Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01310460 ↗ ServiceMax

Metro Community Health Center • Virtual Tech - Field Repair • P3

📍 Metro Community Health Center — 1789 S. Braddock Ave. Suite 395 & 410, Pittsburgh PA, 15218

Oct 21, 2025 → Dec 19, 2025

✅ Completed
P3 3 business days from creation
Target: Oct 24, 2025
🕐 Clock stopped: Invoiced (Dec 19)
⏸ 40d excluded (parts wait + holding)
✗ SLA Missed (16d late)
Dispatch 0.0d
Material Management 29.0d
Coordinators 18.7d
Field Work 0.7d
Incomplete 0.1d (excluded)
Billing 0.0d
✗ SLA Missed
Dispatch
0.0 days
Material Management
29.0 days
Over SLA
Coordinators
18.7 days
Over SLA
Field Work
0.7 days
Incomplete (excluded from total)
0.1 days
Billing
0.0 days
Created: Oct 21, 2025 Due: Dec 16, 2025 Completed: Dec 19, 2025 (2 days late)
📅
44.0 days Total Age
⏱️
29.0d in Awaiting Parts Longest Stage
🔄
13 transitions Status Changes
⚠️
37.8d over Total Delay
📦
1 orders, 0 quotes Parts & Quotes
📝
10 lines Work Details
🏠
2 visits On-Site Trips
👤
Self-Scheduled Scheduling
🔄
2 On-Site Visits (1 reschedule)
2 on-site visits — follow-up trip required
👤 Self-scheduled by Jordan Moceri — scheduling delays attributed to technician, not coordinators
Visit 1 Oct 28, 2025
Visit 2 Dec 19, 2025

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00535694
HCP L2 Review
Closed
Welch Allyn ProBP 3400 Asset ID: 12960424 Serial #: 100051184523 I need to have a blood pressure machine repaired.
Priority
Standard
Origin
Email
Reason
New Case
Contact
Marlene Lukasik
Owner
Virtual Tech
Created
Oct 15, 2025
Work Orders from this Case (2)
WO-01310460 (current) Invoiced
Virtual Tech - Field Repair • Jordan Moceri
Created: Oct 21, 2025 • Closed: Dec 19, 2025
WO-01310462 Invoiced
Virtual Tech - Field Repair • Jordan Moceri
Created: Oct 21, 2025 • Closed: Oct 28, 2025
Completed with significant delays
Invoiced • 205 days old
🚨
Primary Delay 29.0 days stuck in "Awaiting Parts"
⏱️
Total Delay 37.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
3.8d / 1.0d SLA
Assigned
0.3d / 0.5d SLA
Scheduled
10.3d / 2.0d SLA
Closed
3.4d / 1.0d SLA
Incomplete
0.1d
Awaiting Parts
29.0d / 3.0d SLA
Reschedule
4.3d / 2.0d SLA
Tech On Site
0.7d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

12/15/2025 CRamen spoke with Dawn and scheduled for Friday 12/19/2025 with tech arrival between 9-11am. 


12-12 DSR our shipment

1Z01E3E70397216374

 Delivered On

Tuesday, December 09 at 10:18 A.M. at Office



10/22/2025 CRamen logged email on WO-01310460 confirming schedule for Tuesday 10/28/2025 with tech arrival between 10-12. 


10/22/2025 CRamen left a vm for a returned call to schedule for Tuesday 10/28/2025 with tech arrival between 10-12. Logged email and Call logged on WO-01310460. Placeholder set


10/22/2025 LHill-sent chatter to @[Charles Ramen]​ I have assigned this one. I will let you work with customer to schedule.


10/21/2025 LHill-TEAMS message-



10/21/2025 LHill-sent TEAMS message to Shawn Rogers-


10/21/2025 LHill-will discuss with Shawn on the afternoon call.

🔧 Work Performed
12/19 replaced front housing and tested functions and all functions working. Account has a second unit that needs cover replaced on. unit is hard to power on. Was able to power it on once and all functions work and it charges. Power button is broken and needs repaired
🔍 Technician Findings
Unit not powering on
⚠️ Problem Description
Perform full functional testing and document results, review findings with staff. Welch Allyn ProBP 3400 Asset ID: 12960424 Serial #: 100051184523 I need to have a blood pressure machine repaired. https://www.ebiotrack.com/workorder.php?wo=69102

