4/6 MOwens Tech did not get to inspect all the equipment. Returning on 4/10 between 9-12 to finish the inspection.
3/25 MOwens Sent email to Ralph confirming the schedule date for this location for 4/2 between 9-5pm
3/5 MOwens Ralph replied back to the email that he is still waiting for the PO approval to schedule the inspection visit at this location.
🔧Work Performed
Performed annual equipment inspection ( 152 pcs ) Worked with staff to find all equipment.
🔍Technician Findings
Checked in with staff for equipment inspection
⚠️Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
Equipment: 126
https://www.ebiotrack.com/inspection.php?iid=32624
📧
Email:Centerville Washington PA Clinic Inspection
Completed Apr 6, 2026
From: mowens@emsar.com
To: rcavanaugh@centervilleclinics.com
Ralph
Pero was not able to finish the inspection at this location last Thurs. He will return this Friday morning between 9-12 to complete the inspeciton.
ThanksMelissa OwensAccount Service CoordinatorEast Districtmowens@emsar.comwww.emsar.com803-791-1259
From: mowens@emsar.com
To: rcavanaugh@centervilleclinics.com
Cc: maintenance@centervilleclinics.com
Ralph
Here is the schedule for each of the locations.
1 Day 4/2 and 4/3 if needed Tech Pero Popovic
Washington PA 126 pieces - 8-5
Same Day 4/1 Tech Pero Popovic
Bentleyville PA 45 pieces - 8-5 (except Wed 11-7)
Donora PA 37 pieces - 8-5 (except Monday 11-7)
Same Day 3/31 Tech Eric Colon
Charleroi PA 61 pieces - 8-5 (except Monday 11-7)
C
📅
WO-01339306 - Inspection - DD: 3/31/2026 - - Washington - Centerville Clinics - Washington Family Doctors
Apr 14, 2026 10:00am – 3:00pm
Work Order: WO-01339306
Account: Centerville Clinics, Inc.
Customer Case Number:
Location: Centerville Clinics - Washington Family Doctors
Address: 37 Highland Ave, Washington, PA 15301
Manufacturer:
Model #:
Serial #:
Contact Name: Martin Nigro
Contact Phone:
Contact Email: maintenan
Timeline
📞
Case Linked Jan 22, 6:02 AM
Case Number:00561234
Subject:eBiotrack - Automated New Inspection Created
Status:Closed
📋
▶
2
Work Order Created Jan 22, 10:44 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Shelby Robinson
From:Entered
To:Ready for Scheduling
Duration in Previous:0m
🚨19.0 business days
👷
▶
2
Technician Assigned Feb 18, 9:12 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Melissa Owens
From:Ready for Scheduling
To:Assigned
Duration in Previous:26d 22h
🚨26.0 business days
🗓️
▶
2
Status: Scheduled Mar 25, 2:09 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Melissa Owens
Scheduled For:2026-04-02T13:00:00.000+0000
⚠️7.0 business days
🔧
Status: Tech On Site by Pero PopovicApr 2, 9:19 AM