Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01350491 ↗ ServiceMax

AGILENT TECHNOLOGIES (ASP) • Preventive Maintenance • PC

📍 Central Coast Agriculture Inc — 8701 Santa Rosa Rd, BUELLTON CA, 93427

Feb 9, 2026 → Feb 19, 2026

✅ Completed
PC
SLA Clock
Per client agreement · Target: Apr 30, 2026
✓ SLA Met (50 biz days early)
Active: 7 biz days
🕐 Clock stopped: Canceled (Feb 19, 2026)
▶ Clock Running
Status: Created
Feb 9 → Feb 9, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Feb 9 → Feb 9, 2026
0 business days (counted)
Running total: 0 of ? biz days used
7d
▶ Clock Running
Status: Assigned
Feb 9 → Feb 19, 2026
7 business days (counted)
Running total: 7 of ? biz days used
▶ Clock Running
Status: Entered
Feb 19 → Feb 19, 2026
0 business days (counted)
Running total: 7 of ? biz days used
Created: Feb 9, 2026 Canceled: Feb 19, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Feb 9 → Feb 9 Created ▶ Running 0 0
Feb 9 → Feb 9 Ready for Scheduling ▶ Running 0 0
Feb 9 → Feb 19 Assigned ▶ Running 7 7
Feb 19 → Feb 19 Entered ▶ Running 0 7
Dispatch 0.0d
Coordinators 8.0d
✓ SLA Met
Dispatch
0.0 days
Coordinators
8.0 days
Over SLA
Created: Feb 9, 2026 Due: Apr 30, 2026 Completed: Feb 19, 2026 (70 days early)
📅
8.0 days Total Age
⏱️
8.0d in Assigned Longest Stage
🔄
2 transitions Status Changes
⚠️
7.5d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
0 lines Work Details

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00566486
6008384853
Closed
38R SYS-LC-1260II Contract ends 07/14/2026 repair included PMPLUS PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service. G7115A DEAC615172 1260 Infinity II Diode Array Detector WR G7116A DEAEM05605 1260 Infinity II Multicolumn Thermostat G7167A DEAGY01522 1260 Infinity II Multisampler G7112B DEAE800955 1260 Infinity II Binary Pump
Priority
High
Origin
Web
Reason
New Case
Contact
Kevin Kroeger
Owner
Leona Coonrod
Created
Feb 9, 2026
Work Orders from this Case (1)
WO-01350491 (current) Canceled
Preventive Maintenance
Created: Feb 9, 2026
At Risk - Monitor Closely
Canceled • 186 days old
🚨
Primary Delay 8.0 days stuck in "Assigned"
⏱️
Total Delay 7.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
8.0d / 0.5d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes
2/19/26 lcoonrod Agilent is pulling this SO back. Please assign to Hermilo Solano ARP to site is 158 miles. Zone 4
⚠️ Problem Description
38R SYS-LC-1260II Contract ends 07/14/2026 repair included PMPLUS PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service. G7115A DEAC615172 1260 Infinity II Diode Array Detector WR G7116A DEAEM05605 1260 Infinity II Multicolumn Thermostat G7167A DEAGY01522 1260 Infinity II Multisampler G7112B DEAE800955 1260 Infinity II Binary Pump
📄 Description
1260 Infinity II Binary Pump
📞 Call Description
APR 2026 LC PMPLUS

Timeline

📞
Case Linked Feb 9, 8:38 AM
Case Number: 00566486
Subject: 6008384853
Status: Closed
📋
3 Work Order Created Feb 9, 8:52 AM
Work Order Created → Status: Ready for Scheduling → Technician Assigned
📅
Status: Ready for Scheduling by Leona Coonrod
From: Entered, Ready for Scheduling
To: Ready for Scheduling, Assigned
Duration in Previous: 0m
👷
Technician Assigned by Leona Coonrod
Technician: Hermilo Solano
⚠️ 8.0 business days
🆕
Status: Entered by Leona Coonrod Feb 19, 9:08 AM
From: Assigned, Entered
To: Entered, Canceled
Duration in Previous: 10d 0h, 0m

Bottlenecks

Assigned
Duration: 8.0 business days (threshold: 4.0 business hours)
Exceeded by 7.5 business days

🔗 Related Artifacts

📞
Case 00566486
Closed

ℹ️ Work Order Details

Status
Canceled
Priority
PC
Type
Preventive Maintenance
Branch
N/A
Technician
Unassigned
Scheduled
N/A
Created
Feb 9, 8:52 AM
Invoice #
N/A

Details