Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Mar 2, 2026
✗ SLA Missed
🕐 Clock stopped: Completed (Mar 6, 2026)
▶ Clock Running
Status: Created
Nov 6 → Nov 6, 2025
0 business days (counted)
Running total: 0 of ? biz days used
⏸22d
⏸ Clock Paused
Status: Ready for Release
Nov 6 → Dec 11, 2025
22 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Dec 11 → Dec 12, 2025
1 business day (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Dec 12 → Dec 12, 2025
0 business days (counted)
Running total: 1 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Dec 12 → Dec 15, 2025
1 business day (not counted)
▶ Clock Running
Status: Ready for Scheduling
Dec 15 → Dec 15, 2025
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Assigned
Dec 15 → Dec 15, 2025
0 business days (counted)
Running total: 1 of ? biz days used
54d
▶ Clock Running
Status: Scheduled
Dec 15 → Mar 5, 2026
54 business days (counted)
Running total: 55 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 5 → Mar 6, 2026
1 business day (counted)
Running total: 56 of ? biz days used
Created: Nov 6, 2025
Completed: Mar 6, 2026
Show SLA Clock Detail (9 periods)
Period
Status
Clock
Biz Days
Running Total
Nov 6 → Nov 6
Created
▶ Running
0
0
Nov 6 → Dec 11
Ready for Release
⏸ Paused
22
—
Dec 11 → Dec 12
Ready for Scheduling
▶ Running
1
1
Dec 12 → Dec 12
Scheduled
▶ Running
0
1
Dec 12 → Dec 15
Ready for Release
⏸ Paused
1
—
Dec 15 → Dec 15
Ready for Scheduling
▶ Running
0
1
Dec 15 → Dec 15
Assigned
▶ Running
0
1
Dec 15 → Mar 5
Scheduled
▶ Running
54
55
Mar 5 → Mar 6
Tech On Site
▶ Running
1
56
Holding (excluded from total)
23.7 days
Coordinators
56.7 days
Over SLA
Field Work
1.1 days
Over SLA
Billing
1.5 days
Over SLA
Created: Nov 6, 2025
Due: Mar 2, 2026
Completed: Mar 6, 2026 (3 days late)
⏱️
54.7d in Scheduled
Longest Stage
🔄
11 transitions
Status Changes
⚠️
58.3d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00541832
URGENT Philips WO Request
Closed
🚨
Primary Delay
54.7 days stuck in "Scheduled"
⏱️
Total Delay
58.3 business days over SLA thresholds
SLA vs Actual Time by Status
Ready for Scheduling
2.0d
/ 1.0d SLA
Scheduled
54.7d
/ 2.0d SLA
Tech On Site
1.1d
/ 1.0d SLA
Ready to Bill
1.5d
/ 1.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📋 Tasks (4)
💬 Chatter (1)
📅 Events (1)
📧 Case Activity (1)
🔒
Internal CSA Notes
** this device is located @ 1285 Upper Hembree Rd Roswell, GA 30076"
12/11/2025 mklose rcvd email from Kimberly, confirm Bruce March 5th @noon
12/11/2025 mklose rcvd email from Kimberly, adv this device is at Roswell location. Bruce is there March 5th @9am. Asked to do both devices at same time. adv yes, bruce can do this device @11
12/10/2025 mklose sent email to Kimberly for assistance with POC
11/10/2025 EMartin sent email to Natasha Lobban-Malone natasha.lobban@northside.com for update on device
🔧
Work Performed
Performed Annual PM as per Service Manual Instructions. All required PA results pass.
🔍
Technician Findings
Performed Annual PM as per Service Manual Instructions. All required PA results pass.
