Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01318246 ↗ ServiceMax

Stony Brook Medicine • Repair • P3

📍 Stony Brook - FMD- PATCHOGUE - 20324 — 285 SILLS RD, Bldg. 12, Suite C, PATCHOGUE NY, 11772

Dec 2, 2025 → Apr 3, 2026

✅ Completed
P3
SLA Clock
3 business days from creation · Target: Dec 5, 2025
✗ SLA Missed (41 biz days late)
Active: 44 biz days
Paused: 40 biz days
Budget: 3 biz days
🕐 Clock stopped: Completed (Apr 3, 2026)
SLA Target
▶ Clock Running
Status: Created
Dec 2 → Dec 2, 2025
0 business days (counted)
Running total: 0 of 3 biz days used
▶ Clock Running
Status: L2 Screening
Dec 2 → Dec 2, 2025
0 business days (counted)
Running total: 0 of 3 biz days used
⏸30d
⏸ Clock Paused
Status: Awaiting Parts
Dec 2 → Jan 15, 2026
30 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Jan 15 → Jan 15, 2026
0 business days (counted)
Running total: 0 of 3 biz days used
▶ Clock Running
Status: Assigned
Jan 15 → Jan 19, 2026
1 business day (counted)
Running total: 1 of 3 biz days used
▶ Clock Running
Status: Scheduled
Jan 19 → Jan 20, 2026
1 business day (counted)
Running total: 2 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Jan 20 → Jan 20, 2026
0 business days (counted)
Running total: 2 of 3 biz days used
▶ Clock Running
Status: Incomplete
Jan 20 → Jan 20, 2026
0 business days (counted)
Running total: 2 of 3 biz days used
▶ Clock Running
Status: Completed
Jan 20 → Jan 26, 2026
4 business days (counted)
Running total: 6 of 3 biz days used
▶ Clock Running
Status: On Hold
Jan 26 → Jan 26, 2026
0 business days (counted)
Running total: 6 of 3 biz days used
▶ Clock Running
Status: Reschedule
Jan 26 → Jan 27, 2026
1 business day (counted)
Running total: 7 of 3 biz days used
▶ Clock Running
Status: Assigned
Jan 27 → Jan 27, 2026
0 business days (counted)
Running total: 7 of 3 biz days used
▶ Clock Running
Status: Scheduled
Jan 27 → Jan 30, 2026
3 business days (counted)
Running total: 10 of 3 biz days used
21d
▶ Clock Running
Status: Incomplete
Jan 30 → Mar 3, 2026
21 business days (counted)
Running total: 31 of 3 biz days used
▶ Clock Running
Status: L2 Screening
Mar 3 → Mar 3, 2026
0 business days (counted)
Running total: 31 of 3 biz days used
⏸ Clock Paused
Status: Awaiting Parts
Mar 3 → Mar 5, 2026
2 business days (not counted)
▶ Clock Running
Status: Reschedule
Mar 5 → Mar 9, 2026
2 business days (counted)
Running total: 33 of 3 biz days used
▶ Clock Running
Status: Scheduled
Mar 9 → Mar 17, 2026
6 business days (counted)
Running total: 39 of 3 biz days used
▶ Clock Running
Status: Reschedule
Mar 17 → Mar 17, 2026
0 business days (counted)
Running total: 39 of 3 biz days used
▶ Clock Running
Status: Incomplete
Mar 17 → Mar 20, 2026
3 business days (counted)
Running total: 42 of 3 biz days used
▶ Clock Running
Status: L2 Screening
Mar 20 → Mar 20, 2026
0 business days (counted)
Running total: 42 of 3 biz days used
⏸8d
⏸ Clock Paused
Status: Awaiting Parts
Mar 20 → Apr 1, 2026
8 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Apr 1 → Apr 1, 2026
0 business days (counted)
Running total: 42 of 3 biz days used
▶ Clock Running
Status: Entered
Apr 1 → Apr 1, 2026
0 business days (counted)
Running total: 42 of 3 biz days used
▶ Clock Running
Status: Assigned
Apr 1 → Apr 1, 2026
0 business days (counted)
Running total: 42 of 3 biz days used
▶ Clock Running
Status: Scheduled
Apr 1 → Apr 3, 2026
2 business days (counted)
Running total: 44 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Apr 3 → Apr 3, 2026
0 business days (counted)
Running total: 44 of 3 biz days used
Created: Dec 2, 2025 Completed: Apr 3, 2026
Business Days Used 44 / 3
0 3d budget +41d over
Show SLA Clock Detail (27 periods)
Period Status Clock Biz Days Running Total
Dec 2 → Dec 2 Created ▶ Running 0 0 / 3
Dec 2 → Dec 2 L2 Screening ▶ Running 0 0 / 3
Dec 2 → Jan 15 Awaiting Parts ⏸ Paused 30
Jan 15 → Jan 15 Ready for Scheduling ▶ Running 0 0 / 3
Jan 15 → Jan 19 Assigned ▶ Running 1 1 / 3
Jan 19 → Jan 20 Scheduled ▶ Running 1 2 / 3
Jan 20 → Jan 20 Tech On Site ▶ Running 0 2 / 3
Jan 20 → Jan 20 Incomplete ▶ Running 0 2 / 3
Jan 20 → Jan 26 Completed ▶ Running 4 6 / 3
Jan 26 → Jan 26 On Hold ▶ Running 0 6 / 3
Jan 26 → Jan 27 Reschedule ▶ Running 1 7 / 3
Jan 27 → Jan 27 Assigned ▶ Running 0 7 / 3
Jan 27 → Jan 30 Scheduled ▶ Running 3 10 / 3
Jan 30 → Mar 3 Incomplete ▶ Running 21 31 / 3
Mar 3 → Mar 3 L2 Screening ▶ Running 0 31 / 3
Mar 3 → Mar 5 Awaiting Parts ⏸ Paused 2
Mar 5 → Mar 9 Reschedule ▶ Running 2 33 / 3
Mar 9 → Mar 17 Scheduled ▶ Running 6 39 / 3
Mar 17 → Mar 17 Reschedule ▶ Running 0 39 / 3
Mar 17 → Mar 20 Incomplete ▶ Running 3 42 / 3
Mar 20 → Mar 20 L2 Screening ▶ Running 0 42 / 3
Mar 20 → Apr 1 Awaiting Parts ⏸ Paused 8
Apr 1 → Apr 1 Ready for Scheduling ▶ Running 0 42 / 3
Apr 1 → Apr 1 Entered ▶ Running 0 42 / 3
Apr 1 → Apr 1 Assigned ▶ Running 0 42 / 3
Apr 1 → Apr 3 Scheduled ▶ Running 2 44 / 3
Apr 3 → Apr 3 Tech On Site ▶ Running 0 44 / 3
Dispatch 0.3d
Material Management 41.1d
Coordinators 20.9d
Field Work 0.5d
Incomplete 30.0d (excluded)
Billing 0.0d
✗ SLA Missed
Dispatch
0.3 days
Material Management
41.1 days
Over SLA
Coordinators
20.9 days
Over SLA
Field Work
0.5 days
Incomplete (excluded from total)
30.0 days
Billing
0.0 days
Created: Dec 2, 2025 Due: Apr 6, 2026 Completed: Apr 3, 2026 (3 days early)
📅
84.6 days Total Age
⏱️
30.3d in Awaiting Parts Longest Stage
🔄
25 transitions Status Changes
⚠️
44.5d over Total Delay
📦
3 orders, 0 quotes Parts & Quotes
📝
17 lines Work Details
🚩
3 visits On-Site Trips
👤
Self-Scheduled Scheduling
🚩
3 On-Site Visits (3 reschedules)
3 on-site visits — why were multiple trips needed?
👤 Self-scheduled by Mohamed Shareed — scheduling delays attributed to technician, not coordinators
Visit 1 Jan 20, 2026
Visit 2 Mar 17, 2026
Visit 3 Apr 3, 2026

