WO-01327018 ↗ ServiceMax

The Cigna Group • Inspection • PSM

📍 Orange County Office Wellness Center- Cigna — 2500 W. Colonial Dr., Orlando FL, 32804

Dec 17, 2025 → Feb 2, 2026

✅ Completed
PSM Last business day of December 2025
Target: Dec 31, 2025
🕐 Clock stopped: Completed (Feb 2)
✗ SLA Missed (33d late)
Dispatch 0.0d
Coordinators 35.2d
Field Work 0.1d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
35.2 days
Over SLA
Field Work
0.1 days
Created: Dec 17, 2025 Due: Feb 27, 2026 Completed: Feb 2, 2026 (25 days early)
📅
33.9 days Total Age
⏱️
26.0d in Scheduled Longest Stage
🔄
7 transitions Status Changes
⚠️
32.7d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
5 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00552317
eBiotrack - Automated New Inspection Created
Closed
Annual Equipment Electrical Safety Test And Calibration Service 20 Pcs https://www.ebiotrack.com/inspection.php?iid=31967
Priority
Standard
Origin
Email
Reason
New Case
Contact
Patricia Burlone
Owner
Kimberly Hardison
Created
Dec 17, 2025
Work Orders from this Case (1)
WO-01327018 (current) Invoiced
Inspection • Anthony Wright
Created: Dec 17, 2025 • Closed: Feb 2, 2026
Completed with significant delays
Invoiced • 148 days old
🚨
Primary Delay 26.0 days stuck in "Scheduled"
⏱️
Total Delay 32.7 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
7.9d / 1.0d SLA
Assigned
1.3d / 0.5d SLA
Scheduled
26.0d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
2.0d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

12/29/25 AJinerson - Sent email back stating we will proceed with scheduling for Monday, 2/2/26 with eta between 9am-11am. Letting her know tech may only need 1-2 hours on-site. Asking for below:

On-site contact: Patricia Hernandez

Arrival instructions:

Specific Requirements:


12/29/25 AJinerson - Received email back from POC Patricia Hernandez stating any date is fine, asking for timeframe of arrival.


12/26/25 AJinerson - Sent scheduling email to POC Patricia asking what dates in Feb. 2026 works best for this location to schedule service.

Monday, 2/2/26 - Friday, 2/6/26

Monday, 2/9/26 - Friday, 2/13/26 

Monday, 2/6/26 - Friday, 2/20/26 

🔧 Work Performed
2/2/26 AMW - Performed annual inspection on all medical equipment located. Total of 18 pieces of equipment inspected. 1 Failure - LabCorp Centrifuge 642E RPM out of range @ 3289. POC will replace no need for follow up. Notified POC of inspection findings and completion.
🔍 Technician Findings
2/2/26 AMW - Perform annual inspection on all medical equipment located. Notify POC of inspection findings and completion.
⚠️ Problem Description
Annual Equipment Electrical Safety Test And Calibration Service 20 Pcs https://www.ebiotrack.com/inspection.php?iid=31967

Timeline

📞
Case Linked Dec 17, 6:00 AM
Case Number: 00552317
Subject: eBiotrack - Automated New Inspection Created
Status: Closed
📋
2 Work Order Created Dec 17, 11:54 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Kimberly Hardison
From: Entered
To: Ready for Scheduling
Duration in Previous: 0m
⚠️ 8.0 business days
👷
2 Technician Assigned Dec 26, 4:28 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Abby Jinerson
From: Ready for Scheduling
To: Assigned
Duration in Previous: 9d 4h
1.9 business days
📅
2 Dispatch Scheduled Dec 29, 9:06 AM
Dispatch Scheduled → Status: Scheduled
🗓️
Status: Scheduled by Ben Saur
From: Assigned
To: Scheduled
Duration in Previous: 2d 16h
🚨 26.0 business days
🔧
2 Status: Tech On Site Feb 2, 10:05 AM
Status: Tech On Site → 2x Labor Added
⏱️
2x Labor Added
Type: Labor, Travel
Status: Open
Qty: 1.5, 56
⏱️
2 3x Labor Added Feb 2, 10:34 AM
3x Labor Added → Status: Completed
✔️
Status: Completed by Anthony Wright
From: Tech On Site
To: Completed
Duration in Previous: 32m
🏁
Status: Closed by Anthony Wright Feb 2, 10:40 AM
From: Completed
To: Closed
Duration in Previous: 3m
📄
Status: Ready to Bill by Diane Patton Feb 3, 9:33 AM
From: Closed, Ready to Bill, Invoice Pending
To: Ready to Bill, Invoice Pending, Invoiced
Duration in Previous: 22h 53m, 0m
4.0 business days
🧾
Invoice Created Feb 6, 4:23 PM
Invoice Number: SM-252851

Bottlenecks

Ready for Scheduling
Duration: 7.9 business days (threshold: 1.0 business days)
Exceeded by 6.9 business days
Assigned
Duration: 1.3 business days (threshold: 4.0 business hours)
Exceeded by 6.5 business hours
Scheduled
Duration: 26.0 business days (threshold: 2.0 business days)
Exceeded by 24.0 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days

🔗 Related Artifacts

📞
Case 00552317
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Inspection
Branch
Edge
Technician
Anthony Wright
Scheduled
Feb 2, 9:00 AM
Created
Dec 17, 11:54 AM
Invoice #
SM-252851

Work Details (5)

Name Type Status Qty Amount Date
WL-03087680 Labor Open 1.5 $0.00 Feb 2, 10:06 AM
WL-03087681 Travel Open 56 - Feb 2, 10:06 AM
WL-03087735 Labor Open 1.25 $895.00 Feb 2, 10:34 AM
WL-03087736 Labor Open 0.25 $0.00 Feb 2, 10:34 AM
WL-03087737 Travel Open 3 - Feb 2, 10:34 AM

Details