Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Mar 31, 2026
✓ SLA Met (14 biz days early)
🕐 Clock stopped: Completed (Mar 11, 2026)
▶ Clock Running
Status: Created
Dec 22 → Dec 22, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 22 → Dec 22, 2025
0 business days (counted)
Running total: 0 of ? biz days used
18d
▶ Clock Running
Status: Assigned
Dec 22 → Jan 20, 2026
18 business days (counted)
Running total: 18 of ? biz days used
34d
▶ Clock Running
Status: Scheduled
Jan 20 → Mar 10, 2026
34 business days (counted)
Running total: 52 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 10 → Mar 11, 2026
1 business day (counted)
Running total: 53 of ? biz days used
Created: Dec 22, 2025
Completed: Mar 11, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 22 → Dec 22
Created
▶ Running
0
0
Dec 22 → Dec 22
Ready for Scheduling
▶ Running
0
0
Dec 22 → Jan 20
Assigned
▶ Running
18
18
Jan 20 → Mar 10
Scheduled
▶ Running
34
52
Mar 10 → Mar 11
Tech On Site
▶ Running
1
53
Coordinators
53.6 days
Over SLA
Field Work
2.0 days
Over SLA
Billing
20.1 days
Over SLA
Created: Dec 22, 2025
Due: Mar 31, 2026
Completed: Mar 11, 2026 (20 days early)
⏱️
34.6d in Scheduled
Longest Stage
🔄
11 transitions
Status Changes
⚠️
70.0d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00553455
6008293928
Closed
20L
SYS-LC-1260
Contract ends 11/22/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1312B
DEACB04280 1260 Binary Pump
G1322A
JPAAJ80901 1260 Standard Degasser
G1329B
DEAAC14205 1260 Standard Autosampler
G1316A
DEACN15583 1260 Thermostatted Column Compartment
G4212B
DEAA303811 1260 Diode Array Detector
🚨
Primary Delay
34.6 days stuck in "Scheduled"
⏱️
Total Delay
70.0 business days over SLA thresholds
SLA vs Actual Time by Status
Ready for Scheduling
0.0d
/ 1.0d SLA
Assigned
19.0d
/ 0.5d SLA
Scheduled
34.6d
/ 2.0d SLA
Tech On Site
1.9d
/ 1.0d SLA
Completed
0.1d
/ 1.0d SLA
Ready to Bill
20.0d
/ 1.0d SLA
Billing Review
0.0d
/ 2.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
Please assign to Hermilo Solano
ARP to site is 19 miles. Zone 1
🔧
Work Performed
Performed annual Preventative Maintenance. All required PM parts were replaced. All recommended PM tests passed.
🔍
Technician Findings
N/A
⚠️
Problem Description
20L
SYS-LC-1260
Contract ends 11/22/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1312B
DEACB04280 1260 Binary Pump
G1322A
JPAAJ80901 1260 Standard Degasser
G1329B
DEAAC14205 1260 Standard Autosampler
G1316A
DEACN15583 1260 Thermostatted Column Compartment
G4212B
DEAA303811 1260 Diode Array Detector
📄
Description
LC 1260 System
📞
Call Description
MAR 2026 LC GORILLA PM
📅
WO-01327582 - Preventive Maintenance - DD: 03/31/2026 - SYS-LC-1260 - Chino - Diamond Wipes International Inc
Mar 10, 2026 11:30am – 2:00am
Work Order: WO-01327582
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008293928
Location: Diamond Wipes International Inc
Address: 4651 Schaefer Ave, Chino, CA 91710
Manufacturer:
Model #: SYS-LC-1260
Serial #: S-Diam-LC-1248393-15956
Contact Name: Carmina Pingue
Contact Phone: 9092309
Timeline
📞
📋
Work Order:
WO-01327582
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered
To:
Ready for Scheduling
Duration in Previous:
0m
👷
From:
Ready for Scheduling
To:
Assigned
Duration in Previous:
1m
👷
Technician:
a0hVU000000HkpeYAC, Hermilo Solano
🗓️
📅
Scheduled For:
2026-03-10T15:30:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
48d 21h
⏱️
Type:
Labor
Status:
Open
Qty:
1
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
6.25, 0.5, 20
🔩
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
1d 6h
🏁
From:
Completed
To:
Closed
Duration in Previous:
45m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
14h 39m
💵
From:
Ready to Bill
To:
Billing Review
Duration in Previous:
25d 1h
📄
From:
Billing Review
To:
Ready to Bill
Duration in Previous:
7m
📨
From:
Ready to Bill
To:
Invoice Pending
Duration in Previous:
1d 0h
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
20m
🧾
Invoice Number:
SM-258564
Bottlenecks
Assigned
Duration: 19.0 business days (threshold: 4.0 business hours)
Exceeded by 18.5 business days
Scheduled
Duration: 34.6 business days (threshold: 2.0 business days)
Exceeded by 32.6 business days
Tech On Site
Duration: 1.9 business days (threshold: 1.0 business days)
Exceeded by 7.5 business hours
Closed
Duration: 1.0 business days (threshold: 1.0 business days)
Exceeded by 0.2 business hours
Ready to Bill
Duration: 18.0 business days (threshold: 1.0 business days)
Exceeded by 17.0 business days
Ready to Bill
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 8.0 business hours
ℹ️ Work Order Details
Type
Preventive Maintenance
Technician
Hermilo Solano
Scheduled
Mar 10, 11:30 AM
Work Details (9)
Name
Type
Status
Qty
Amount
Date
WL-03137942
Labor
Open
1
$75.00
Mar 10, 4:58 PM
WL-03137985
Labor
Open
6.25
$484.00
Mar 10, 5:27 PM
WL-03137986
Labor
Open
0.5
$37.50
Mar 10, 5:27 PM
WL-03137987
Travel
Open
20
$0.00
Mar 10, 5:27 PM
WL-03137988
Travel
Open
20
$0.00
Mar 10, 5:27 PM
WL-03140107
Parts
Open
1
$0.00
Mar 11, 7:00 PM
WL-03140108
Parts
Open
1
$0.00
Mar 11, 7:00 PM
WL-03140109
Parts
Open
1
$0.00
Mar 11, 7:00 PM
WL-03140110
Parts
Open
1
$0.00
Mar 11, 7:00 PM