Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01339309 ↗ ServiceMax

Centerville Clinics, Inc. • Inspection • PSM

📍 Centerville Clinics - Carmichaels Clinic — 601 W George St, Carmichaels PA, 15320

Jan 22, 2026 → Apr 3, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (42 biz days late)
Active: 49 biz days
🕐 Clock stopped: Completed (Apr 2, 2026)
▶ Clock Running
Status: Created
Jan 22 → Jan 22, 2026
0 business days (counted)
Running total: 0 of ? biz days used
18d
▶ Clock Running
Status: Ready for Scheduling
Jan 22 → Feb 18, 2026
18 business days (counted)
Running total: 18 of ? biz days used
25d
▶ Clock Running
Status: Assigned
Feb 18 → Mar 25, 2026
25 business days (counted)
Running total: 43 of ? biz days used
6d
▶ Clock Running
Status: Scheduled
Mar 25 → Apr 2, 2026
6 business days (counted)
Running total: 49 of ? biz days used
▶ Clock Running
Status: Tech On Site
Apr 2 → Apr 2, 2026
0 business days (counted)
Running total: 49 of ? biz days used
Created: Jan 22, 2026 Completed: Apr 2, 2026
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Jan 22 → Jan 22 Created ▶ Running 0 0
Jan 22 → Feb 18 Ready for Scheduling ▶ Running 18 18
Feb 18 → Mar 25 Assigned ▶ Running 25 43
Mar 25 → Apr 2 Scheduled ▶ Running 6 49
Apr 2 → Apr 2 Tech On Site ▶ Running 0 49
Dispatch 0.0d
Coordinators 52.0d
Field Work 1.5d
Billing 2.3d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
52.0 days
Over SLA
Field Work
1.5 days
Over SLA
Billing
2.3 days
Over SLA
Created: Jan 22, 2026 Due: Mar 31, 2026 Completed: Apr 3, 2026 (2 days late)
📅
51.0 days Total Age
⏱️
26.0d in Assigned Longest Stage
🔄
9 transitions Status Changes
⚠️
50.5d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
8 lines Work Details
🏠
2 visits On-Site Trips
👤
Self-Scheduled Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Eric Colon — scheduling delays attributed to technician, not coordinators
Visit 1 Apr 2, 2026
Visit 2 Apr 3, 2026

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00561226
eBiotrack - Automated New Inspection Created
Closed
Annual Equipment Electrical Safety Test And Calibration Service 55 Pcs https://www.ebiotrack.com/inspection.php?iid=32617
Priority
Standard
Origin
Email
Reason
New Case
Contact
Martin Nigro
Owner
Kimberly Hardison
Created
Jan 22, 2026
Work Orders from this Case (1)
WO-01339309 (current) Invoiced
Inspection • Eric Colon
Created: Jan 22, 2026 • Closed: Apr 3, 2026
Completed with significant delays
Invoiced • 206 days old
🚨
Primary Delay 26.0 days stuck in "Assigned"
⏱️
Total Delay 50.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
19.0d / 1.0d SLA
Assigned
26.0d / 0.5d SLA
Scheduled
7.0d / 2.0d SLA
Tech On Site
0.0d / 1.0d SLA
Completed
1.5d / 1.0d SLA
Closed
2.1d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA
Invoice Pending
2.3d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

4/2/26- EColon- Need to keep open to put travel home.


3/25 MOwens Sent email back to Ralph to confirm scheduling this location for 4/2 between 1-5pm

3/5 MOwens Ralph replied back to the email that he is still waiting for the PO approval to schedule the inspection visit at this location.

