Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01328549 ↗ ServiceMax

Atrius Health • Inspection • PSM

📍 Atrius PMG Bourne — 2 Technology Park Drive, Bourne MA, 02532

Dec 31, 2025 → Mar 3, 2026

✅ Completed
PSM
SLA Clock
Last business day of December 2025 · Target: Dec 31, 2025
✗ SLA Missed (40 biz days late)
Active: 41 biz days
🕐 Clock stopped: Completed (Mar 3, 2026)
▶ Clock Running
Status: Created
Dec 31 → Dec 31, 2025
0 business days (counted)
Running total: 0 of ? biz days used
6d
▶ Clock Running
Status: Ready for Scheduling
Dec 31 → Jan 9, 2026
6 business days (counted)
Running total: 6 of ? biz days used
▶ Clock Running
Status: Assigned
Jan 9 → Jan 9, 2026
0 business days (counted)
Running total: 6 of ? biz days used
5d
▶ Clock Running
Status: Scheduled
Jan 9 → Jan 16, 2026
5 business days (counted)
Running total: 11 of ? biz days used
▶ Clock Running
Status: Reschedule
Jan 16 → Jan 16, 2026
0 business days (counted)
Running total: 11 of ? biz days used
30d
▶ Clock Running
Status: Scheduled
Jan 16 → Mar 3, 2026
30 business days (counted)
Running total: 41 of ? biz days used
Created: Dec 31, 2025 Completed: Mar 3, 2026
Show SLA Clock Detail (6 periods)
Period Status Clock Biz Days Running Total
Dec 31 → Dec 31 Created ▶ Running 0 0
Dec 31 → Jan 9 Ready for Scheduling ▶ Running 6 6
Jan 9 → Jan 9 Assigned ▶ Running 0 6
Jan 9 → Jan 16 Scheduled ▶ Running 5 11
Jan 16 → Jan 16 Reschedule ▶ Running 0 11
Jan 16 → Mar 3 Scheduled ▶ Running 30 41
Dispatch 0.0d
Coordinators 43.0d
Billing 3.0d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
43.0 days
Over SLA
Billing
3.0 days
Over SLA
Created: Dec 31, 2025 Due: Mar 31, 2026 Completed: Mar 3, 2026 (28 days early)
📅
42.0 days Total Age
⏱️
30.4d in Scheduled Longest Stage
🔄
7 transitions Status Changes
⚠️
42.2d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
0 lines Work Details
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00555172
eBiotrack - Automated New Inspection Created
Closed
Inspection: Semi-Annual Equipment Calibration Service - Infusion Pump https://www.ebiotrack.com/inspection.php?iid=32224
Priority
Standard
Origin
Email
Reason
New Case
Contact
Andrew Coleman
Owner
Jessica Sells
Created
Dec 31, 2025
Work Orders from this Case (1)
WO-01328549 (current) Canceled
Inspection • David Cavaco
Created: Dec 31, 2025 • Closed: Mar 3, 2026
Behind Schedule - Needs Attention
Canceled • 228 days old
🚨
Primary Delay 30.4 days stuck in "Scheduled"
⏱️
Total Delay 42.2 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
7.0d / 1.0d SLA
Scheduled
36.0d / 2.0d SLA
Reschedule
0.0d / 2.0d SLA
Closed
4.2d / 1.0d SLA
Billing Review
3.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

3/9/26 DPatton - Does this WO need to be cancelled? ( Infusion pumps no longer at this location).

3/3 DC Closing work order, Infusion pumps no longer at this location. Time and labor are on the Semi annual cal work order


1/9 KSmith -- Scheduled for 3/3 with Michelle. 8-10am on WO-01328551

1/9 KSmith -- Scheduled for 1/16 with Michelle on WO-01317025

🔧 Work Performed
3/3 DC Closing work order, Infusion pumps no longer at this location. Time and labor are on the Semi annual cal work order
🔍 Technician Findings
3/3 DC Closing work order, Infusion pumps no longer at this location. Time and labor are on the Semi annual cal work order
⚠️ Problem Description
Inspection: Semi-Annual Equipment Calibration Service - Infusion Pump https://www.ebiotrack.com/inspection.php?iid=32224

Timeline

📞
Case Linked Dec 31, 12:01 AM
Case Number: 00555172
Subject: eBiotrack - Automated New Inspection Created
Status: Closed
📋
2 Work Order Created Dec 31, 10:31 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Jessica Sells
From: Entered
To: Ready for Scheduling
Duration in Previous: 0m
⚠️ 7.0 business days
👷
3 Technician Assigned Jan 9, 2:15 PM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kourtney Smith
From: Ready for Scheduling, Assigned
To: Assigned, Scheduled
Duration in Previous: 9d 3h, 0m
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-01-16T20:00:00.000+0000
⚠️ 6.0 business days
🔄
3 Status: Reschedule Jan 16, 3:53 PM
Status: Reschedule → Dispatch Scheduled → Status: Scheduled
📅
Dispatch Scheduled by Kourtney Smith
Scheduled For: 2026-03-03T14:00:00.000+0000
🗓️
Status: Scheduled by Kourtney Smith
From: Reschedule
To: Scheduled
Duration in Previous: 1m
🚨 31.0 business days
✔️
Status: Completed by DAVID CAVACO Mar 3, 5:25 PM
From: Scheduled, Completed
To: Completed, Closed
Duration in Previous: 46d 1h, 0m
4.8 business days
💵
Status: Billing Review by Diane Patton Mar 9, 9:27 AM
From: Closed
To: Billing Review
Duration in Previous: 5d 15h
3.0 business days
🚫
Status: Canceled by Scott Berry Mar 11, 1:33 PM
From: Billing Review
To: Canceled
Duration in Previous: 2d 4h

Bottlenecks

Ready for Scheduling
Duration: 7.0 business days (threshold: 1.0 business days)
Exceeded by 6.0 business days
Scheduled
Duration: 5.6 business days (threshold: 2.0 business days)
Exceeded by 3.6 business days
Scheduled
Duration: 30.4 business days (threshold: 2.0 business days)
Exceeded by 28.4 business days
Closed
Duration: 4.2 business days (threshold: 1.0 business days)
Exceeded by 3.2 business days
Billing Review
Duration: 3.0 business days (threshold: 2.0 business days)
Exceeded by 1.0 business days

🔗 Related Artifacts

📞
Case 00555172
Closed

ℹ️ Work Order Details

Status
Canceled
Priority
PSM
Type
Inspection
Branch
Edge
Technician
David Cavaco
Scheduled
N/A
Created
Dec 31, 10:31 AM
Invoice #
N/A

Details