Please complete Pro28Z Courtesy Upgrade
Take current Pro28Z trunk stock with you onsite in case of repairs found
Tech Findings: Please list the state of the cot upon arrival documenting any damage found. Take photos of any customer damage and attach to the work order
Work Performed: List the actions taken to complete the upgrade and the final condition of the cot.
If repairs are needed: please contact Ferno (repairs are out of scope to project and so require approval)
1-800-733-3766 Option 4
or
937-283-2855
State your name and that you work at EMSAR onsite at a Pro28Z Upgrade and found a repair
Describe the repair needed
Ask if it is covered under warranty and confirm they are shipping parts.
Technician must still update the tech findings/ work performed and enter the parts order on the work order- Note in the Shipping and Receiving notes 'Ferno Shipping parts'
Work Order will update to Awaiting Parts.
Once tracking is received in Dispatch will update the order status to reschedule and enter the tracking on the work order & place into reschedule
WDL:
Upgrade: Flat rate charge
Out of Scope Labor: to capture repairs
Use your travel and mileage WDL as well - these are covered under the flat rate cost for the project
Kit Part Numbers to be consumed in parts
0800659 Leg Upgrade Kit
0806070 Safety Lock Kit
Select 'Customer Supplied Part'
Please see link for letter of authorization and reference to training material.
https://emsar.sharepoint.com/sites/EMSARTechOps/Technical%20Document%20Library/Forms/AllItems.aspx?csf=1&web=1&e=alr9Yt&cid=feb00817%2Dc80e%2D4c7f%2Da4ad%2D21314f625cf1&RootFolder=%2Fsites%2FEMSARTechOps%2FTechnical%20Document%20Library%2FFerno%2FEMS%2FAmbulance%20Cots%2FManual%20Cots%2FPro%2028Z%20Cot%2FFerno%20Voluntary%20Product%20Correction%20Pro%2028Z%20Leg%20Assembly&FolderCTID=0x01200007AEA6501CDD1040A6ACB2A37FDB4D03
2/28/2025 Sramen - received teams message from MBjorem at 9:42pm CT asking to assign to Rene Yescas. When I saw the message, Rene had already pulled the WO from hold status and completed documentation. I still had to assign to Rene so I assigned, then marked it serviced and sent chatter to Rene.
1/17 Cwassam found behind Wyatt these were all updated to the correct address in Los Angeles, Ca removal of tech
🔧Work Performed
disinfect,clean,lube,adjust hardware as needed,installed final leg upgrade kit,service complete
🔍Technician Findings
per ferno install final leg upgrade kit
⚠️Problem Description
Please complete Pro28Z Courtesy Upgrade
Take current Pro28Z trunk stock with you onsite in case of repairs found
Tech Findings: Please list the state of the cot upon arrival documenting any damage found. Take photos of any customer damage and attach to the work order
Work Performed: List the actions taken to complete the upgrade and the final condition of the cot.
If repairs are needed: please contact Ferno (repairs are out of scope to project and so require approval)
1-800-733-3766 Option 4
or
937-283-2855
State your name and that you work at EMSAR onsite at a Pro28Z Upgrade and found a repair
Describe the repair needed
Ask if it is covered under warranty and confirm they are shipping parts.
Technician must still update the tech findings/ work performed and enter the parts order on the work order- Note in the Shipping and Receiving notes 'Ferno Shipping parts'
Work Order will update to Awaiting Parts.
Once tracking is received in Dispatch will update the order status to reschedule and enter the tracking on the work order & place into reschedule
WDL:
Upgrade: Flat rate charge
Out of Scope Labor: to capture repairs
Use your travel and mileage WDL as well - these are covered under the flat rate cost for the project
Kit Part Numbers to be consumed in parts
0800659 Leg Upgrade Kit
0806070 Safety Lock Kit
Select 'Customer Supplied Part'
Please see link for letter of authorization and reference to training material.
https://emsar.sharepoint.com/sites/EMSARTechOps/Technical%20Document%20Library/Forms/AllItems.aspx?csf=1&web=1&e=alr9Yt&cid=feb00817%2Dc80e%2D4c7f%2Da4ad%2D21314f625cf1&RootFolder=%2Fsites%2FEMSARTechOps%2FTechnical%20Document%20Library%2FFerno%2FEMS%2FAmbulance%20Cots%2FManual%20Cots%2FPro%2028Z%20Cot%2FFerno%20Voluntary%20Product%20Correction%20Pro%2028Z%20Leg%20Assembly&FolderCTID=0x01200007AEA6501CDD1040A6ACB2A37FDB4D03
📄Description
Ferno Model Pro 28Z Chair Cot
Timeline
📞
Case Linked Oct 22, 8:24 AM
Case Number:00436538
Subject:
Status:Closed
📋
▶
2
Work Order Created Oct 22, 8:32 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Destiny Rinehart
From:Entered
To:Ready for Scheduling
Duration in Previous:0m
👷
▶
2
Technician Assigned Oct 22, 11:01 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Carrie Wassam
From:Ready for Scheduling
To:Assigned
Duration in Previous:2h 28m
⚠️6.0 business days
⏸️
Status: On Hold by Scott BerryOct 29, 1:05 PM
From:Assigned
To:On Hold
Duration in Previous:7d 2h
🚨82.0 business days
🔩
▶
3
2x Parts Added Feb 28, 9:54 PM
2x Parts Added → Status: Completed → Dispatch Scheduled
✔️
Status: Completed by Rene Yescas
From:On Hold
To:Completed
Duration in Previous:122d 9h
📅
Dispatch Scheduled by Rene Yescas
Scheduled For:2025-02-28T13:00:00.000+0000
👷
▶
2
Technician Assigned Mar 1, 12:28 AM
Technician Assigned → Dispatch Scheduled
📅
Dispatch Scheduled by Stephanie Ramen
Scheduled For:2025-02-28T19:00:00.000+0000
🏁
Status: Closed by Rene YescasMar 1, 9:50 AM
From:Completed
To:Closed
Duration in Previous:11h 55m
⏳1.0 business days
📄
▶
3
Status: Ready to Bill Mar 3, 12:43 PM
Status: Ready to Bill → Status: Invoice Pending → Status: Invoiced
📨
Status: Invoice Pending by Brooke Alexander
From:Ready to Bill
To:Invoice Pending
Duration in Previous:3m
💰
Status: Invoiced by Brooke Alexander
From:Invoice Pending
To:Invoiced
Duration in Previous:1m
⏳3.0 business days
🧾
Invoice Created Mar 5, 1:19 PM
Invoice Number:SM-219615
Bottlenecks
Assigned
Duration: 6.0 business days (threshold: 4.0 business hours)