Primary Delay20.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay43.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
20.0d / 1.0d SLA
Assigned
10.6d / 0.5d SLA
Scheduled
15.0d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Closed
2.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
3/4 MOwens Sent FU email to Jeremy that this visit will change from 3/9 to 3/23.
3/3 MOwens Sent reply back to Jeremy Stojakovich and Evan Kelly to confirm scheduling this location for 3/9 per their request for the inspection to be scheduled on a Monday.
🔧Work Performed
performed an inspection and electrical testing on all Biomed equipment. I placed all equipment back into service and is ready for use.
🔍Technician Findings
I arrived on site to do an inspection on the BioMed equipment.
⚠️Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
41 pieces
https://www.ebiotrack.com/inspection.php?iid=32535
📧
Email:7 Springs Orthopedics Mt. Juliet
Completed Mar 4, 2026
From: mowens@emsar.com
To: jeremy.stojakovich@sportorthouc.com
Cc: evan.kelley@sportorthouc.com
Jeremy
I have a change for the schedule date for this location. Changing from 3/9 to 3/23 instead.
ThanksMelissa OwensAccount Service CoordinatorEast Districtmowens@emsar.comwww.emsar.com803-791-1259
📧
Email
Completed Mar 3, 2026
3/3 MOwens Sent reply back to Jeremy Stojakovich and Evan Kelly to confirm scheduling this location for 3/9 per their request for the inspection to be scheduled on a Monday.