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00547716
L2 review - HCP * no quote needed per SMC
Closed
Follow up to WO-01300704 Inspection #: 29807 Asset ID: 12949566 Model: Drive Medical - Wheelchair Notes: Noticeable physical damage on device Follow-up required. Missing screws from arm rest pad. Arm rest pad not attatched Part needed Arm Pad Screws Drive Medical (STDS002001)
Priority
Standard
Origin
Email
Reason
New Case
Contact
Jessica Jason
Owner
Leona Coonrod
Created
Dec 1, 2025
Work Orders from this Case (1)
WO-01318246 (current) Invoiced
Repair • Mohamed Shareed
Created: Dec 2, 2025 • Closed: Apr 3, 2026
Completed with significant delays
Invoiced • 254 days old
🚨
Primary Delay 30.3 days stuck in "Awaiting Parts"
⏱️
Total Delay 44.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
L2 Screening
0.3d / 1.0d SLA
Awaiting Parts
41.1d / 3.0d SLA
Ready for Scheduling
0.1d / 1.0d SLA
Assigned
1.5d / 0.5d SLA
Scheduled
14.9d / 2.0d SLA
Completed
0.4d / 1.0d SLA
Incomplete
30.0d
Reschedule
4.4d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Closed
3.0d / 1.0d SLA
Billing Review
0.0d / 2.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

4/2/26 Rberry- updated due date based on parts. Removed delay code.


