Cleaned device externals
Cleared stored ePHI
Visual Inspection; Passed
AM12 Condition; Good (S/N:_____125010000447_______)
Battery Date Code = ___2025____
Battery Test - No Load - (> 12.5VDC) = ___12.91____VDC
Battery Test - 10Ω25W - (>11.7VDC) after 10 sec = ___12.55____VDC
Current Test - Power OFF - (< 250uA) = ___117.86____uA
Current Test - Power ON - (< 1.1A) = ____0.32___A
Current Test - Charging voltage (13.0 - 14.7 VDC) = ___13.64____VDC
Touchscreen Calibrated
Date/Time; Updated
Auto Test; Passed
Writer Test; Passed
Printhead in good condition, cleaned, Que verified
Performance Tested EKG Leads @ 30, 60, 80, 120 BPM; Passed
Lead-off Warning; Verified
Noise Test; Passed
Electrical Safety Test; Passed
Enclosure Leakage Current measured >300µA; Passed
Patient Leakage Current measured >10µA; Passed
PM Completed
🔍Technician Findings
Was able to duplicate issue. Unit was able to read the leads, but had intermediate loss of connection and also thought lead 3 and lead 4 were switched when they were not. Unit will need a new battery, WiFi antenna, paper, lead wires and clips
⚠️Problem Description
Work Order #124638
EKG as it is not working again and light on lead connection is orange.
Burdick - ELI 280
Asset ID# 12946609
S/N: 123110000954 https://www.ebiotrack.com/workorder.php?wo=71331
📄Description
ECG, BURDICK 280 INTERP 200 ECG STORAGE AM12/USB/LAN
Oak Street Health’s Consigned Inventory
Timeline
📞
Case Linked Dec 4, 12:31 PM
Case Number:00548884
Subject:Oak Street Health - 48 Hour - 124638: New Work Order Assigned
Status:Closed
🚨40.0 business days
📋
▶
2
Work Order Created Feb 2, 4:55 PM
Work Order Created → Status: Assigned
👷
Status: Assigned by Samuel Klein
From:Tech On Site
To:Assigned
Duration in Previous:0m
🔧
▶
2
Status: Tech On Site Feb 3, 9:34 AM
Status: Tech On Site → 7x Parts Added
🔩
7x Parts Added
Type:Parts, Labor
Status:Open
Qty:1
✔️
▶
2
Status: Completed Feb 3, 10:19 AM
Status: Completed → Status: Closed
🏁
Status: Closed by Samuel Klein
From:Completed
To:Closed
Duration in Previous:1m
📄
Status: Ready to Bill by Diane PattonFeb 4, 9:32 AM
From:Closed
To:Ready to Bill
Duration in Previous:23h 10m
🚨17.0 business days
📨
Status: Invoice Pending by Diane PattonFeb 28, 1:13 PM
From:Ready to Bill
To:Invoice Pending
Duration in Previous:24d 3h
🧾
▶
2
Invoice Created Feb 28, 1:18 PM
Invoice Created → Status: Invoiced
💰
Status: Invoiced by Diane Patton
From:Invoice Pending
To:Invoiced
Duration in Previous:5m
Bottlenecks
Assigned
Duration: 1.3 business days (threshold: 4.0 business hours)
Exceeded by 6.1 business hours
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Ready to Bill
Duration: 17.0 business days (threshold: 1.0 business days)