WO-01337267 ↗ ServiceMax

Advanced Dermatology and Cosmetic Surgery (ADCS) • Inspection • PSM

📍 ADCS - 392 - Greeley — 7251 W 20th St, Bldg E, Greeley CO, 80634

Jan 12, 2026 → Mar 30, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (40 biz days late)
Active: 54 biz days
🕐 Clock stopped: Tech Off Site (Mar 31, 2026)
▶ Clock Running
Status: Created
Jan 12 → Jan 12, 2026
0 business days (counted)
Running total: 0 of ? biz days used
38d
▶ Clock Running
Status: Ready for Scheduling
Jan 12 → Mar 9, 2026
38 business days (counted)
Running total: 38 of ? biz days used
5d
▶ Clock Running
Status: Assigned
Mar 9 → Mar 16, 2026
5 business days (counted)
Running total: 43 of ? biz days used
▶ Clock Running
Status: Entered
Mar 16 → Mar 16, 2026
0 business days (counted)
Running total: 43 of ? biz days used
7d
▶ Clock Running
Status: On Hold
Mar 16 → Mar 25, 2026
7 business days (counted)
Running total: 50 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Mar 25 → Mar 25, 2026
0 business days (counted)
Running total: 50 of ? biz days used
▶ Clock Running
Status: Assigned
Mar 25 → Mar 27, 2026
2 business days (counted)
Running total: 52 of ? biz days used
▶ Clock Running
Status: Scheduled
Mar 27 → Mar 30, 2026
1 business day (counted)
Running total: 53 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 30 → Mar 31, 2026
1 business day (counted)
Running total: 54 of ? biz days used
Created: Jan 12, 2026 Tech Off Site: Mar 31, 2026
Show SLA Clock Detail (9 periods)
Period Status Clock Biz Days Running Total
Jan 12 → Jan 12 Created ▶ Running 0 0
Jan 12 → Mar 9 Ready for Scheduling ▶ Running 38 38
Mar 9 → Mar 16 Assigned ▶ Running 5 43
Mar 16 → Mar 16 Entered ▶ Running 0 43
Mar 16 → Mar 25 On Hold ▶ Running 7 50
Mar 25 → Mar 25 Ready for Scheduling ▶ Running 0 50
Mar 25 → Mar 27 Assigned ▶ Running 2 52
Mar 27 → Mar 30 Scheduled ▶ Running 1 53
Mar 30 → Mar 31 Tech On Site ▶ Running 1 54
Dispatch 0.0d
Holding 7.7d (excluded)
Coordinators 49.9d
Field Work 1.4d
✗ SLA Missed
Dispatch
0.0 days
Holding (excluded from total)
7.7 days
Coordinators
49.9 days
Over SLA
Field Work
1.4 days
Over SLA
Created: Jan 12, 2026 Due: Mar 31, 2026 Completed: Mar 31, 2026 (on time)
📅
54.4 days Total Age
⏱️
39.0d in Ready for Scheduling Longest Stage
🔄
11 transitions Status Changes
⚠️
46.2d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
6 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00557851
eBiotrack - Automated New Inspection Created
Closed
Inspection: Annual Equipment Electrical Safety Test And Calibration Service 20 pcs https://www.ebiotrack.com/inspection.php?iid=32408
Priority
Standard
Origin
Email
Reason
New Case
Contact
Kelsey Daniels
Owner
Jessica Sells
Created
Jan 11, 2026
Work Orders from this Case (1)
WO-01337267 (current) Invoiced
Inspection • Brandon Rodriguez
Created: Jan 12, 2026 • Closed: Mar 30, 2026
Completed with significant delays
Invoiced • 216 days old
🚨
Primary Delay 39.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay 46.2 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
39.1d / 1.0d SLA
Assigned
8.8d / 0.5d SLA
On Hold
7.7d
Scheduled
2.0d / 2.0d SLA
Tech On Site
1.4d / 1.0d SLA
Tech Off Site
0.0d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

3/27 KKelch Trish called me back to schedule for 3/30 between 9 and 11 am. Customer confirmed. 

3/26 KKelch called Trish to schedule for 3/27 between 9 and 11 am. Left info. 

