Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01337529 ↗ ServiceMax

Centurion of Kansas • Inspection • PSM

📍 Hutchinson Correctional Facility - East Unit — 400 South Halstead, Hutchinson KS, 67501

Jan 13, 2026 → Mar 24, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (35 biz days late)
Active: 48 biz days
🕐 Clock stopped: Completed (Mar 24, 2026)
▶ Clock Running
Status: Created
Jan 13 → Jan 13, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 13 → Jan 15, 2026
2 business days (counted)
Running total: 2 of ? biz days used
18d
▶ Clock Running
Status: Assigned
Jan 15 → Feb 11, 2026
18 business days (counted)
Running total: 20 of ? biz days used
12d
▶ Clock Running
Status: Scheduled
Feb 11 → Mar 2, 2026
12 business days (counted)
Running total: 32 of ? biz days used
▶ Clock Running
Status: Reschedule
Mar 2 → Mar 3, 2026
1 business day (counted)
Running total: 33 of ? biz days used
15d
▶ Clock Running
Status: Scheduled
Mar 3 → Mar 24, 2026
15 business days (counted)
Running total: 48 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 24 → Mar 24, 2026
0 business days (counted)
Running total: 48 of ? biz days used
Created: Jan 13, 2026 Completed: Mar 24, 2026
Show SLA Clock Detail (7 periods)
Period Status Clock Biz Days Running Total
Jan 13 → Jan 13 Created ▶ Running 0 0
Jan 13 → Jan 15 Ready for Scheduling ▶ Running 2 2
Jan 15 → Feb 11 Assigned ▶ Running 18 20
Feb 11 → Mar 2 Scheduled ▶ Running 12 32
Mar 2 → Mar 3 Reschedule ▶ Running 1 33
Mar 3 → Mar 24 Scheduled ▶ Running 15 48
Mar 24 → Mar 24 Tech On Site ▶ Running 0 48
Dispatch 0.0d
Coordinators 51.9d
Field Work 0.7d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
51.9 days
Over SLA
Field Work
0.7 days
Created: Jan 13, 2026 Due: Mar 31, 2026 Completed: Mar 24, 2026 (7 days early)
📅
48.9 days Total Age
⏱️
19.0d in Assigned Longest Stage
🔄
8 transitions Status Changes
⚠️
44.7d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
6 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00558340
eBiotrack - Automated New Inspection Created
Closed
Inspection: Annual Equipment Electrical Safety Test And Calibration Service 23 pcs https://www.ebiotrack.com/inspection.php?iid=32441
Priority
Standard
Origin
Email
Reason
New Case
Contact
Ashley Childers
Owner
Jessica Sells
Created
Jan 13, 2026
Work Orders from this Case (1)
WO-01337529 (current) Invoiced
Inspection • Thomas J Langenberg Jr
Created: Jan 13, 2026 • Closed: Mar 24, 2026
Completed with significant delays
Invoiced • 215 days old
🚨
Primary Delay 19.0 days stuck in "Assigned"
⏱️
Total Delay 44.7 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
2.9d / 1.0d SLA
Assigned
19.0d / 0.5d SLA
Scheduled
28.0d / 2.0d SLA
Reschedule
2.0d / 2.0d SLA
Tech On Site
0.7d / 1.0d SLA
Closed
1.4d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

3/3 KKelch scheduled per logged email from Ashley. Email logged on WO-01337529

3/2 KKelch called Ashley to reschedule for 3/18 between 9 and 11 am as the technician needs new equipment stickers. Left VM, placed in R/S pending call back. Call logged on WO-01337529

2/11 KKelch Ashley called me back to schedule the east unit for 3/4 between 9 and 11 am and 3/4 between 12 and 2 pm and 3/6 between 9 and 11 am for the central unit. Customer confirmed. Call logged on WO-01337529. Adam will meet you at the gate for the east unit.

2/2 KKelch called Ashley to schedule the east unit for 3/4 between 9 and 11 am and the south unit for 3/6 between 9 and 11 am. Left VM. Call logged on WO-01337529

1/26 KKelch called Ashley to schedule the east unit for 3/4 between 9 and 11 am and south unit for 3/6 between 9 and 11 am. Left VM. Call logged on WO-01337529

🔧 Work Performed
performed the annual inspection on 26 pieces of equipment.
🔍 Technician Findings
annual inspection due
⚠️ Problem Description
Inspection: Annual Equipment Electrical Safety Test And Calibration Service 23 pcs https://www.ebiotrack.com/inspection.php?iid=32441

Timeline

📞
Case Linked Jan 13, 6:00 AM
Case Number: 00558340
Subject: eBiotrack - Automated New Inspection Created
Status: Closed
📋
2 Work Order Created Jan 13, 11:45 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Jessica Sells
From: Entered
To: Ready for Scheduling
Duration in Previous: 0m
3.0 business days
👷
2 Technician Assigned Jan 15, 9:11 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling
To: Assigned
Duration in Previous: 1d 21h
🚨 19.0 business days
🗓️
2 Status: Scheduled Feb 11, 1:37 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-03-04T15:00:00.000+0000
🚨 13.0 business days
🔄
Status: Reschedule by Kaitlyn Kelch Mar 2, 10:10 AM
From: Scheduled
To: Reschedule
Duration in Previous: 18d 20h
2.0 business days
🗓️
2 Status: Scheduled Mar 3, 4:40 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-03-24T14:00:00.000+0000
🚨 15.9 business days
🔧
Status: Tech On Site by Thomas Langenberg Mar 24, 11:33 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 20d 17h
⏱️
2 6x Labor Added Mar 24, 5:10 PM
6x Labor Added → Status: Completed
✔️
Status: Completed by Thomas Langenberg
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 5h 37m, 0m
📄
Status: Ready to Bill by Diane Patton Mar 25, 2:05 PM
From: Closed, Ready to Bill, Invoice Pending
To: Ready to Bill, Invoice Pending, Invoiced
Duration in Previous: 20h 55m, 0m
3.0 business days
🧾
Invoice Created Mar 28, 12:05 PM
Invoice Number: SM-257451

Bottlenecks

Ready for Scheduling
Duration: 2.9 business days (threshold: 1.0 business days)
Exceeded by 1.9 business days
Assigned
Duration: 19.0 business days (threshold: 4.0 business hours)
Exceeded by 18.5 business days
Scheduled
Duration: 12.7 business days (threshold: 2.0 business days)
Exceeded by 10.7 business days
Scheduled
Duration: 15.3 business days (threshold: 2.0 business days)
Exceeded by 13.3 business days
Closed
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 2.8 business hours

🔗 Related Artifacts

📞
Case 00558340
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Inspection
Branch
N/A
Technician
Thomas J Langenberg Jr
Scheduled
Mar 24, 10:00 AM
Created
Jan 13, 11:45 AM
Invoice #
SM-257451

Work Details (6)

Name Type Status Qty Amount Date
WL-03157315 Labor Open 3.75 $0.00 Mar 24, 5:10 PM
WL-03157316 Labor Open 1.8333333333333 $0.00 Mar 24, 5:10 PM
WL-03157317 Labor Open 3.1666666666667 $0.00 Mar 24, 5:10 PM
WL-03157318 Labor Open 0.53333333333333 $1,195.00 Mar 24, 5:10 PM
WL-03157319 Travel Open 193 - Mar 24, 5:10 PM
WL-03157320 Travel Open 193 - Mar 24, 5:10 PM

Details