⚠️
Problem Description
EPIQ CVx Ultrasound System
Installed Product 88960667 - USD20B0677
📞
Call Description
PM - Contract - BG Required PM
📋
0-0-0
Completed
Apr 21, 2026
Tech Supervisor Spot Check
# of Critical Defects: 0
# of Major Defects: 0
# of Minor Defects: 0
# of EMSAR Defects: 0
Ultrasound - PM
a. Tools : Electrical Safety & Phantom -YES
b. Prontoforms – uploaded and correct template -YES
c. CSR – signed and uploaded to ServiceMax-YES
📧
Email_Scheduled
Completed
Dec 11, 2025
12/11/2025 mklose rcvd email from Kimberly, confirm Bruce March 5th @noon
📧
Email_Confirmed
Completed
Dec 11, 2025
12/11/2025 mklose rcvd email from Kimberly, adv this device is at Roswell location. Bruce is there March 5th @9am. Asked to do both devices at same time. adv yes, bruce can do this device @11
📧
Email
Completed
Dec 10, 2025
12/10/2025 mklose sent email to Kimberly for assistance with POC
Nov 6, 2025 3:57pm
Hi, @Erin Martin. This is the work order requested per the below. Thanks!
PM - Contract - BG Required PM
WO-12066902 / USD20B0677
Northside Hospital Inc
1000 Johnson Ferry Rd
Atlanta, GA 30342
📅
WO-01313544 - Preventive Maintenance - Ultrasound - Roswell - Northside Hospital Inc
Mar 5, 2026 12:00pm – 2:00pm
Work Order: WO-01313544
Account: PHILIPS HEALTHCARE
Customer Case Number: WO-12066902
Location: Northside Hospital Inc
Address: 1285 Upper Hembree Rd, Roswell, GA 30076
Manufacturer: Philips Healthcare
Model #: Ultrasound
Serial #: USD20B0677
Contact Name: Kimberly Stone
Contact Phone: (678) 241-166
Case #00541832 – URGENT Philips WO Request
Status: Closed | Priority: High
💬
Case Comment
Internal
Nov 6, 2025 4:02pm
11/06/2025 JRolston - Created EWO's accordingly.
Timeline
📞
Case Number:
00541832
Subject:
URGENT Philips WO Request
Status:
Closed
📋
Work Order:
WO-01313544
Type:
Preventive Maintenance
Priority:
PC
✅
From:
Entered
To:
Ready for Release
Duration in Previous:
28m
📅
From:
Ready for Release
To:
Ready for Scheduling
Duration in Previous:
34d 18h
👷
📅
Scheduled For:
2026-03-05T17:00:00.000+0000
🗓️
From:
Ready for Scheduling, Scheduled
To:
Scheduled, Ready for Release
Duration in Previous:
1d 5h, 1m
📅
👷
Technician:
a0hVU000002ifixYAA, Bruce Ballard
👷
From:
Ready for Scheduling
To:
Assigned
Duration in Previous:
2m
🗓️
From:
Assigned
To:
Scheduled
Duration in Previous:
1m
📅
Scheduled For:
2026-03-05T17:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
79d 22h
⏱️
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
8h 38m, 0m
⏱️
📋
From:
Closed
To:
07e-Partial Project
Duration in Previous:
6d 11h
📄
From:
07e-Partial Project
To:
Ready to Bill
Duration in Previous:
6h 53m
💰
From:
Ready to Bill
To:
Invoiced
Duration in Previous:
11h 59m
Bottlenecks
Ready for Scheduling
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Scheduled
Duration: 54.7 business days (threshold: 2.0 business days)
Exceeded by 52.7 business days
Tech On Site
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 0.6 business hours
Closed
Duration: 5.0 business days (threshold: 1.0 business days)
Exceeded by 4.0 business days
Ready to Bill
Duration: 1.5 business days (threshold: 1.0 business days)
Exceeded by 4.0 business hours
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Mar 5, 12:00 PM
Work Details (6)
Name
Type
Status
Qty
Amount
Date
WL-03132642
Labor
Open
1
$0.00
Mar 5, 8:20 PM
WL-03132643
Labor
Open
2
$275.00
Mar 5, 8:20 PM
WL-03132644
Labor
Open
1
$0.00
Mar 5, 8:20 PM
WL-03132645
Travel
Open
32
$0.00
Mar 5, 8:20 PM
WL-03132646
Travel
Open
31
$0.00
Mar 5, 8:20 PM
WL-03140862
Labor
Open
0.016666666666667
$38.00
Mar 12, 9:05 AM