Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01339330 ↗ ServiceMax

AGILENT TECHNOLOGIES (VPD-FIELD) • Repair/PM • PSM

📍 Reotemp Instrument Corp — 13770 Hollister Rd, HOUSTON TX, 77086

Jan 22, 2026 → Jan 29, 2026

✅ Completed
PSM Last business day of January 2026
Target: Jan 30, 2026
🕐 Clock stopped: Completed (Jan 30)
⏸ 5d excluded (parts wait + holding)
✓ SLA Met
Dispatch 0.0d
Material Management 3.9d
Coordinators 2.8d
Field Work 1.2d
Billing 18.6d
✓ SLA Met
Dispatch
0.0 days
Material Management
3.9 days
Over SLA
Coordinators
2.8 days
Over SLA
Field Work
1.2 days
Over SLA
Billing
18.6 days
Over SLA
Created: Jan 22, 2026 Due: Feb 24, 2026 Completed: Jan 30, 2026 (25 days early)
📅
6.3 days Total Age
⏱️
9.0d in Invoice Pending Longest Stage
🔄
12 transitions Status Changes
⚠️
15.7d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
9 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00561246
6008399099
Closed
Parts Prediction 01/21/2026 14:18:05 WF-BATCH Agent: PIERCEB Timestamp: 2026-01-21 13:16:21 670029096 VSFLDHIS VSFLDCL VSFLDOV 695409005 ____________________ Note 01/21/2026 14:18:05 WF-BATCH Agent: PIERCEB Timestamp: 2026-01-21 13:16:21 Once the quotation has been accepted, please create a service order and assign it to the service employee group 98004236. Salesperson - Sean O’Brien; sean.obrien@agilent.com; Mobile: 281-352-5334. It does not pass calibration. It give an error of "Gain too High".
Priority
Standard
Origin
Email
Reason
New Case
Contact
Jake Torres
Owner
Leona Coonrod
Created
Jan 22, 2026
Work Orders from this Case (1)
WO-01339330 (current) Invoiced
Repair/PM • Curtis Sprague
Created: Jan 22, 2026 • Closed: Jan 29, 2026
Completed with significant delays
Invoiced • 112 days old
🚨
Primary Delay 9.0 days stuck in "Invoice Pending"
⏱️
Total Delay 15.7 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Awaiting Parts
3.9d / 3.0d SLA
Ready for Scheduling
0.0d / 1.0d SLA
Assigned
1.2d / 0.5d SLA
Scheduled
1.6d / 2.0d SLA
Tech On Site
1.2d / 1.0d SLA
Closed
4.0d / 1.0d SLA
WO Correction Needed
1.7d
Billing Review
3.3d / 2.0d SLA
Ready to Bill
4.5d / 1.0d SLA
Invoice Pending
9.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

1/28 KKelch called Jake back to schedule for tomorrow between 9 and 11 am. Customer confirmed. 

1/28 KKelch called Jake to schedule for tomorrow between 9 and 11 am. Left VM. 

1/28 KKelch called Jake to schedule for tomorrow between 9 and 11 am. Left VM. 

1/27 KKelch called Jake to schedule for 1/29 between 9 and 11 am. Left VM.

1/27/26 lcoonrod

I have not been contacted for scheduling a service and the parts have arrived. 

Jake Torres

1/22/26 lcoonrod parts have not shipped 670029096 CLEANING KIT FOR VACUUM + SPEC TUBE VSFLDHIS HOT ION SOURCE KIT VSFLDCL VS SERIES CALIBRATED LEAK REPLACEMENT VSFLDOV VS SERIES, VALVE BLOCK O-RING KIT 695409005 OIL MECH.VACUUM PUMP 1 LITER CONTAINER

🔧 Work Performed
Arrived onsite. Met with POC Jake. Jake informed me that they usually have Agilent ship them parts and the customer does the repairs and that they had recently done a turbo replacement, and changed out filaments. After a few startups the turbo had spooled up as normal, however, the unit was giving a gain too high warning, and also would constantly try to calibrate without being directed to do so. When Jake brought me to the unit, I pulled off panels and the first thing I did was remove old calibrated leak and noticed oil around the o-ring on the calibrated leak. I then removed the flex hose going into valve block. Both the valve block and flex line had oil in it. Determined that the pump's check valve had failed and had released oil all throughout all components of the leak detector. I spoke with Bruce at Agilent and we agreed that oil had penetrated leak detector and will need to be sent to depot to get bench overhaul. Bruce was going to reach out to customer to set up a time/date to ship unit.
🔍 Technician Findings
Arrived onsite. Met with POC Jake. Jake informed me that they usually have Agilent ship them parts and the customer does the repairs and that they had recently done a turbo replacement, and changed out filaments. After a few startups the turbo had spooled up as normal, however, the unit was giving a gain too high warning, and also would constantly try to calibrate without being directed to do so. When Jake brought me to the unit, I pulled off panels and the first thing I did was remove old calibrated leak and noticed oil around the o-ring on the calibrated leak. I then removed the flex hose going into valve block. Both the valve block and flex line had oil in it. Determined that the pump's check valve had failed and had released oil all throughout all components of the leak detector. I spoke with Bruce at Agilent and we agreed that oil had penetrated leak detector and will need to be sent to depot to get bench overhaul. Bruce was going to reach out to customer to set up a time/date to ship unit.
⚠️ Problem Description
Parts Prediction 01/21/2026 14:18:05 WF-BATCH Agent: PIERCEB Timestamp: 2026-01-21 13:16:21 670029096 VSFLDHIS VSFLDCL VSFLDOV 695409005 ____________________ Note 01/21/2026 14:18:05 WF-BATCH Agent: PIERCEB Timestamp: 2026-01-21 13:16:21 Once the quotation has been accepted, please create a service order and assign it to the service employee group 98004236. Salesperson - Sean O’Brien; sean.obrien@agilent.com; Mobile: 281-352-5334. It does not pass calibration. It give an error of "Gain too High".
📄 Description
Wet, Helium LD MR15
📞 Call Description
VPD Field Repair Trade