🔧 Work Performed
4/2/26- EColon- Arrived onsite, checked in with front desk. Completed 57 inspections, archived 6 items. Inspection completed
🔍 Technician Findings
annual inspection
⚠️ Problem Description
Annual Equipment Electrical Safety Test And Calibration Service 55 Pcs https://www.ebiotrack.com/inspection.php?iid=32617

Timeline

📞
Case Linked Jan 22, 6:01 AM
Case Number: 00561226
Subject: eBiotrack - Automated New Inspection Created
Status: Closed
📋
2 Work Order Created Jan 22, 11:06 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Kimberly Hardison
From: Entered
To: Ready for Scheduling
Duration in Previous: 0m
🚨 19.0 business days
👷
2 Technician Assigned Feb 18, 9:07 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Melissa Owens
From: Ready for Scheduling
To: Assigned
Duration in Previous: 26d 22h
🚨 26.0 business days
👷
3 Technician Assigned Mar 25, 11:59 AM
Technician Assigned → Status: Scheduled → Dispatch Scheduled
🗓️
Status: Scheduled by Melissa Owens
From: Assigned
To: Scheduled
Duration in Previous: 35d 1h
📅
Dispatch Scheduled by Melissa Owens
Scheduled For: 2026-04-02T17:00:00.000+0000
⚠️ 7.0 business days
🚗
Travel Added Apr 2, 11:11 AM
Type: Travel
Status: Open
Qty: 12
⏱️
Labor Added Apr 2, 1:18 PM
Type: Labor
Status: Open
Qty: 0.5
⏱️
3x Labor Added Apr 2, 3:15 PM
Type: Labor, Travel
Status: Open
Qty: 2.5, 0.5, 16
🔧
Status: Tech On Site by Eric Colon Apr 2, 3:40 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 8d 3h
✔️
Status: Completed by Eric Colon Apr 2, 3:46 PM
From: Tech On Site
To: Completed
Duration in Previous: 6m
2.0 business days
⏱️
2 3x Labor Added Apr 3, 6:59 PM
3x Labor Added → Status: Closed
🏁
Status: Closed by Eric Colon
From: Completed
To: Closed
Duration in Previous: 1d 3h
2.6 business days
📄
2 Status: Ready to Bill Apr 7, 5:23 PM
Status: Ready to Bill → Status: Invoice Pending
📨
Status: Invoice Pending by Diane Patton
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 1m
2.8 business days
💰
Status: Invoiced by Diane Patton Apr 9, 11:47 AM
From: Invoice Pending
To: Invoiced
Duration in Previous: 1d 18h
⚠️ 5.0 business days
🧾
Invoice Created Apr 15, 11:45 AM
Invoice Number: SM-258653

Bottlenecks

Ready for Scheduling
Duration: 19.0 business days (threshold: 1.0 business days)
Exceeded by 18.0 business days
Assigned
Duration: 26.0 business days (threshold: 4.0 business hours)
Exceeded by 25.5 business days
Scheduled
Duration: 7.0 business days (threshold: 2.0 business days)
Exceeded by 5.0 business days
Completed
Duration: 1.5 business days (threshold: 1.0 business days)
Exceeded by 4.2 business hours
Closed
Duration: 2.1 business days (threshold: 1.0 business days)
Exceeded by 1.1 business days
Invoice Pending
Duration: 2.3 business days (threshold: 2.0 business days)
Exceeded by 2.6 business hours

🔗 Related Artifacts

📞
Case 00561226
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Inspection
Branch
Edge
Technician
Eric Colon
Scheduled
Apr 2, 1:00 PM
Created
Jan 22, 11:06 AM
Invoice #
SM-258653

Work Details (8)

Name Type Status Qty Amount Date
WL-03170373 Travel Open 12 - Apr 2, 11:11 AM
WL-03170608 Labor Open 0.5 $0.00 Apr 2, 1:18 PM
WL-03170929 Labor Open 2.5 $1,166.25 Apr 2, 3:15 PM
WL-03170930 Labor Open 0.5 $0.00 Apr 2, 3:15 PM
WL-03170931 Travel Open 16 - Apr 2, 3:15 PM
WL-03173226 Labor Open 9 $0.00 Apr 3, 6:59 PM
WL-03173227 Travel Open 493 - Apr 3, 6:59 PM
WL-03173228 Expenses Open 1 $0.00 Apr 3, 6:59 PM

Details