Please complete Pro28Z Courtesy Upgrade
Take current Pro28Z trunk stock with you onsite in case of repairs found
Tech Findings: Please list the state of the cot upon arrival documenting any damage found. Take photos of any customer damage and attach to the work order
Work Performed: List the actions taken to complete the upgrade and the final condition of the cot.
If repairs are needed: please contact Ferno (repairs are out of scope to project and so require approval)
1-800-733-3766 Option 4
or
937-283-2855
State your name and that you work at EMSAR onsite at a Pro28Z Upgrade and found a repair
Describe the repair needed
Ask if it is covered under warranty and confirm they are shipping parts.
Technician must still update the tech findings/ work performed and enter the parts order on the work order- Note in the Shipping and Receiving notes 'Ferno Shipping parts'
Work Order will update to Awaiting Parts.
Once tracking is received in Dispatch will update the order status to reschedule and enter the tracking on the work order & place into reschedule
WDL:
Upgrade: Flat rate charge
Out of Scope Labor: to capture repairs
Use your travel and mileage WDL as well - these are covered under the flat rate cost for the project
Kit Part Numbers to be consumed in parts
0800659 Leg Upgrade Kit
0806070 Safety Lock Kit
Select 'Customer Supplied Part'
Please see link for letter of authorization and reference to training material.
https://emsar.sharepoint.com/sites/EMSARTechOps/Technical%20Document%20Library/Forms/AllItems.aspx?csf=1&web=1&e=alr9Yt&cid=feb00817%2Dc80e%2D4c7f%2Da4ad%2D21314f625cf1&RootFolder=%2Fsites%2FEMSARTechOps%2FTechnical%20Document%20Library%2FFerno%2FEMS%2FAmbulance%20Cots%2FManual%20Cots%2FPro%2028Z%20Cot%2FFerno%20Voluntary%20Product%20Correction%20Pro%2028Z%20Leg%20Assembly&FolderCTID=0x01200007AEA6501CDD1040A6ACB2A37FDB4D03
6/27 KHensley scheduled per logged email from Patricia
6/24 KHensley Patricia called me back to schedule for the schools in HI for the Ferno cots. She is going to reach out to the school admins and reach back out to confirm. Call logged on WO-01211080
3-4 Pgreen unassigned and move to hold status- We are not sending anyone to HI unless ferno is paying for the trip. Marcus has informed the necessary people
3/4/25 LH Cleaning up project Ferno has provided evidence that the part shipped last november. No tracking received. Please confirm the parts are onsite still when calling to schedule before sending technician. Please escalate to account management if kits are no longer onsite.
2-28 Pgreen unassigned and move to hold status- We are not sending anyone to HI unless ferno is paying for the trip. Marcus has informed the necessary people
1-17 Pgreen FSE was not able to complete these on this trip- out of time
🔧Work Performed
installed parts. tested chair function. Cycled cot 3 times. All functions passed. straightened out hand guard, reinstalled
🔍Technician Findings
ferno leg upgrade, parts sent to site. hand guard patient left bent inward.
⚠️Problem Description
Please complete Pro28Z Courtesy Upgrade
Take current Pro28Z trunk stock with you onsite in case of repairs found
Tech Findings: Please list the state of the cot upon arrival documenting any damage found. Take photos of any customer damage and attach to the work order
Work Performed: List the actions taken to complete the upgrade and the final condition of the cot.
If repairs are needed: please contact Ferno (repairs are out of scope to project and so require approval)
1-800-733-3766 Option 4
or
937-283-2855
State your name and that you work at EMSAR onsite at a Pro28Z Upgrade and found a repair
Describe the repair needed
Ask if it is covered under warranty and confirm they are shipping parts.
Technician must still update the tech findings/ work performed and enter the parts order on the work order- Note in the Shipping and Receiving notes 'Ferno Shipping parts'
Work Order will update to Awaiting Parts.
Once tracking is received in Dispatch will update the order status to reschedule and enter the tracking on the work order & place into reschedule
WDL:
Upgrade: Flat rate charge
Out of Scope Labor: to capture repairs
Use your travel and mileage WDL as well - these are covered under the flat rate cost for the project
Kit Part Numbers to be consumed in parts
0800659 Leg Upgrade Kit
0806070 Safety Lock Kit
Select 'Customer Supplied Part'
Please see link for letter of authorization and reference to training material.
https://emsar.sharepoint.com/sites/EMSARTechOps/Technical%20Document%20Library/Forms/AllItems.aspx?csf=1&web=1&e=alr9Yt&cid=feb00817%2Dc80e%2D4c7f%2Da4ad%2D21314f625cf1&RootFolder=%2Fsites%2FEMSARTechOps%2FTechnical%20Document%20Library%2FFerno%2FEMS%2FAmbulance%20Cots%2FManual%20Cots%2FPro%2028Z%20Cot%2FFerno%20Voluntary%20Product%20Correction%20Pro%2028Z%20Leg%20Assembly&FolderCTID=0x01200007AEA6501CDD1040A6ACB2A37FDB4D03