Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01352268 ↗ ServiceMax

AGILENT TECHNOLOGIES (ASP) • Preventive Maintenance • PC

📍 Thermo Fisher Scientific Inc — 6055 Sunol Blvd., Pleasanton CA, 94566

Feb 17, 2026 → Apr 27, 2026

✅ Completed
PC
SLA Clock
Per client agreement · Target: Apr 30, 2026
✓ SLA Met (3 biz days early)
Active: 49 biz days
🕐 Clock stopped: Canceled (Apr 27, 2026)
▶ Clock Running
Status: Created
Feb 17 → Feb 17, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Feb 17 → Feb 17, 2026
0 business days (counted)
Running total: 0 of ? biz days used
4d
▶ Clock Running
Status: Assigned
Feb 17 → Feb 23, 2026
4 business days (counted)
Running total: 4 of ? biz days used
28d
▶ Clock Running
Status: Scheduled
Feb 23 → Apr 2, 2026
28 business days (counted)
Running total: 32 of ? biz days used
9d
▶ Clock Running
Status: Reschedule
Apr 2 → Apr 15, 2026
9 business days (counted)
Running total: 41 of ? biz days used
▶ Clock Running
Status: Entered
Apr 15 → Apr 15, 2026
0 business days (counted)
Running total: 41 of ? biz days used
▶ Clock Running
Status: Canceled
Apr 15 → Apr 15, 2026
0 business days (counted)
Running total: 41 of ? biz days used
▶ Clock Running
Status: Entered
Apr 15 → Apr 15, 2026
0 business days (counted)
Running total: 41 of ? biz days used
Created: Feb 17, 2026 Canceled: Apr 27, 2026
Show SLA Clock Detail (8 periods)
Period Status Clock Biz Days Running Total
Feb 17 → Feb 17 Created ▶ Running 0 0
Feb 17 → Feb 17 Ready for Scheduling ▶ Running 0 0
Feb 17 → Feb 23 Assigned ▶ Running 4 4
Feb 23 → Apr 2 Scheduled ▶ Running 28 32
Apr 2 → Apr 15 Reschedule ▶ Running 9 41
Apr 15 → Apr 15 Entered ▶ Running 0 41
Apr 15 → Apr 15 Canceled ▶ Running 0 41
Apr 15 → Apr 15 Entered ▶ Running 0 41
Dispatch 0.5d
Coordinators 44.0d
✓ SLA Met
Dispatch
0.5 days
Coordinators
44.0 days
Over SLA
Created: Feb 17, 2026 Due: Apr 30, 2026 Completed: Apr 27, 2026 (3 days early)
📅
50.0 days Total Age
⏱️
29.0d in Scheduled Longest Stage
🔄
5 transitions Status Changes
⚠️
39.5d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
0 lines Work Details

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00569055
6008321005
Closed
38R SYS-LC-1260-E Contract ends 12/31/2026 repair included PMPLUS / EOQ PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service. G1315D-B DE64260072 1200 Series Diode Array Detector G1312B DE63061707 1260 Binary Pump G1379B JP94112867 1260 Infinity Micro Degasser. G1330B-B DE84969992 1200 Cooled Thermostatted ALS G1316B DE90361114 1200 Series Thermost. Col. Compartm. SL G1321A DE90959678 1200 Series Fluorescence Detector G1367D DE82555186 1200 Series High Performance ALS SL Plus
Priority
High
Origin
Web
Reason
New Case
Contact
Huan Doan
Owner
Leona Coonrod
Created
Feb 17, 2026
Work Orders from this Case (2)
WO-01352268 (current) Canceled
Preventive Maintenance
Created: Feb 17, 2026
WO-01352269 Canceled
EOQ
Created: Feb 17, 2026
Behind Schedule - Needs Attention
Canceled • 178 days old
🚨
Primary Delay 29.0 days stuck in "Scheduled"
⏱️
Total Delay 39.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.5d / 0.5d SLA
Assigned
5.0d / 0.5d SLA
Scheduled
29.0d / 2.0d SLA
Reschedule
10.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

4/15/26 lcoonrod cancelled - SO-6008321005 (Gigi) This can be returned to Agilent for re-assignment to Robert Lu. I have parts ordered against this SO and will need to return the parts before it’s taken of my hands. Best regards, Larry

4/2/26 lcoonrod showing in rescheduled status.

2 Apr 2026 Larry Alberty

Customer has stated the service will need to be re-scheduled due to

unforeseen heavy usage of the equipment currently.


20 Feb 2026 Larry Alberty

Reached out for scheduling


Please assign to Larry Alberty ARP to site is 13 miles. Zone 1

⚠️ Problem Description
38R SYS-LC-1260-E Contract ends 12/31/2026 repair included PMPLUS / EOQ PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service. G1315D-B DE64260072 1200 Series Diode Array Detector G1312B DE63061707 1260 Binary Pump G1379B JP94112867 1260 Infinity Micro Degasser. G1330B-B DE84969992 1200 Cooled Thermostatted ALS G1316B DE90361114 1200 Series Thermost. Col. Compartm. SL G1321A DE90959678 1200 Series Fluorescence Detector G1367D DE82555186 1200 Series High Performance ALS SL Plus
📄 Description
LC 1260 System Enhanced LC Features
📞 Call Description
APR 2026 LC PMPLUS

Timeline

📞
2 Case Linked Feb 17, 8:45 AM
Case Linked → Work Order Created
📋
Work Order Created
Work Order: WO-01352268
Type: Preventive Maintenance
Priority: PC
📅
2 Status: Ready for Scheduling Feb 17, 8:51 AM
Status: Ready for Scheduling → Technician Assigned
👷
Technician Assigned by Leona Coonrod
Technician: Larry Alberty
⚠️ 5.0 business days
🗓️
2 Status: Scheduled Feb 23, 10:52 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Larry Alberty
Scheduled For: 2026-04-03T13:00:00.000+0000
🚨 29.0 business days
🔄
Status: Reschedule by Larry Alberty Apr 2, 10:37 AM
From: Scheduled
To: Reschedule
Duration in Previous: 37d 22h
🚨 10.0 business days
🆕
Status: Entered by Leona Coonrod Apr 15, 11:56 AM
From: Reschedule, Entered, Canceled
To: Entered, Canceled
Duration in Previous: 13d 1h, 0m
🚫
Status: Canceled by Leona Coonrod Apr 15, 3:50 PM
From: Entered
To: Canceled
Duration in Previous: 3h 53m

Bottlenecks

Assigned
Duration: 5.0 business days (threshold: 4.0 business hours)
Exceeded by 4.5 business days
Scheduled
Duration: 29.0 business days (threshold: 2.0 business days)
Exceeded by 27.0 business days
Reschedule
Duration: 10.0 business days (threshold: 2.0 business days)
Exceeded by 8.0 business days

🔗 Related Artifacts

📞
Case 00569055
Closed

ℹ️ Work Order Details

Status
Canceled
Priority
PC
Type
Preventive Maintenance
Branch
N/A
Technician
Unassigned
Scheduled
N/A
Created
Feb 17, 8:50 AM
Invoice #
N/A

Details