Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01329301 ↗ ServiceMax

Conviva Care Solutions (Humana) • Inspection • PSM

📍 Conviva - Portland — 107 Cedar Drive, Portland TX, 78374

Jan 5, 2026 → Mar 10, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (26 biz days late)
Active: 45 biz days
🕐 Clock stopped: Completed (Mar 11, 2026)
▶ Clock Running
Status: Created
Jan 5 → Jan 5, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 5 → Jan 5, 2026
0 business days (counted)
Running total: 0 of ? biz days used
5d
▶ Clock Running
Status: Assigned
Jan 5 → Jan 12, 2026
5 business days (counted)
Running total: 5 of ? biz days used
39d
▶ Clock Running
Status: Scheduled
Jan 12 → Mar 10, 2026
39 business days (counted)
Running total: 44 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 10 → Mar 11, 2026
1 business day (counted)
Running total: 45 of ? biz days used
▶ Clock Running
Status: 04-Scheduled
Mar 11 → Mar 11, 2026
0 business days (counted)
Running total: 45 of ? biz days used
Created: Jan 5, 2026 Completed: Mar 11, 2026
Show SLA Clock Detail (6 periods)
Period Status Clock Biz Days Running Total
Jan 5 → Jan 5 Created ▶ Running 0 0
Jan 5 → Jan 5 Ready for Scheduling ▶ Running 0 0
Jan 5 → Jan 12 Assigned ▶ Running 5 5
Jan 12 → Mar 10 Scheduled ▶ Running 39 44
Mar 10 → Mar 11 Tech On Site ▶ Running 1 45
Mar 11 → Mar 11 04-Scheduled ▶ Running 0 45
Dispatch 0.0d
Coordinators 46.1d
Field Work 1.0d
Billing 0.0d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
46.1 days
Over SLA
Field Work
1.0 days
Over SLA
Billing
0.0 days
Created: Jan 5, 2026 Due: Mar 31, 2026 Completed: Mar 11, 2026 (20 days early)
📅
45.1 days Total Age
⏱️
40.0d in Scheduled Longest Stage
🔄
8 transitions Status Changes
⚠️
43.5d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
8 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00555795
eBiotrack - Automated New Inspection Created
Closed
Annual Equipment Electrical Safety Test And Calibration Service 56 Pcs https://www.ebiotrack.com/inspection.php?iid=32290
Priority
Standard
Origin
Email
Reason
New Case
Contact
Ashley Harrington
Owner
Kimberly Hardison
Created
Jan 4, 2026
Work Orders from this Case (1)
WO-01329301 (current) Invoiced
Inspection • Anthony Wirth
Created: Jan 5, 2026 • Closed: Mar 10, 2026
Completed with significant delays
Invoiced • 223 days old
🚨
Primary Delay 40.0 days stuck in "Scheduled"
⏱️
Total Delay 43.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.1d / 1.0d SLA
Assigned
6.0d / 0.5d SLA
Scheduled
40.0d / 2.0d SLA
Tech On Site
1.0d / 1.0d SLA
04-Scheduled
0.0d
Closed
1.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

1/12 KKelch called Ashley to schedule for 3/10 between 9 and 11 am. Customer confirmed. 

🔧 Work Performed
Upon arriving on-site, I conducted a thorough inspection of the equipment and identified several vital units with disconnected power adapters, which I promptly reinstalled and secured. I expanded the scope of the service by adding and inspecting additional units to ensure comprehensive coverage. Although the workflow was occasionally delayed due to occupied rooms, I successfully completed all inspections once the areas became accessible.
🔍 Technician Findings
A few units had lose fasteners, EKG Unit had the paper added to the unit. They were using paper for 250 and they needed paper for 150.
⚠️ Problem Description
Annual Equipment Electrical Safety Test And Calibration Service 56 Pcs https://www.ebiotrack.com/inspection.php?iid=32290

Timeline

📞
Case Linked Jan 4, 6:01 AM
Case Number: 00555795
Subject: eBiotrack - Automated New Inspection Created
Status: Closed
1.0 business days
📋
2 Work Order Created Jan 5, 10:25 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Kimberly Hardison
From: Entered
To: Ready for Scheduling
Duration in Previous: 0m
👷
2 Technician Assigned Jan 5, 11:02 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling
To: Assigned
Duration in Previous: 36m
⚠️ 6.0 business days
🗓️
2 Status: Scheduled Jan 12, 10:53 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-03-10T14:00:00.000+0000
🚨 40.0 business days
🔧
Status: Tech On Site by Anthony Wirth Mar 10, 10:29 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 56d 22h
📋
Status: 04-Scheduled by Ben Saur Mar 10, 8:21 PM
From: Tech On Site
To: 04-Scheduled
Duration in Previous: 9h 51m
🚗
3 7x Travel Added Mar 10, 8:39 PM
7x Travel Added → Expenses Added → Status: Completed
💵
Expenses Added
Type: Expenses
Status: Open
Qty: 1
✔️
Status: Completed by Anthony Wirth
From: 04-Scheduled, Completed
To: Completed, Closed
Duration in Previous: 19m, 0m
📄
2 Status: Ready to Bill Mar 11, 11:22 AM
Status: Ready to Bill → Status: Invoiced
💰
Status: Invoiced by Diane Patton
From: Invoice Pending
To: Invoiced
Duration in Previous: 0m
3.7 business days
🧾
Invoice Created Mar 16, 5:43 AM
Invoice Number: SM-256166

Bottlenecks

Assigned
Duration: 6.0 business days (threshold: 4.0 business hours)
Exceeded by 5.5 business days
Scheduled
Duration: 40.0 business days (threshold: 2.0 business days)
Exceeded by 38.0 business days
Tech On Site
Duration: 1.0 business days (threshold: 1.0 business days)
Exceeded by 0.4 business hours

🔗 Related Artifacts

📞
Case 00555795
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Inspection
Branch
Edge
Technician
Anthony Wirth
Scheduled
Mar 10, 10:00 AM
Created
Jan 5, 10:25 AM
Invoice #
SM-256166

Work Details (8)

Name Type Status Qty Amount Date
WL-03138342 Travel Open 168 - Mar 10, 8:39 PM
WL-03138336 Parts Open 1 $89.10 Mar 10, 8:39 PM
WL-03138337 Parts Open 1 $98.21 Mar 10, 8:39 PM
WL-03138338 Labor Open 3 $0.00 Mar 10, 8:39 PM
WL-03138339 Labor Open 7.5 $1,292.00 Mar 10, 8:39 PM
WL-03138340 Labor Open 3 $0.00 Mar 10, 8:39 PM
WL-03138341 Travel Open 171 - Mar 10, 8:39 PM
WL-03138346 Expenses Open 1 $0.00 Mar 10, 8:40 PM

Details