4/1 KSmith -- Scheduled for 4/3 with Jessica. 9-11am

4/1 KSmith -- Teams message to Rhea to flip this to RFS. All part orders are now closed. Sent email to schedule for 4/3 (MS)

3/30 KSmith -- Chatter to John R on PO 00091476. Notes look like parts arrived on 3/5. All other part orders are closed

03/25/2026 MBARRETT: Ordered to site ( Long was requested)

03/20/2027 MBarrett - Armrest come in long or short. Reaching out to Keith for verification

3/20 KWeiss, Part has been added to SMX and customer had already been quoted. Moving w/o to L2 Screening for part order.

3/20 KWeiss, No s/n has been provided and Drive Medical is not able to help without it. 1st visit, screws were sent to replace missing screw, and found threaded insert in armrest pad was missing. 2nd visit, universal armrest pads, found online, was set up and added to SMX by orders, Tech found the ones sent were about 10.5 .New arm rest needed size 13.5-14 inches. Found universal pads, 13 7/8 in length, and sent email request, and link, to orders to be set up to order.

3/17 KSmith -- Teams message to Shawn this needs to go into incomplete, wrong parts sent, needs to be ordered

03/10/2026 DNakoff - Cannot charge for first two visits. Wrong parts sent and no hardware for first two visits.

3/9 KSmith -- Scheduled for 3/17 with Jessica. FSEs are booked all week on a past due inspection that has to be completed this week.

3/6/26 RBerry- Updated due date based on parts. Per notes in parts order, parts delivered on 3/5/26.


3/6 KSmith -- Sent email to schedule for 3/17. Both FSEs are booked on a large past due inspection next week that cannot be rescheduled

3/3 KWeiss, Quote approved, moving w/o to L2 Screening for part order.

3/2 KSmith -- Sales is working on quote to be sent to customer

2/27 KWeiss, Created case and sent to sales for quoting.

2/24 KWeiss, Found universal armrest pads online. Email sent to orders, with link to site, asking if they can be ordered from Amazon with no p/n.

2/23 KSmith -- Chatter to Keith to see if anything further can be done with this. There is no serial number on the unit and according to internal notes below, parts won't be sent without a serial number.

2/9 KWeiss, Started a live chat with Drive Medical. After chatting for a while, they were not able to provide a p/n without a s/n.

2/9 KSmith -- Teams message to Shawn to check on this one

1/30 KWeiss, Chatter sent to Shawn Rogers to let him know more info was needed for correct part to be quoted and ordered.

1/30 KSmith -- WO needs to go back into incomplete status. WO was moved from Incomplete to On Hold and then to rescheduled status, skipping the process to have the additional parts ordered. Teams message to Shawn to move this to incomplete so the process can be followed correctly and additional parts ordered

1/30 KSmith -- FSE called off sick. Rescheduled for 2/3 with Jessica. 9-11am

1/27 KSmith -- Scheduled for 1/30 with Jessica. 1-3pm

1/27 KSmith -- WO was taken off hold on 1/26. Sent email to schedule for Friday

1/22 KWeiss, Chatter sent to tech and supervisor asking tech if he was able to gather the product info to find the correct part needed.

1/20 KSmith -- Rescheduled for today with Jessica.

1/19 KSmith -- Scheduled for 1/22 with Jessica. 9-11am

1/16 KSmith -- Sent email to schedule for 1/22

🔧 Work Performed
Received 2 screws found arm rest pad missing screw insert nut. Unable to use arm rest pad. 04/03/2026 MShareed- Installed left and right arm rest on wheel chair. Tested all functions no faults.
🔍 Technician Findings
Found arm rest pad not mount on wheelchair. 3/17/2026 Found arm sent was the wrong size.Old one is about 13.5 inches.The ones sent were about 10.5 .New arm rest needed size 13.5-14 inches
⚠️ Problem Description
Follow up to WO-01300704 Inspection #: 29807 Asset ID: 12949566 Model: Drive Medical - Wheelchair Notes: Noticeable physical damage on device Follow-up required. Missing screws from arm rest pad. Arm rest pad not attatched Part needed Arm Pad Screws Drive Medical (STDS002001) https://www.ebiotrack.com/workorder.php?wo=70060

