Primary Delay20.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay42.4 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
20.0d / 1.0d SLA
Assigned
16.6d / 0.5d SLA
Scheduled
8.8d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Closed
1.6d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
3/11 MOwens Candi replied back that this date is good for her.
3/11 MOwens Replied back to email from Candi Holland asking about scheduling this location for 3/23 from 2-5pm
🔧Work Performed
3-23-26 CTM - Performed Annual Inspection on all medical equipment located . Total of 32 pieces inspected . TESTED ALL PASS . Notified POC Candice Holland of findings and completion .
🔍Technician Findings
3-23-26 CTM - Perform Annual Inspection on all medical equipment located . Notify POC Candice Holland of findings and completion .
⚠️Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
Equipment: 30
https://www.ebiotrack.com/inspection.php?iid=32543
📧
Email
Completed Mar 11, 2026
3/11 MOwens Candi replied back that this date is good for her.
📧
Email
Completed Mar 11, 2026
3/11 MOwens Replied back to email from Candi Holland asking about scheduling this location for 3/23 from 2-5pm