Primary Delay20.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay40.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
20.0d / 1.0d SLA
Assigned
10.6d / 0.5d SLA
Scheduled
12.0d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Closed
2.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
3/3 MOwens Sent reply back to Jeremy Stojakovich and Evan Kelly to confirm scheduling this location for 3/18 per their request for the inspection to be scheduled on any day during the week.
🔧Work Performed
performed an inspection and electrical testing on all Biomed equipment. I placed all equipment back into service and is ready for use.
🔍Technician Findings
I arrived on site to do an inspection on the BioMed equipment.
⚠️Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
27 pieces
https://www.ebiotrack.com/inspection.php?iid=32533
📧
Email
Completed Mar 3, 2026
3/3 MOwens Sent reply back to Jeremy Stojakovich and Evan Kelly to confirm scheduling this location for 3/18 per their request for the inspection to be scheduled on any day during the week.