Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Apr 30, 2026
✓ SLA Met (9 biz days early)
🕐 Clock stopped: Tech Off Site (Apr 17, 2026)
▶ Clock Running
Status: Created
Jan 22 → Jan 22, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 22 → Jan 22, 2026
0 business days (counted)
Running total: 0 of ? biz days used
10d
▶ Clock Running
Status: Assigned
Jan 22 → Feb 5, 2026
10 business days (counted)
Running total: 10 of ? biz days used
49d
▶ Clock Running
Status: Scheduled
Feb 5 → Apr 16, 2026
49 business days (counted)
Running total: 59 of ? biz days used
▶ Clock Running
Status: Tech On Site
Apr 16 → Apr 16, 2026
0 business days (counted)
Running total: 59 of ? biz days used
▶ Clock Running
Status: Scheduled
Apr 16 → Apr 17, 2026
1 business day (counted)
Running total: 60 of ? biz days used
Created: Jan 22, 2026
Tech Off Site: Apr 17, 2026
Show SLA Clock Detail (6 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 22 → Jan 22
Created
▶ Running
0
0
Jan 22 → Jan 22
Ready for Scheduling
▶ Running
0
0
Jan 22 → Feb 5
Assigned
▶ Running
10
10
Feb 5 → Apr 16
Scheduled
▶ Running
49
59
Apr 16 → Apr 16
Tech On Site
▶ Running
0
59
Apr 16 → Apr 17
Scheduled
▶ Running
1
60
Coordinators
61.8 days
Over SLA
Billing
18.6 days
Over SLA
Created: Jan 22, 2026
Due: Apr 30, 2026
Completed: Apr 20, 2026 (10 days early)
⏱️
50.0d in Scheduled
Longest Stage
🔄
9 transitions
Status Changes
⚠️
75.2d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00561394
6008311299
Closed
28R
SYS-GC-7890-E
Contract ends 07/31/2026 repair included
PM
G3440AR
CN13031158 Certified Pre-Owned 7890A+ GC System
G4557A
CN14170035 7697A Headspace Sampler, 111 Vial
🚨
Primary Delay
50.0 days stuck in "Scheduled"
⏱️
Total Delay
75.2 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
10.1d
/ 0.5d SLA
Scheduled
51.7d
/ 2.0d SLA
Tech On Site
0.3d
/ 1.0d SLA
Tech Off Site
2.0d
/ 2.0d SLA
Ready to Bill
18.5d
/ 1.0d SLA
Invoice Pending
0.1d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
04/20 PM end time should be 3:10 pm, by mistake I put 4:10. As notice in the travel time back to home, I spent at this site, more of than 6 hours while customer was running tests. MD
04/17 I noticed that didn't take the on site when I did it yesterday. MD
4/16/26 lcoonrod FSM board updatd.
04/16 arrival on site 09:10, safety training and waiting for customer at lobby 1 hr.
Time added in labor. Google map was used to calculate zone . I spent more time that the one is in my TS. MD
Please assign to Maria Davis ARP to site is 65 miles. Zone 2
🔧
Work Performed
04/16/2026 GCHS PM was completed per Agilent. System cooled off and GC/HS parts were replaced. Interface had to be installed twice due to a break. All tests passed. Customer method was loaded and stabilized for some time. A sequence with calibrators, checkout mix and standard confirmation was run using HS (~2 hrs.). Results are expected.
⚠️
Problem Description
28R
SYS-GC-7890-E
Contract ends 07/31/2026 repair included
PM
G3440AR
CN13031158 Certified Pre-Owned 7890A+ GC System
G4557A
CN14170035 7697A Headspace Sampler, 111 Vial
📄
Description
Refurbished 7890A Gas Chromatograph
📞
Call Description
APR 2025 GC PM
📅
WO-01339358 - Preventive Maintenance - DD: 04/30/2026 - G3440AR - Lewisville - Med Fusion
Apr 16, 2026 11:00am – 4:00pm
Work Order: WO-01339358
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008311299
Location: Med Fusion
Address: 2501 S State Hwy 121 Ste 1100, Lewisville, TX 75067
Manufacturer:
Model #: G3440AR
Serial #: CN13031158
Contact Name: Alice Gallegos
Contact Phone: (972) 966-7190
Contact Email
Timeline
📞
📋
Work Order:
WO-01339358
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
🗓️
📅
Scheduled For:
2026-04-16T15:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
70d 13h
🗓️
From:
Tech On Site
To:
Scheduled
Duration in Previous:
2h 14m
🚗
From:
Scheduled
To:
Tech Off Site
Duration in Previous:
21h 8m
🔩
Type:
Parts
Status:
Open
Qty:
2, 1
⏱️
Type:
Labor
Status:
Open
Qty:
7, 3
💵
Type:
Expenses, Travel
Status:
Open
Qty:
1, 70
⏱️
Type:
Labor
Status:
Open
Qty:
3
✔️
From:
Tech Off Site, Completed
To:
Completed, Closed
Duration in Previous:
2d 23h, 0m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
4h 27m
📨
From:
Ready to Bill
To:
Invoice Pending
Duration in Previous:
23d 23h
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
36m
🧾
Invoice Number:
SM-261939
Bottlenecks
Assigned
Duration: 10.1 business days (threshold: 4.0 business hours)
Exceeded by 9.6 business days
Scheduled
Duration: 50.0 business days (threshold: 2.0 business days)
Exceeded by 48.0 business days
Ready to Bill
Duration: 18.5 business days (threshold: 1.0 business days)
Exceeded by 17.5 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Apr 16, 11:00 AM
Work Details (10)
Name
Type
Status
Qty
Amount
Date
WL-03190512
Parts
Open
2
$0.00
Apr 17, 12:36 PM
WL-03190511
Parts
Open
2
$0.00
Apr 17, 12:36 PM
WL-03190513
Parts
Open
1
$0.00
Apr 17, 12:36 PM
WL-03190514
Parts
Open
2
$0.00
Apr 17, 12:36 PM
WL-03191901
Labor
Open
7
$484.00
Apr 18, 3:02 PM
WL-03191900
Labor
Open
3
$225.00
Apr 18, 3:02 PM
WL-03192221
Expenses
Open
1
$0.00
Apr 19, 2:50 PM
WL-03192222
Travel
Open
70
$0.00
Apr 19, 2:50 PM
WL-03192223
Travel
Open
70
$0.00
Apr 19, 2:50 PM
WL-03192224
Labor
Open
3
$225.00
Apr 19, 2:55 PM