3/25 SBerry: POC updated

3/16 KKelch called Kelsey to schedule for 3/24 between 9 and 11 am. She let me know that she no longer works for ADCS. Placed on hold and sent chatter to ASM.

3/11 KKelch sent Kelsey an email for scheduling

3/9 KKelch called Kelsey to schedule for 3/10 between 11:30 and 1:30 pm. Left VM.

🔧 Work Performed
03/30/26 BR: Inspection completed
🔍 Technician Findings
03/30/26 BR: Arrived onsite for inspection.
⚠️ Problem Description
Inspection: Annual Equipment Electrical Safety Test And Calibration Service 20 pcs https://www.ebiotrack.com/inspection.php?iid=32408

Timeline

📞
Case Linked Jan 11, 6:00 AM
Case Number: 00557851
Subject: eBiotrack - Automated New Inspection Created
Status: Closed
1.0 business days
📋
2 Work Order Created Jan 12, 11:03 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Jessica Sells
From: Entered
To: Ready for Scheduling
Duration in Previous: 0m
🚨 39.0 business days
👷
2 Technician Assigned Mar 9, 8:44 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling
To: Assigned
Duration in Previous: 55d 20h
⚠️ 6.0 business days
🆕
Status: Entered by Kaitlyn Kelch Mar 16, 2:13 PM
From: Assigned, Entered
To: Entered, On Hold
Duration in Previous: 7d 5h, 0m
⚠️ 8.0 business days
📅
Status: Ready for Scheduling by Scott Berry Mar 25, 12:26 PM
From: On Hold
To: Ready for Scheduling
Duration in Previous: 8d 22h
👷
2 Technician Assigned Mar 25, 1:32 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling
To: Assigned
Duration in Previous: 1h 5m
3.0 business days
🗓️
2 Status: Scheduled Mar 27, 11:22 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-03-30T13:00:00.000+0000
2.0 business days
🔧
Status: Tech On Site by Brandon Rodriguez Mar 30, 10:59 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 2d 23h
🚗
2 Status: Tech Off Site Mar 30, 11:15 PM
Status: Tech Off Site → Status: Completed
✔️
Status: Completed by Brandon Rodriguez
From: Tech Off Site
To: Completed
Duration in Previous: 1m
⏱️
3 3x Labor Added Mar 30, 11:26 PM
3x Labor Added → 2x Travel Added → Status: Closed
🚗
2x Travel Added
Type: Travel
Status: Open
Qty: 25, 54
🏁
Status: Closed by Brandon Rodriguez
From: Completed
To: Closed
Duration in Previous: 12m
🔩
2 Parts Added Mar 31, 10:08 AM
Parts Added → Status: Ready to Bill
📄
Status: Ready to Bill by Diane Patton
From: Closed, Ready to Bill, Invoice Pending
To: Ready to Bill, Invoice Pending, Invoiced
Duration in Previous: 10h 38m, 0m
4.3 business days
🧾
Invoice Created Apr 6, 2:44 AM
Invoice Number: SM-257863

Bottlenecks

Ready for Scheduling
Duration: 39.0 business days (threshold: 1.0 business days)
Exceeded by 38.0 business days
Assigned
Duration: 6.0 business days (threshold: 4.0 business hours)
Exceeded by 5.5 business days
Assigned
Duration: 2.8 business days (threshold: 4.0 business hours)
Exceeded by 2.3 business days
Tech On Site
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.3 business hours

🔗 Related Artifacts

📞
Case 00557851
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Inspection
Branch
Edge
Technician
Brandon Rodriguez
Scheduled
Mar 30, 9:00 AM
Created
Jan 12, 11:03 AM
Invoice #
SM-257863

Work Details (6)

Name Type Status Qty Amount Date
WL-03166327 Labor Open 1.3333333333333 $0.00 Mar 30, 11:26 PM
WL-03166328 Labor Open 2 $3,100.00 Mar 30, 11:26 PM
WL-03166329 Labor Open 0.75 $0.00 Mar 30, 11:26 PM
WL-03166337 Travel Open 25 - Mar 30, 11:29 PM
WL-03166338 Travel Open 54 - Mar 30, 11:29 PM
WL-03166554 Parts Open 1 $297.00 Mar 31, 10:08 AM

Details