Timeline

📞
Case Linked Dec 1, 1:03 PM
Case Number: 00547716
Subject: L2 review - HCP * no quote needed per SMC
Status: Closed
2.0 business days
📋
2 Work Order Created Dec 2, 1:59 PM
Work Order Created → Status: L2 Screening
🔍
Status: L2 Screening by Leona Coonrod
From: Entered
To: L2 Screening
Duration in Previous: 0m
📦
2 Parts Requested Dec 2, 4:42 PM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Keith Weiss
From: L2 Screening
To: Awaiting Parts
Duration in Previous: 2h 42m
🚨 30.9 business days
📅
Status: Ready for Scheduling by Audrey Tharp Jan 15, 2:24 PM
From: Awaiting Parts
To: Ready for Scheduling
Duration in Previous: 43d 21h
💵
Expenses Added Jan 15, 2:38 PM
Type: Expenses
Status: Open
Qty: 1
👷
2 Technician Assigned Jan 15, 3:14 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kourtney Smith
From: Ready for Scheduling
To: Assigned
Duration in Previous: 50m
2.0 business days
📅
2 Dispatch Scheduled Jan 19, 4:58 PM
Dispatch Scheduled → Status: Scheduled
🗓️
Status: Scheduled by Kourtney Smith
From: Assigned
To: Scheduled
Duration in Previous: 4d 1h
📅
Dispatch Scheduled by Kourtney Smith Jan 20, 11:24 AM
Scheduled For: 2026-01-20T20:00:00.000+0000
🔧
Status: Tech On Site by Mohamed Shareed Jan 20, 4:58 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 23h 59m
⏱️
2 6x Labor Added Jan 20, 5:51 PM
6x Labor Added → Status: Incomplete
⚠️
Status: Incomplete by Mohamed Shareed
From: Completed, Tech On Site
To: Incomplete, Completed
Duration in Previous: 55m, 0m
4.8 business days
⏸️
Status: On Hold by Mark Joseph Jan 26, 1:38 PM
From: Incomplete, On Hold
To: On Hold, Reschedule
Duration in Previous: 5d 19h, 0m
👷
3 Technician Assigned Jan 27, 11:48 AM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kourtney Smith
From: Reschedule, Assigned
To: Assigned, Scheduled
Duration in Previous: 22h 8m, 0m
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-01-30T19:00:00.000+0000
3.0 business days
📅
Dispatch Scheduled by Kourtney Smith Jan 29, 8:06 AM
Scheduled For: 2026-01-30T15:00:00.000+0000
📅
2 Dispatch Scheduled Jan 30, 8:02 AM
Dispatch Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-02-03T15:00:00.000+0000
⚠️
Status: Incomplete by Shawn Rogers Jan 30, 9:43 AM
From: Scheduled
To: Incomplete
Duration in Previous: 2d 21h
🚨 22.0 business days
🔍
2 Status: L2 Screening Mar 3, 6:02 PM
Status: L2 Screening → Parts Requested
📦
Parts Requested
Order: 00091476
Status: Closed
2.7 business days
💵
2 Expenses Added Mar 5, 1:40 PM
Expenses Added → Status: Reschedule
🔄
Status: Reschedule by John Rolston
From: Awaiting Parts
To: Reschedule
Duration in Previous: 1d 19h
2.9 business days
🗓️
2 Status: Scheduled Mar 9, 8:15 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-03-17T14:00:00.000+0000
⚠️ 7.0 business days
⏱️
2 3x Labor Added Mar 17, 11:48 AM
3x Labor Added → Status: Reschedule
🔄
Status: Reschedule by Edward Arias
From: Scheduled
To: Reschedule
Duration in Previous: 8d 3h
⚠️
Status: Incomplete by Shawn Rogers Mar 17, 12:44 PM
From: Reschedule
To: Incomplete
Duration in Previous: 54m
4.0 business days
🔍
3 Status: L2 Screening Mar 20, 2:26 PM
Status: L2 Screening → Parts Requested → Status: Awaiting Parts
📦
Parts Requested
Order: 00093058
Status: Closed
📦
Status: Awaiting Parts by Keith Weiss
From: L2 Screening
To: Awaiting Parts
Duration in Previous: 1m
4.0 business days
🔩
2x Parts Added Mar 25, 9:18 AM
Type: Parts, Expenses
Status: Open
Qty: 1
⚠️ 6.0 business days
📅
Status: Ready for Scheduling by Rhea Berry Apr 1, 10:09 AM
From: Awaiting Parts
To: Ready for Scheduling
Duration in Previous: 11d 19h
🆕
3 Status: Entered Apr 1, 10:21 AM
Status: Entered → Technician Assigned → Dispatch Scheduled
👷
Technician Assigned by Kourtney Smith
Technician: Mohamed Shareed
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-04-03T13:30:00.000+0000
3.0 business days
🔧
Status: Tech On Site by Mohamed Shareed Apr 3, 8:47 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 1d 22h
⏱️
2 4x Labor Added Apr 3, 9:20 AM
4x Labor Added → Status: Completed
✔️
Status: Completed by Mohamed Shareed
From: Tech On Site
To: Completed
Duration in Previous: 36m
🏁
Status: Closed by Mohamed Shareed Apr 3, 11:49 AM
From: Completed
To: Closed
Duration in Previous: 2h 25m
3.0 business days
📄
2 Status: Ready to Bill Apr 7, 1:53 PM
Status: Ready to Bill → Status: Ready to Bill
📄
Status: Ready to Bill by Diane Patton
From: Billing Review, Ready to Bill
To: Ready to Bill, Invoice Pending
Duration in Previous: 2m, 0m
💰
2 Status: Invoiced Apr 7, 1:59 PM
Status: Invoiced → Invoice Created
🧾
Invoice Created
Invoice Number: SM-258590

