38R
SYS-LC-1260
Contract ends 12/31/2026 repair included
PMPLUS / EOQ
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G1315D-B
DE64263535 1200 Series Diode Array Detector
G1330B-B
DE84970260 1200 Cooled Thermostatted ALS
G1312B
DE63059979 1260 Binary Pump
G1379B
JP82009420 1260 Infinity Micro Degasser.
G1316B
DE60559665 1200 Series Thermost. Col. Compartm. SL
G1367D
DE82555287 1200 Series High Performance ALS SL Plus
Started PM. Stopped PM due to repair parts on back order.
20 Feb 2026 Larry Alberty
Reached out for scheduling
Please assign to Larry Alberty ARP to site is 13 miles. Zone 1
🔧Work Performed
01 April 2026
Started PM. Stopped PM due to repair parts on back order.
14 April 2026 Completed LC PM.
⚠️Problem Description
38R
SYS-LC-1260
Contract ends 12/31/2026 repair included
PMPLUS / EOQ
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G1315D-B
DE64263535 1200 Series Diode Array Detector
G1330B-B
DE84970260 1200 Cooled Thermostatted ALS
G1312B
DE63059979 1260 Binary Pump
G1379B
JP82009420 1260 Infinity Micro Degasser.
G1316B
DE60559665 1200 Series Thermost. Col. Compartm. SL
G1367D
DE82555287 1200 Series High Performance ALS SL Plus
📄Description
LC 1260 System
📞Call Description
APR 2026 LC PMPLUS
📞
Call
Completed Apr 1, 2026
01 April 2026 Larry Alberty
Started PM. Stopped PM due to repair parts on back order.
📞
Call
Completed Feb 20, 2026
20 Feb 2026 Larry Alberty
Reached out for scheduling
Timeline
📞
▶
5
Case Linked Feb 17, 8:39 AM
Case Linked → Work Order Created → Status: Ready for Scheduling → Technician Assigned → Status: Assigned
📋
Work Order Created
Work Order:WO-01352264
Type:Preventive Maintenance
Priority:PC
📅
Status: Ready for Scheduling by Leona Coonrod
From:Entered
To:Ready for Scheduling
Duration in Previous:1m
👷
Technician Assigned by Leona Coonrod
Technician:Larry Alberty
👷
Status: Assigned by Leona Coonrod
From:Ready for Scheduling
To:Assigned
Duration in Previous:1m
⚠️5.0 business days
🗓️
▶
2
Status: Scheduled Feb 23, 10:50 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Larry Alberty
Scheduled For:2026-04-01T13:00:00.000+0000
🚨28.0 business days
🔧
Status: Tech On Site by Larry AlbertyApr 1, 9:56 AM
From:Scheduled
To:Tech On Site
Duration in Previous:36d 22h
🔄
▶
3
Status: Reschedule Apr 1, 10:31 PM
Status: Reschedule → 5x Labor Added → 3x Parts Added
⏱️
5x Labor Added
Type:Labor, Travel
Status:Open
Qty:1, 3, 20
🔩
3x Parts Added
Type:Parts
Status:Open
Qty:1
⚠️9.2 business days
⏱️
▶
2
5x Labor Added Apr 14, 5:39 PM
5x Labor Added → Status: Completed
✔️
Status: Completed by Larry Alberty
From:Reschedule
To:Completed
Duration in Previous:12d 19h
🏁
Status: Closed by Larry AlbertyApr 14, 5:50 PM
From:Completed
To:Closed
Duration in Previous:10m
⏳1.8 business days
📄
Status: Ready to Bill by Hannah ShawApr 15, 6:00 PM
From:Closed
To:Ready to Bill
Duration in Previous:1d 0h
⚠️6.7 business days
📨
Status: Invoice Pending by Hannah ShawApr 23, 4:23 PM
From:Ready to Bill
To:Invoice Pending
Duration in Previous:7d 22h
🧾
▶
2
Invoice Created Apr 23, 4:33 PM
Invoice Created → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From:Invoice Pending
To:Invoiced
Duration in Previous:10m
Bottlenecks
Assigned
Duration: 5.0 business days (threshold: 4.0 business hours)
Exceeded by 4.5 business days
Scheduled
Duration: 28.0 business days (threshold: 2.0 business days)
Exceeded by 26.0 business days
Tech On Site
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.5 business hours
Reschedule
Duration: 9.0 business days (threshold: 2.0 business days)
Exceeded by 7.0 business days
Closed
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.2 business hours
Ready to Bill
Duration: 6.2 business days (threshold: 1.0 business days)