Primary Delay20.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay44.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
20.0d / 1.0d SLA
Assigned
19.6d / 0.5d SLA
Scheduled
7.0d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Closed
2.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
3/16 MOwens Erik replied back that Mon or Tues before noon work the best. Replied back to confirm scheduling the visit for Tues. 3/24 with arrival between 8-9am.
3/10 MOwens Sent email to Erik about good dates for scheduling the inspection during March.
🔧Work Performed
3-24-26 CTM - Performed Annual Inspection on all medical located . Total of 28 pieces of equipment inspected . ALL PASS . Notified POC Chloe Hennings of findings and completion .
🔍Technician Findings
3-24-26 CTM - Perform Annual Inspection on all medical located . Notify POC Chloe Hennings of findings and completion .
⚠️Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
24 Pcs
https://www.ebiotrack.com/inspection.php?iid=32559
📧
Email:Re: Cross Health Medical Group - Fidelity Durham, NC Annual Tagged Equipment Inspection
Completed Mar 16, 2026
From: mowens@emsar.com
To: erik.krievs@crossoverhealth.com
Erik
I can schedule the visit for My tech Chris Morning to go onsite Tues. 3/24 with arrival between 8-9am.
ThanksMelissa OwensAccount Service CoordinatorEast Districtmowens@emsar.comwww.emsar.com803-791-1259
From: Erik Krievs <erik.krievs@crossoverhealth.com>Sent: Monday, March 16, 2026 10:53 AMTo: Melissa Owens <mo
📧
Email:Cross Health Medical Group - Fidelity Durham, NC Annual Tagged Equipment Inspection
Completed Mar 10, 2026
From: mowens@emsar.com
To: facilities@crossoverhealth.com
Cc: erik.krievs@crossoverhealth.com
Erik
The annual inspection on the tagged medical equipment at this location is due by 3/31. What days work the best to schedule the visit?
ThanksMelissa OwensAccount Service CoordinatorEast Districtmowens@emsar.comwww.emsar.com803-791-1259
📅
WO-01338530 - Inspection - DD: 3/31/2026 - - Durham - Cross Health Medical Group - Fidelity Durham, NC
Mar 24, 2026 8:00am – 10:30am
Work Order: WO-01338530
Account: Crossover Health Management Services
Customer Case Number:
Location: Cross Health Medical Group - Fidelity Durham, NC
Address: 100 New Millennium Way (First Floor South Wing), Durham, NC 27709
Manufacturer:
Model #:
Serial #:
Contact Name: Practice Manager
Contac
Timeline
📞
Case Linked Jan 20, 6:01 AM
Case Number:00560335
Subject:eBiotrack - Automated New Inspection Created
Status:Closed
📋
▶
2
Work Order Created Jan 20, 8:37 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Kimberly Hardison
From:Entered
To:Ready for Scheduling
Duration in Previous:1m
🚨20.0 business days
👷
▶
2
Technician Assigned Feb 17, 2:22 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Melissa Owens
From:Ready for Scheduling
To:Assigned
Duration in Previous:28d 5h
🚨20.0 business days
🗓️
▶
2
Status: Scheduled Mar 16, 11:19 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Melissa Owens
Scheduled For:2026-03-24T12:00:00.000+0000
⚠️7.0 business days
🔧
Status: Tech On Site by Christopher MorningMar 24, 8:04 AM
From:Scheduled
To:Tech On Site
Duration in Previous:7d 20h
⏱️
2x Labor Added Mar 24, 8:09 AM
Type:Labor, Travel
Status:Open
Qty:1, 34
⏱️
▶
2
Labor Added Mar 24, 9:53 AM
Labor Added → Status: Completed
✔️
Status: Completed by Christopher Morning
From:Tech On Site, Completed
To:Completed, Closed
Duration in Previous:1h 49m, 0m
⏳2.0 business days
📄
▶
2
Status: Ready to Bill Mar 25, 10:53 AM
Status: Ready to Bill → Status: Invoiced
💰
Status: Invoiced by Diane Patton
From:Invoice Pending
To:Invoiced
Duration in Previous:1m
⏳3.0 business days
🧾
Invoice Created Mar 27, 6:45 PM
Invoice Number:SM-257421
Bottlenecks
Ready for Scheduling
Duration: 20.0 business days (threshold: 1.0 business days)
Exceeded by 19.0 business days
Assigned
Duration: 19.6 business days (threshold: 4.0 business hours)
Exceeded by 19.1 business days
Scheduled
Duration: 7.0 business days (threshold: 2.0 business days)
Exceeded by 5.0 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)