Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Apr 30, 2026
✓ SLA Met (11 biz days early)
🕐 Clock stopped: Completed (Apr 15, 2026)
▶ Clock Running
Status: Created
Feb 16 → Feb 16, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Feb 16 → Feb 16, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Feb 16 → Feb 20, 2026
4 business days (counted)
Running total: 4 of ? biz days used
38d
▶ Clock Running
Status: Scheduled
Feb 20 → Apr 15, 2026
38 business days (counted)
Running total: 42 of ? biz days used
▶ Clock Running
Status: Tech On Site
Apr 15 → Apr 15, 2026
0 business days (counted)
Running total: 42 of ? biz days used
Created: Feb 16, 2026
Completed: Apr 15, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Feb 16 → Feb 16
Created
▶ Running
0
0
Feb 16 → Feb 16
Ready for Scheduling
▶ Running
0
0
Feb 16 → Feb 20
Assigned
▶ Running
4
4
Feb 20 → Apr 15
Scheduled
▶ Running
38
42
Apr 15 → Apr 15
Tech On Site
▶ Running
0
42
Coordinators
42.2 days
Over SLA
Billing
4.9 days
Over SLA
Created: Feb 16, 2026
Due: Apr 30, 2026
Completed: Apr 15, 2026 (15 days early)
⏱️
38.2d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
44.6d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00568636
6008340839
Closed
28U
SYS-LC-1260IIE
Contract ends 09/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G7116A
DEAEM07398 1260 Infinity II Multicolumn Thermostat
G7104C
DEAGZ02055 1260 Infinity II Flexible Pump
G7102A
GB20500012 1290 Infinity II ELSD
G7167A
DEAGY01971 1260 Infinity II Multisampler
G7115A
DEAC618123 1260 Infinity II Diode Array Detector WR
🚨
Primary Delay
38.2 days stuck in "Scheduled"
⏱️
Total Delay
44.6 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
38.2d
/ 2.0d SLA
Tech On Site
1.0d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
4.9d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📋 Tasks (1)
📅 Events (1)
🔒
Internal CSA Notes
20 Feb 2026 Larry Alberty
Reached out for scheduling
Please assign to Larry Alberty ARP to site is 20 miles. Zone 1
🔧
Work Performed
Completed LC PM.
⚠️
Problem Description
28U
SYS-LC-1260IIE
Contract ends 09/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G7116A
DEAEM07398 1260 Infinity II Multicolumn Thermostat
G7104C
DEAGZ02055 1260 Infinity II Flexible Pump
G7102A
GB20500012 1290 Infinity II ELSD
G7167A
DEAGY01971 1260 Infinity II Multisampler
G7115A
DEAC618123 1260 Infinity II Diode Array Detector WR
📄
Description
1260 Infinity II Flexible Pump
📞
Call Description
APR 2026 LC PM
📞
Call
Completed
Feb 20, 2026
20 Feb 2026 Larry Alberty
Reached out for scheduling
📅
WO-01351812 - Preventive Maintenance - DD: 04/30/2026 - G7104C - Redwood City - Codexis Inc
Apr 15, 2026 9:00am – 3:00pm
Work Order: WO-01351812
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008340839
Location: Codexis Inc
Address: 400 Penobscot Dr, Redwood City, CA 94063
Manufacturer: Agilent
Model #: G7104C
Serial #: DEAGZ02055
Contact Name: Roy Yeung
Contact Phone: 510 371 1776
Contact Email: roy.yeung
Timeline
📞
Case Number:
00568636
Subject:
6008340839
Status:
Closed
📋
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Larry Alberty
🗓️
📅
Scheduled For:
2026-04-15T13:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
53d 15h
🚗
Type:
Travel, Parts
Status:
Open
Qty:
20, 1
⏱️
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
9h 30m
🏁
From:
Completed
To:
Closed
Duration in Previous:
1m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
1d 16h
📨
From:
Ready to Bill
To:
Invoice Pending
Duration in Previous:
6d 3h
🧾
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
10m
Bottlenecks
Assigned
Duration: 4.0 business days (threshold: 4.0 business hours)
Exceeded by 3.5 business days
Scheduled
Duration: 38.2 business days (threshold: 2.0 business days)
Exceeded by 36.2 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Ready to Bill
Duration: 4.9 business days (threshold: 1.0 business days)
Exceeded by 3.9 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Apr 15, 9:00 AM
Work Details (9)
Name
Type
Status
Qty
Amount
Date
WL-03186785
Travel
Open
20
$0.00
Apr 15, 10:47 AM
WL-03186786
Travel
Open
20
$0.00
Apr 15, 10:47 AM
WL-03186787
Parts
Open
1
$0.00
Apr 15, 10:47 AM
WL-03186788
Parts
Open
1
$0.00
Apr 15, 10:47 AM
WL-03186789
Parts
Open
1
$0.00
Apr 15, 10:47 AM
WL-03186790
Parts
Open
1
$0.00
Apr 15, 10:47 AM
WL-03187718
Labor
Open
1
$75.00
Apr 15, 7:45 PM
WL-03187719
Labor
Open
1
$75.00
Apr 15, 7:45 PM
WL-03187720
Labor
Open
5
$544.50
Apr 15, 7:45 PM