Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PSM
SLA Clock
Last business day of February 2026 · Target: Feb 27, 2026
✗ SLA Missed (19 biz days late)
🕐 Clock stopped: Completed (Mar 27, 2026)
▶ Clock Running
Status: Created
Feb 10 → Feb 10, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Feb 10 → Feb 13, 2026
3 business days (counted)
Running total: 3 of ? biz days used
12d
▶ Clock Running
Status: On Hold
Feb 13 → Mar 4, 2026
12 business days (counted)
Running total: 15 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Mar 4 → Mar 4, 2026
0 business days (counted)
Running total: 15 of ? biz days used
13d
▶ Clock Running
Status: Assigned
Mar 4 → Mar 23, 2026
13 business days (counted)
Running total: 28 of ? biz days used
▶ Clock Running
Status: Entered
Mar 23 → Mar 23, 2026
0 business days (counted)
Running total: 28 of ? biz days used
▶ Clock Running
Status: On Hold
Mar 23 → Mar 23, 2026
0 business days (counted)
Running total: 28 of ? biz days used
▶ Clock Running
Status: Assigned
Mar 23 → Mar 23, 2026
0 business days (counted)
Running total: 28 of ? biz days used
▶ Clock Running
Status: Scheduled
Mar 23 → Mar 26, 2026
3 business days (counted)
Running total: 31 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 26 → Mar 27, 2026
1 business day (counted)
Running total: 32 of ? biz days used
Created: Feb 10, 2026
Completed: Mar 27, 2026
Show SLA Clock Detail (10 periods)
| Period |
Status |
Clock |
Biz Days |
Running Total |
| Feb 10 → Feb 10 |
Created |
▶ Running
|
0 |
0 |
| Feb 10 → Feb 13 |
Ready for Scheduling |
▶ Running
|
3 |
3 |
| Feb 13 → Mar 4 |
On Hold |
▶ Running
|
12 |
15 |
| Mar 4 → Mar 4 |
Ready for Scheduling |
▶ Running
|
0 |
15 |
| Mar 4 → Mar 23 |
Assigned |
▶ Running
|
13 |
28 |
| Mar 23 → Mar 23 |
Entered |
▶ Running
|
0 |
28 |
| Mar 23 → Mar 23 |
On Hold |
▶ Running
|
0 |
28 |
| Mar 23 → Mar 23 |
Assigned |
▶ Running
|
0 |
28 |
| Mar 23 → Mar 26 |
Scheduled |
▶ Running
|
3 |
31 |
| Mar 26 → Mar 27 |
Tech On Site |
▶ Running
|
1 |
32 |
Holding (excluded from total)
12.7 days
Coordinators
21.0 days
Over SLA
Billing
28.0 days
Over SLA
Created: Feb 10, 2026
Due: Mar 31, 2026
Completed: Mar 27, 2026 (4 days early)
⏱️
28.0d in Billing Review
Longest Stage
🔄
12 transitions
Status Changes
⚠️
43.3d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00566846
eBiotrack - Automated New Inspection Created
Closed
Annual Equipment Electrical Safety Test And Calibration Service
Equipment: 101
https://www.ebiotrack.com/inspection.php?iid=32996
🚨
Primary Delay
28.0 days stuck in "Billing Review"
⏱️
Total Delay
43.3 business days over SLA thresholds
SLA vs Actual Time by Status
Ready for Scheduling
3.8d
/ 1.0d SLA
Assigned
13.6d
/ 0.5d SLA
Scheduled
3.6d
/ 2.0d SLA
Tech On Site
0.7d
/ 1.0d SLA
Completed
0.2d
/ 1.0d SLA
Billing Review
28.0d
/ 2.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
🔒
Internal CSA Notes
3/27/26 DPatton - All WO's must have a PO#. Do we have a PO for this?
3/26 KKelch called Roxana to reschedule for today between 11 and 11:30 am as the tech had room in his calendar. Customer confirmed.
3/23 KKelch called Roxana back to schedule for 3/30 between 8 and 10 am. Customer confirmed.
3/23 KKelch called Roxana to schedule for 3/25 between 8 and 10 am. Left VM. Placed on hold due to 3 failed attempts to schedule.
3/18 KKelch called Roxana to schedule for 3/25 with arrival between 8 and 10 am. Left VM.
3/16 KKelch called Roxana to schedule for 3/25 between 8 and 10 am. Left VM.
