20U
SYS-LC-1260-E
Contract ends 12/31/2026 repair included
ENHPM / EOQ
Enhance PM -, the lamp is automatically changed at time of PM service with no questions. Have techs just order a lamp for an Enhanced PM.
G1330B
DEBAK15872 1290 Thermostat
G1367E
DEACO04036 1260 High Performance Autosampler
G1322A
JPAAJ82618 1260 Standard Degasser
G1312B
DEACB06392 1260 Binary Pump
G1321C
DEABV00117 1260 Infinity Fluorescence Detector
G1315D
DEAAX05211 1260 Diode Array Detector VL
G1316C
DEBAC07510 1290 Thermostatted Column Compartment
Total Delay116.0 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
94.0d / 0.5d SLA
Scheduled
24.5d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
8/4/26 lcoonrod WO cancelled, per email from Patricia Brinckwirth, is being pulled back to Agilent.
7/1/26 lcoonrod added to FSM board for 8/13
20 Feb 2026 Larry Alberty
Customer replied they want the service in August. Advised Leona.
20 Feb 2026 Larry Alberty
Reached out for scheduling
Please assign to Larry Alberty ARP to site is 13 miles. Zone 1
⚠️Problem Description
20U
SYS-LC-1260-E
Contract ends 12/31/2026 repair included
ENHPM / EOQ
Enhance PM -, the lamp is automatically changed at time of PM service with no questions. Have techs just order a lamp for an Enhanced PM.
G1330B
DEBAK15872 1290 Thermostat
G1367E
DEACO04036 1260 High Performance Autosampler
G1322A
JPAAJ82618 1260 Standard Degasser
G1312B
DEACB06392 1260 Binary Pump
G1321C
DEABV00117 1260 Infinity Fluorescence Detector
G1315D
DEAAX05211 1260 Diode Array Detector VL
G1316C
DEBAC07510 1290 Thermostatted Column Compartment
📄Description
LC 1260 System
📞Call Description
AUG 2026 LC EOQ
📞
Call
Completed Feb 20, 2026
20 Feb 2026 Larry Alberty
Customer replied they want the service in August. Advised Leona.
📞
Call
Completed Feb 20, 2026
20 Feb 2026 Larry Alberty
Reached out for scheduling
Timeline
📞
Case Linked Feb 16, 4:37 PM
Case Number:00568908
Subject:6008323322
Status:Closed
📋
▶
3
Work Order Created Feb 17, 8:25 AM
Work Order Created → Status: Ready for Scheduling → Technician Assigned
📅
Status: Ready for Scheduling by Leona Coonrod
From:Entered, Ready for Scheduling
To:Ready for Scheduling, Assigned
Duration in Previous:0m
👷
Technician Assigned by Leona Coonrod
Technician:a0hF0000001pE6KIAU, Larry Alberty
🚨94.0 business days
🗓️
▶
2
Status: Scheduled Jun 30, 3:43 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Larry Alberty
Scheduled For:2026-08-13T11:00:00.000+0000
🚨25.0 business days
🆕
Status: Entered by Leona CoonrodAug 4, 4:32 PM
From:Scheduled, Entered
To:Entered, Canceled
Duration in Previous:35d 0h, 0m
Bottlenecks
Assigned
Duration: 94.0 business days (threshold: 4.0 business hours)
Exceeded by 93.5 business days
Scheduled
Duration: 24.5 business days (threshold: 2.0 business days)