Bottlenecks

Awaiting Parts
Duration: 30.3 business days (threshold: 3.0 business days)
Exceeded by 27.3 business days
Assigned
Duration: 1.5 business days (threshold: 4.0 business hours)
Exceeded by 7.8 business hours
Scheduled
Duration: 3.9 business days (threshold: 2.0 business days)
Exceeded by 1.9 business days
Reschedule
Duration: 2.7 business days (threshold: 2.0 business days)
Exceeded by 5.3 business hours
Scheduled
Duration: 7.0 business days (threshold: 2.0 business days)
Exceeded by 5.0 business days
Awaiting Parts
Duration: 8.7 business days (threshold: 3.0 business days)
Exceeded by 5.7 business days
Scheduled
Duration: 3.0 business days (threshold: 2.0 business days)
Exceeded by 1.0 business days
Closed
Duration: 3.0 business days (threshold: 1.0 business days)
Exceeded by 2.0 business days

🔗 Related Artifacts

📞
Case 00547716
Closed
📦
Parts Order 00086128
Closed
📦
Parts Order 00091476
Closed
📦
Parts Order 00093058
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
P3
Type
Repair
Branch
N/A
Technician
Mohamed Shareed
Scheduled
Apr 3, 9:30 AM
Created
Dec 2, 1:59 PM
Invoice #
SM-258590

Work Details (17)

Name Type Status Qty Amount Date
WL-03066536 Expenses Open 1 $0.00 Jan 15, 2:38 PM
WL-03072370 Labor Open 0.25 $205.50 Jan 20, 5:51 PM
WL-03072371 Labor Open 0.75 $102.75 Jan 20, 5:51 PM
WL-03072372 Labor Open 2 $0.00 Jan 20, 5:51 PM
WL-03072373 Travel Open 2 - Jan 20, 5:51 PM
WL-03072374 Travel Open 57 - Jan 20, 5:51 PM
WL-03072375 Expenses Open 1 $0.00 Jan 20, 5:51 PM
WL-03131598 Expenses Open 1 $0.00 Mar 5, 1:40 PM
WL-03147175 Labor Open 2.25 $0.00 Mar 17, 11:48 AM
WL-03147176 Labor Open 0.5 $0.00 Mar 17, 11:48 AM
WL-03147177 Travel Open 72 - Mar 17, 11:48 AM
WL-03158286 Parts Open 1 $17.54 Mar 25, 9:18 AM
WL-03158287 Expenses Open 1 $0.00 Mar 25, 9:18 AM
WL-03172122 Labor Open 1.5 $205.50 Apr 3, 9:20 AM
WL-03172123 Labor Open 0.75 $102.75 Apr 3, 9:20 AM
WL-03172124 Travel Open 58 - Apr 3, 9:20 AM
WL-03172125 Expenses Open 1 $0.00 Apr 3, 9:20 AM

Details