Primary Delay44.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay49.6 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
44.0d / 1.0d SLA
Assigned
2.4d / 0.5d SLA
Scheduled
7.3d / 2.0d SLA
Tech On Site
0.8d / 1.0d SLA
Tech Off Site
0.0d / 2.0d SLA
Closed
1.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
3/25/26 AJinerson - Received call back from POC Diana ready to schedule now. Confirmed tech visit for Thurs. 4/2 with eta between 9am-11am.
POC Onsite: Sheila/Shayla
This is scheduled past SLA as tech is not available and filled up with other HCP March inspections/repairs.
3/23/26 AJinerson - Called Diana to schedule tech visit. No answer but left VM regarding scheduling service.
🔧Work Performed
04/02/2026 EBar.
I have carried out the annual inspection of the biomedical equipment, checking for proper functionality to verify that the readings fall within accepted parameters. Subsequently, the equipment was recorded in the inventory system after successfully passing the inspection.
🔍Technician Findings
04/02/2026 EBar.
Annual Biomedical Equipment inspection. All units must be added to EBT system.
⚠️Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
60 pieces
https://www.ebiotrack.com/inspection.php?iid=32538
📋
Inbound from +17864413337
Completed Mar 25, 2026
3/25/26 AJinerson - Received call back from POC Diana ready to schedule now. Confirmed tech visit for Thurs. 4/2 with eta between 9am-11am.
POC Onsite: Sheila/Shayla
This is scheduled past SLA as tech is not available and filled up with other HCP March inspections/repairs.
📋
Outbound to +17864413337
Completed Mar 23, 2026
3/23/26 AJinerson - Called Diana to schedule tech visit. No answer but left VM regarding scheduling service.