Primary Delay43.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay47.6 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
43.0d / 1.0d SLA
Assigned
0.0d / 0.5d SLA
Scheduled
9.0d / 2.0d SLA
Closed
1.6d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
4/15/26 AJinerson - Reassigning tech but keeping original scheduled date/time. Original tech will be out week of 4/20-4/24 and we are traveling other HCP tech into area to assist w/ coverage.
4/13/26 AJinerson - Received call back from POC Melanie at (863) 327-2005. Confirmed scheduling for Weds. 4/22 between 10am-12pm arrival as this is their less busy day.
POC on-site: Melanie
Arrival instructions: None and no special requirements for this facility.
Confirmed address.
4/13/26 AJinerson - Called site to schedule tech visit. Confirmed this is the correct number/POC for this location, but POC Melanie was in a meeting. Staff took my name/number to have Melanie call us back to schedule.
🔧Work Performed
Inspected and calibration verified 51 devices
All 51 devices passed
Returned back to service
🔍Technician Findings
Arrived at site
⚠️Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
75 pieces
https://www.ebiotrack.com/inspection.php?iid=33021
📋
Outbound to +18633272005
Completed Apr 13, 2026
4/13/26 AJinerson - Received call back from POC Melanie at (863) 327-2005. Confirmed scheduling for Weds. 4/22 between 10am-12pm arrival as this is their less busy day.
POC on-site: Melanie
Arrival instructions: None and no special requirements for this facility.
Confirmed address.
📋
Outbound to +18136889484
Completed Apr 13, 2026
4/13/26 AJinerson - Called site to schedule tech visit. Confirmed this is the correct number/POC for this location, but POC Melanie was in a meeting. Staff took my name/number to have Melanie call us back to schedule.