Timeline

📞
Case Linked Jan 22, 7:37 AM
Case Number: 00561246
Subject: 6008399099
Status: Closed
📋
3 Work Order Created Jan 22, 11:34 AM
Work Order Created → 5x Parts Added → Status: Awaiting Parts
🔩
5x Parts Added
Type: Parts
Status: Open
Qty: 1
📦
Status: Awaiting Parts by Leona Coonrod
From: Entered
To: Awaiting Parts
Duration in Previous: 1m
4.0 business days
📅
3 Status: Ready for Scheduling Jan 27, 5:13 PM
Status: Ready for Scheduling → Technician Assigned → Status: Assigned
👷
Technician Assigned by Kaitlyn Kelch
Technician: Curtis Sprague
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling
To: Assigned
Duration in Previous: 3m
🗓️
2 Status: Scheduled Jan 28, 2:32 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-01-29T15:00:00.000+0000
🔧
Status: Tech On Site by Curtis Sprague Jan 29, 11:49 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 21h 16m
⏱️
2 4x Labor Added Jan 29, 9:45 PM
4x Labor Added → Status: Completed
✔️
Status: Completed by Curtis Sprague
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 9h 57m, 0m
2.3 business days
✏️
Status: WO Correction Needed by MICHAEL MCNAMARA Feb 2, 1:02 PM
From: Closed
To: WO Correction Needed
Duration in Previous: 3d 15h
🏁
Status: Closed by Craig Dempsey Feb 3, 10:02 AM
From: WO Correction Needed
To: Closed
Duration in Previous: 20h 59m
2.0 business days
💵
Status: Billing Review by Hannah Shaw Feb 4, 4:34 PM
From: Closed
To: Billing Review
Duration in Previous: 1d 6h
3.8 business days
📄
Status: Ready to Bill by MICHAEL MCNAMARA Feb 9, 7:19 AM
From: Billing Review
To: Ready to Bill
Duration in Previous: 4d 14h
4.0 business days
📨
Status: Invoice Pending by Hannah Shaw Feb 12, 11:05 PM
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 3d 15h
⚠️ 9.1 business days
💰
2 Status: Invoiced Feb 25, 11:08 AM
Status: Invoiced → Invoice Created
🧾
Invoice Created
Invoice Number: SM-253781

Bottlenecks

Awaiting Parts
Duration: 3.9 business days (threshold: 3.0 business days)
Exceeded by 7.4 business hours
Assigned
Duration: 1.2 business days (threshold: 4.0 business hours)
Exceeded by 5.7 business hours
Tech On Site
Duration: 1.2 business days (threshold: 1.0 business days)
Exceeded by 2.0 business hours
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Billing Review
Duration: 3.3 business days (threshold: 2.0 business days)
Exceeded by 1.3 business days
Ready to Bill
Duration: 4.5 business days (threshold: 1.0 business days)
Exceeded by 3.5 business days
Invoice Pending
Duration: 9.0 business days (threshold: 2.0 business days)
Exceeded by 7.0 business days

🔗 Related Artifacts

📞
Case 00561246
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Repair/PM
Branch
ERLA - PROD
Technician
Curtis Sprague
Scheduled
Jan 29, 10:00 AM
Created
Jan 22, 11:34 AM
Invoice #
SM-253781

Work Details (9)

Name Type Status Qty Amount Date
WL-03074910 Parts Open 1 $0.00 Jan 22, 11:35 AM
WL-03074911 Parts Open 1 $0.00 Jan 22, 11:35 AM
WL-03074912 Parts Open 1 $0.00 Jan 22, 11:35 AM
WL-03074913 Parts Open 1 $0.00 Jan 22, 11:35 AM
WL-03074914 Parts Open 1 $0.00 Jan 22, 11:35 AM
WL-03084278 Labor Open 4 $0.00 Jan 29, 9:45 PM
WL-03084279 Labor Open 1.5 $541.00 Jan 29, 9:45 PM
WL-03084280 Labor Open 5 $0.00 Jan 29, 9:45 PM
WL-03084281 Travel Open 230 $800.00 Jan 29, 9:45 PM

Details