Timeline

📞
Case Linked Oct 15, 10:36 AM
Case Number: 00535694
Subject: HCP L2 Review
Status: Closed
⚠️ 5.0 business days
📋
2 Work Order Created Oct 21, 9:02 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Derek Reynolds
From: Entered
To: Ready for Scheduling
Duration in Previous: 1m
👷
2 Technician Assigned Oct 22, 8:11 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Laura Hill
From: Ready for Scheduling
To: Assigned
Duration in Previous: 23h 7m
🗓️
2 Status: Scheduled Oct 22, 10:22 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Charles Ramen
Scheduled For: 2025-10-28T15:00:00.000+0000
⚠️ 5.0 business days
⏱️
2 3x Labor Added Oct 28, 10:53 PM
3x Labor Added → Status: Completed
✔️
Status: Completed by Jordan Moceri
From: Scheduled, Completed, Incomplete
To: Completed, Incomplete, Closed
Duration in Previous: 6d 12h, 0m
⚠️
Status: Incomplete by Rhonnie Reeves Oct 29, 11:10 AM
From: Closed
To: Incomplete
Duration in Previous: 12h 15m
📦
2 Parts Requested Oct 29, 12:10 PM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Wendy Argueta
From: Incomplete
To: Awaiting Parts
Duration in Previous: 59m
🚨 29.0 business days
🔩
2 2x Parts Added Dec 8, 4:21 PM
2x Parts Added → Status: Reschedule
🔄
Status: Reschedule by Sean Weaver
From: Awaiting Parts
To: Reschedule
Duration in Previous: 40d 5h
5.0 business days
📅
Status: Ready for Scheduling by Derek Reynolds Dec 12, 12:23 PM
From: Reschedule
To: Ready for Scheduling
Duration in Previous: 3d 20h
2.0 business days
🗓️
2 Status: Scheduled Dec 15, 11:41 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Charles Ramen
Scheduled For: 2025-12-19T15:00:00.000+0000
📅
Dispatch Scheduled by Charles Ramen Dec 15, 4:19 PM
Scheduled For: 2025-12-19T15:30:00.000+0000, 2025-12-19T15:00:00.000+0000
5.0 business days
🔧
Status: Tech On Site by Jordan Moceri Dec 19, 10:12 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 3d 22h
⏱️
2 5x Labor Added Dec 19, 3:47 PM
5x Labor Added → Status: Completed
✔️
Status: Completed by Jordan Moceri
From: Tech On Site, Completed, Incomplete
To: Completed, Incomplete, Closed
Duration in Previous: 5h 37m, 0m
3.0 business days
📄
3 Status: Ready to Bill Dec 23, 1:23 PM
Status: Ready to Bill → Status: Invoiced → Invoice Created
💰
Status: Invoiced by Diane Patton
From: Invoice Pending
To: Invoiced
Duration in Previous: 0m
🧾
Invoice Created
Invoice Number: SM-249836

Bottlenecks

Ready for Scheduling
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Scheduled
Duration: 5.4 business days (threshold: 2.0 business days)
Exceeded by 3.4 business days
Awaiting Parts
Duration: 29.0 business days (threshold: 3.0 business days)
Exceeded by 26.0 business days
Reschedule
Duration: 4.3 business days (threshold: 2.0 business days)
Exceeded by 2.3 business days
Ready for Scheduling
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.6 business hours
Scheduled
Duration: 4.9 business days (threshold: 2.0 business days)
Exceeded by 2.9 business days
Closed
Duration: 2.4 business days (threshold: 1.0 business days)
Exceeded by 1.4 business days

🔗 Related Artifacts

📞
Case 00535694
Closed
📦
Parts Order 00084385
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
P3
Type
Virtual Tech - Field Repair
Branch
N/A
Technician
Jordan Moceri
Scheduled
Dec 19, 10:00 AM
Created
Oct 21, 9:02 AM
Invoice #
SM-249836

Work Details (10)

Name Type Status Qty Amount Date
WL-02987480 Labor Open 3.7666666666667 $521.50 Oct 28, 10:53 PM
WL-02987481 Labor Open 1 $149.00 Oct 28, 10:53 PM
WL-02987482 Travel Open 200 - Oct 28, 10:53 PM
WL-03030424 Parts Open 1 $98.89 Dec 8, 4:21 PM
WL-03030425 Expenses Open 1 $28.05 Dec 8, 4:21 PM
WL-03043664 Labor Open 3.3666666666667 $521.50 Dec 19, 3:47 PM
WL-03043665 Labor Open 1.05 $186.25 Dec 19, 3:47 PM
WL-03043666 Labor Open 3.75 $0.00 Dec 19, 3:47 PM
WL-03043667 Travel Open 209 - Dec 19, 3:47 PM
WL-03043668 Travel Open 209 - Dec 19, 3:47 PM

Details