🔧
Work Performed
Annual Equipment Electrical Safety Test And Calibration Service 68 items
🔍
Technician Findings
Annual Equipment Electrical Safety Test And Calibration Service
⚠️
Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
Equipment: 101
https://www.ebiotrack.com/inspection.php?iid=32996
📋
Outbound to +16233297096
Completed
Mar 26, 2026
3/26 KKelch called Roxana to reschedule for today between 11 and 11:30 am as the tech had room in his calendar. Customer confirmed.
📋
Outbound to +16233297096
Completed
Mar 23, 2026
3/23 KKelch called Roxana back to schedule for 3/30 between 8 and 10 am. Customer confirmed.
📋
Outbound to +16233297096
Completed
Mar 23, 2026
3/23 KKelch called Roxana to schedule for 3/25 between 8 and 10 am. Left VM. Placed on hold due to 3 failed attempts to schedule.
📋
Outbound to +16233297096
Completed
Mar 18, 2026
3/18 KKelch called Roxana to schedule for 3/25 with arrival between 8 and 10 am. Left VM.
📋
Outbound to +16233297096
Completed
Mar 16, 2026
3/16 KKelch called Roxana to schedule for 3/25 between 8 and 10 am. Left VM.
Mar 27, 2026 11:40am
hi @Scott Berry Do we have a PO# for this, per smc notes? I don't see one attached. Placing WO in BR, Awaiting PO#
📅
WO-01350885 - Inspection - DD: 3/31/2026 - - Laveen - HonorHealth - Laveen (0330-0301)
Mar 26, 2026 2:00pm – 5:00pm
Work Order: WO-01350885
Account: HonorHealth Network
Customer Case Number:
Location: HonorHealth - Laveen (0330-0301)
Address: 5130 W Baseline, Suite 102, Laveen, AZ 85339
Manufacturer:
Model #:
Serial #:
Contact Name: Roxana Escamilla
Contact Phone: 623-329-7096
Contact Email: rescamilla@fastme
Timeline
📞
Case Number:
00566846
Subject:
eBiotrack - Automated New Inspection Created
Status:
Closed
📋
📅
From:
Entered
To:
Ready for Scheduling
Duration in Previous:
0m
⏸️
From:
Ready for Scheduling
To:
On Hold
Duration in Previous:
3d 2h
📅
From:
On Hold
To:
Ready for Scheduling
Duration in Previous:
18d 20h
👷
👷
Technician:
Tyler Bollman
🆕
From:
Assigned, Entered
To:
Entered, On Hold
Duration in Previous:
18d 19h, 0m
👷
👷
From:
On Hold, Assigned
To:
Assigned, Scheduled
Duration in Previous:
3h 36m, 0m
📅
Scheduled For:
2026-03-30T15:00:00.000+0000
📅
Scheduled For:
2026-03-26T18:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
3d 0h
⏱️
⏱️
Type:
Labor
Status:
Open
Qty:
1.5
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
5h 36m
🏁
From:
Completed
To:
Closed
Duration in Previous:
1h 31m
💵
From:
Closed
To:
Billing Review
Duration in Previous:
13h 21m
📄
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
0m
🧾
Invoice Number:
SM-261040
Bottlenecks
Ready for Scheduling
Duration: 3.6 business days (threshold: 1.0 business days)
Exceeded by 2.6 business days
Assigned
Duration: 13.6 business days (threshold: 4.0 business hours)
Exceeded by 13.1 business days
Scheduled
Duration: 3.6 business days (threshold: 2.0 business days)
Exceeded by 1.6 business days
Billing Review
Duration: 28.0 business days (threshold: 2.0 business days)
Exceeded by 26.0 business days
ℹ️ Work Order Details
Scheduled
Mar 26, 2:00 PM
Work Details (5)
| Name |
Type |
Status |
Qty |
Amount |
Date |
| WL-03161721 |
Labor |
Open |
1 |
$0.00 |
Mar 26, 7:56 PM |
| WL-03161722 |
Labor |
Open |
6.25 |
$1,490.40 |
Mar 26, 7:56 PM |
| WL-03161723 |
Travel |
Open |
25 |
- |
Mar 26, 7:56 PM |
| WL-03161724 |
Travel |
Open |
25 |
- |
Mar 26, 7:56 PM |
| WL-03161725 |
Labor |
Open |
1.5 |
$0.00 |
Mar 26, 7:59 PM |