM
Work Order: WO-01317247
Type: Inspection
Priority: PSM
📅
Status: Ready for Scheduling by Kimberly Hardison Nov 25, 4:12 PM
From: Entered
To: Ready for Scheduling
Duration in Previous: 11m
4.0 business days
👷
2 Technician Assigned Dec 2, 10:19 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Melissa Owens
From: Ready for Scheduling
To: Assigned
Duration in Previous: 6d 18h
🚨 30.0 business days
🗓️
2 Status: Scheduled Jan 14, 1:25 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Melissa Owens
Scheduled For: 2026-03-10T13:00:00.000+0000
🚨 38.0 business days
🔧
Status: Tech On Site by Philip Krogstad Mar 10, 8:49 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 54d 18h
⏱️
2 3x Labor Added Mar 10, 1:27 PM
3x Labor Added → Status: Completed
✔️
Status: Completed by Philip Krogstad
From: Tech On Site
To: Completed
Duration in Previous: 4h 40m
🏁
Status: Closed by Philip Krogstad Mar 10, 5:12 PM
From: Completed
To: Closed
Duration in Previous: 3h 43m
📄
Status: Ready to Bill by Diane Patton Mar 11, 11:16 AM
From: Closed, Ready to Bill, Invoice Pending
To: Ready to Bill, Invoice Pending, Invoiced
Duration in Previous: 18h 4m, 0m
3.0 business days
🧾
Invoice Created Mar 13, 6:18 PM
Invoice Number: SM-256159

Bottlenecks

Ready for Scheduling
Duration: 3.3 business days (threshold: 1.0 business days)
Exceeded by 2.3 business days
Assigned
Duration: 30.0 business days (threshold: 4.0 business hours)
Exceeded by 29.5 business days
Scheduled
Duration: 37.7 business days (threshold: 2.0 business days)
Exceeded by 35.7 business days
Closed
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.8 business hours

🔗 Related Artifacts

📞
Case 00546597
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Inspection
Branch
EBS
Technician
Philip Krogstad
Scheduled
Mar 10, 9:00 AM
Created
Nov 25, 4:01 PM
Invoice #
SM-256159

Work Details (3)

Name Type Status Qty Amount Date
WL-03137483 Labor Open 1 $0.00 Mar 10, 1:27 PM
WL-03137484 Labor Open 4.75 $2,137.60 Mar 10, 1:27 PM
WL-03137485 Travel Open 33 - Mar 10, 1:27 PM

Details