Primary Delay21.9 days stuck in "Ready for Scheduling"
⏱️
Total Delay44.9 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
21.9d / 1.0d SLA
Assigned
14.6d / 0.5d SLA
Scheduled
11.0d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Closed
1.9d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
3/9 MOwens Angel replied back that any day works. Sent reply to schedule the inspection visit for Mon. 3/23 with eta between 9-10am.
3/6 MOwens Sent email to Angel Allen about good dates to schedule the inspection visit during March.
🔧Work Performed
3-23-26 CTM - Performed Annual Inspection on all medical equipment located . Total of 30 pieces inspected . ALL PASS . Notified POC Angela Allen of findings and completion .
🔍Technician Findings
3-23-26 CTM - Perform Annual Inspection on all medical equipment located . Notify POC Angela Allen of findings and completion .
⚠️Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
34 pieces
https://www.ebiotrack.com/inspection.php?iid=32492
From: mowens@emsar.com
To: angelallen@fastmed.com
Let's schedule the visit for Mon. 3/23 with eta between 9-10am.
ThanksMelissa OwensAccount Service CoordinatorEast Districtmowens@emsar.comwww.emsar.com803-791-1259
From: Angel Allen <angelallen@fastmed.com>Sent: Saturday, March 7, 2026 8:10 AMTo: Melissa Owens <mowens@emsar.com>Subject: Re: FastMed Henderson NC Annual Equipme